Appendix B - New Dwelling Plans

of 21

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Original PDF page 10, section 1. The text section number identifies this passage in the reader.

   WORK HEALTH AND SAFETY REPORT NOTES (MANAGING RISKS IN CONSTRUCTION)
   1. FALLS, SLIPS, TRIPS                                        2. FALLING OBJECTS (cont.)                                        4. SERVICES (cont.)                                               6. HAZ. SUBSTANCES (cont.)                                         7. CONFINED SPACES (cont.)

   a) WORKING AT HEIGHTS                                         PERSONS BELOW.                                                    SHOULD BE LOCATED USING AN APPROPRIATE SERVICE                    AGAINST INHALATION WHILE USING POWDERED                            EXCAVATION AND INSTALLATION OF ITEMS WITHIN
                                                                 1. PREVENT OR RESTRICT ACCESS TO AREAS BELOW                      (SUCH AS DIAL BEFORE YOU DIG), APPROPRIATE                        MATERIAL OR WHEN SANDING, DRILLING, CUTTING OR                     EXCAVATIONS. WHERE PRACTICAL, INSTALLATION
   DURING CONSTRUCTION                                              WHERE THE WORK IS BEING CARRIED OUT.                           EXCAVATION PRACTICE SHOULD BE USED AND, WHERE                     OTHERWISE DISTURBING OR CREATING POWDERED                          SHOULD BE CARRIED OUT USING METHODS WHICH DO
                                                                 2. PROVIDE TOE BOARDS TO SCAFFOLDING OR WORK                      NECESSARY, SPECIALIST CONTRACTORS SHOULD BE                       MATERIAL.                                                          NOT REQUIRE WORKERS TO ENTER THE EXCAVATION.
   WHEREVER POSSIBLE, COMPONENTS FOR THIS BUILDING
                                                                    PLATFORMS.                                                     USED.                                                                                                                                WHERE THIS IS NOT PRACTICAL, ADEQUATE SUPPORT FOR
   SHOULD BE PREFABRICATED OFF-SITE OR AT GROUND
   LEVEL TO MINIMISE THE RISK OF WORKERS FALLING
                                                                 3. PROVIDE PROTECTIVE STRUCTURE BELOW THE WORK                                                                                      TREATED TIMBER                                                     THE EXCAVATED AREA SHOULD BE PROVIDED TO
                                                                    AREA.                                                          OVERHEAD POWER LINES ARE NEAR OR ON THIS SITE.                    THE DESIGN OF THIS BUILDING INCLUDES PROVISION                     PREVENT COLLAPSE. WARNING SIGNS AND BARRIERS TO
   MORE THAN TWO METRES. HOWEVER, CONSTRUCTION
                                                                 4. ENSURE THAT ALL PERSONS BELOW THE WORK AREA                    THESE POSE A RISK OF ELECTROCUTION IF STRUCK OR                   FOR THE INCLUSION OF TREATED TIMBER WITHIN THE                     PREVENT ACCIDENTAL OR UNAUTHORISED ACCESS TO
   OF THIS BUILDING WILL REQUIRE WORKERS TO BE
                                                                    HAVE PERSONAL PROTECTIVE EQUIPMENT.                            APPROACHED BY LIFTING DEVICES OR OTHER PLANT                      STRUCTURE. DUST OR FUMES FROM THIS MATERIAL CAN                    ALL EXCAVATIONS SHOULD BE PROVIDED.
   WORKING AT HEIGHTS WHERE A FALL IN EXCESS OF TWO
                                                                                                                                   AND PERSONS WORKING ABOVE GROUND LEVEL.                           BE HARMFUL. PERSONS WORKING ON OR IN THE
   METRES IS POSSIBLE AND INJURY IS LIKELY TO RESULT             BUILDING COMPONENTS
   FROM SUCH A FALL. THE BUILDER SHOULD PROVIDE A
                                                                                                                                   WHERE THERE IS A DANGER OF THIS OCCURRING,                        BUILDING DURING CONSTRUCTION, OPERATIONAL                          8. PUBLIC ACCESS
                                                                 DURING CONSTRUCTION, RENOVATION OR DEMOLITION                     POWER LINES SHOULD BE, WHERE PRACTICAL,                           MAINTENANCE OR DEMOLITION SHOULD ENSURE GOOD
