Log in to see the plans as drawn6.0 CONCLUSIONS
An integrated water management approach has been used to assess the site’s stormwater requirements and
water management needs. In summary:
Subdivision will improve current flooding situation for many adjacent properties, and provide an overland
flow path for this subdivision and surrounding area.
Subdivision catchment follows Council Master Drainage Catchments
Proposed Bio-retention basin will treat new subdivision flow to Council requirements.
Proposed Detention basin will lower new subdivision catchment area flow to pre-development levels.
pg. 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.