Skip to the record
The only place to find full transcripts.

Original source · versioned page text

Appendix B - Stormwater Management Plan

Attached to the e-mail Response to Council's Request for Information (REC17 /0011) - Email 01 of 01.

of 13

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
CONTENTS
SUMMARY .................................................................................................................................. 3
1.0     INTRODUCTION ................................................................................................................ 3
2.0     RESPONSE TO INFORMATION REQUEST .......................................................................... 3
3.0     SITE DESCRIPTION .......................................................................................................... 5
   3.1     Proposed Works ............................................................................................................. 5
4.0     WATER QUALITY MANAGEMENT PLAN.............................................................................. 6
   4.1     Proposed Stormwater Treatment System and Catchments ................................................... 6
      4.1.1     Bioretention Area ..................................................................................................... 6
5.0     FLOODING ASSESSMENT ................................................................................................. 8
   5.1     Existing Conditions.......................................................................................................... 8
   5.2     Proposed Drainage System .............................................................................................. 9
      5.2.1     Bioretention/Detention Capacity ................................................................................. 9
      5.2.2     Drainage Improvements/Non Worsening ..................................................................... 9
6.0     CONCLUSIONS ............................................................................................................... 12
7.0     APPENDIX – Council Master Stormwater Catchments ........................................................... 13




Eagle Rise Estate                                                                                                                pg. 2
Log in to download the original file

Appendix B - Stormwater Management Plan.pdf · 398 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.