Original source · versioned page text
Appendix B - Stormwater Management Plan
Attached to the e-mail Response to Council's Request for Information (REC17 /0011) - Email 01 of 01.
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Detention depth = 0.2m
Total filter + transition depth = 0.6m
It is to be vegetated with nutrient effective removing plants.
Lining:
The surrounding soils are clay to silty clays with a saturated hydraulic conductivity of approximately 3.6mm/hr. The
sandy loam media that is proposed as the filter media has a hydraulic conductivity of 382mm/hr, therefore the
conductivity of the filter media is > 10 times the conductivity of the surrounding soils and an impervious liner is not
considered to be required.
Eagle Rise Estate pg. 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.