Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Appendix B - Stormwater Management Plan

Attached to the e-mail Response to Council's Request for Information (REC17 /0011) - Email 01 of 01.

of 13

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
6.0     CONCLUSIONS
An integrated water management approach has been used to assess the site’s stormwater requirements and
water management needs. In summary:

       Subdivision will improve current flooding situation for many adjacent properties, and provide an overland
        flow path for this subdivision and surrounding area.
       Subdivision catchment follows Council Master Drainage Catchments
       Proposed Bio-retention basin will treat new subdivision flow to Council requirements.
       Proposed Detention basin will lower new subdivision catchment area flow to pre-development levels.




                                                                                                            pg. 12
Log in to download the original file

Appendix B - Stormwater Management Plan.pdf · 398 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.