Delegated Report REC14/0004 5 Stevens St Sunshine Beach
DELEGATED AUTHORITY REPORT
(c) all existing and proposed utility services and connections (eg. electricity,
telecommunications, water, sewerage) are wholly located within the lot they
serve, or alternatively included within an easement where location within the lot is
not possible.
(d) all retaining walls and structures are fully contained within the lot they retain.
(e) any fill, including fill batters, are wholly contained within the subject site and not
on adjacent properties.
Community Management Statement
5. Any proposed Community Management Statement required for the development
pursuant to the Body Corporate and Community Management Act 1997 must be
submitted to Council for endorsement at the same time as submission of the subdivision
plan to Council for compliance assessment.
Plan Sealing
6. Sealing of the plans shall not occur until such time that the approved duplex (Council Ref
MCU13/0261) has been constructed on site and a final building certificate has been
issued.
General
7. All works must be constructed and work procedure undertaken in accordance with:
(a) All relevant Council Planning Scheme Policies, standard drawings and
guidelines.
(b) The latest version of the Healthy Waterways document “Water Sensitive Urban
Design Technical Design Guidelines for South East Queensland” for all water
quality devices to be constructed on site.
(c) The list of approved plans, conditions of this Decision Notice and the relevant
conditions of the approval for Material of Change of Use and Operational Works
to which this approval relates.
Electricity and Telecommunication Services
8. An underground connection to reticulated electricity and telecommunication services
must be provided to each lot in accordance with the standards and requirements of the
relevant service provider.
9. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
10. Certification must be submitted to Council from all relevant service providers which
certifies that the development has met the requirements of this Decision Notice and all
applicable legislation at the time of construction.
Easements
11. Any required easements must be registered prior to commencement of use.
5. REFERRAL AGENCIES
Not Applicable.
FM6417/2-28/09/2012 Page 5 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report REC14/0004 5 Stevens St Sunshine BeachRelated documentApplication case desk ↗
About this file
- File size
- 346 KB (small file)
- File type
No other editions are linked here.