   SUITABLE BARRIER WHEREVER A PERSON IS REQUIRED TO
                                                                 OF THIS BUILDING, PARTS OF THE STRUCTURE INCLUDING                DISCONNECTED OR RELOCATED. WHERE THIS IS NOT                      VENTILATION AND WEAR PERSONAL PROTECTIVE
   WORK IN A SITUATION WHERE FALLING MORE THAN TWO                                                                                                                                                                                                                      PUBLIC ACCESS TO CONSTRUCTION AND DEMOLITION
                                                                 FABRICATED STEELWORK, HEAVY PANELS AND MANY                       PRACTICAL ADEQUATE WARNING IN THE FORM OF                         EQUIPMENT INCLUDING PROTECTION AGAINST
   METRES IS A POSSIBILITY.                                                                                                                                                                                                                                             SITES AND TO AREAS UNDER MAINTENANCE CAUSES RISK
                                                                 OTHER COMPONENTS WILL REMAIN STANDING PRIOR TO                    BRIGHT COLOURED TAPE OR SIGNAGE SHOULD BE USED                    INHALATION OF HARMFUL MATERIAL WHEN SANDING,
                                                                                                                                   OR A PROTECTIVE BARRIER PROVIDED.                                                                                                    TO WORKERS AND PUBLIC. WARNING SIGNS AND
   DURING OPERATION OR MAINTENANCE                               OR AFTER SUPPORTING PARTS ARE IN PLACE.                                                                                             DRILLING, CUTTING OR USING TREATED TIMBER IN ANY                   SECURE BARRIERS TO UNAUTHORISED ACCESS SHOULD
                                                                 CONTRACTORS SHOULD ENSURE THAT TEMPORARY                                                                                            WAY THAT MAY CAUSE HARMFUL MATERIAL TO BE
   CLEANING AND MAINTENANCE OF WINDOWS, WALLS,                                                                                                                                                                                                                          BE PROVIDED. WHERE ELECTRICAL INSTALLATIONS,
   ROOF OR OTHER COMPONENTS OF THIS BUILDING WILL
                                                                 BRACING OR OTHER REQUIRED SUPPORT IS IN PLACE AT                  5. MANUAL TASKS                                                   RELEASED. DO NOT BURN TREATED TIMBER.                              EXCAVATIONS, PLANT OR LOOSE MATERIALS ARE
                                                                 ALL TIMES WHEN COLLAPSE WHICH MAY INJURE
   REQUIRE PERSONS TO BE SITUATED WHERE A FALL FROM                                                                                                                                                                                                                     PRESENT THEY SHOULD BE SECURED WHEN NOT FULLY
   A HEIGHT IN EXCESS OF TWO METRES IS POSSIBLE. WHERE
                                                                 PERSONS IN THE AREA IS A POSSIBILITY.                             COMPONENTS WITHIN THIS DESIGN WITH A MASS IN                      VOLATILE ORGANIC COMPOUNDS                                         SUPERVISED.
   THIS TYPE OF ACTIVITY IS REQUIRED, SCAFFOLDING,                                                                                 EXCESS OF 25KG SHOULD BE LIFTED BY TWO OR MORE                    MANY TYPES OF GLUE, SOLVENTS, SPRAY PACKS, PAINTS,
                                                                 MECHANICAL LIFTING OF MATERIALS AND                               WORKERS OR BY MECHANICAL LIFTING DEVICE. WHERE                    VARNISHES AND SOME CLEANING MATERIALS AND
                                                                                                                                                                                                                                                                        9. OPERATIONAL USE OF BUILDING
   LADDERS OR TRESTLES SHOULD BE USED IN
                                                                 COMPONENTS DURING CONSTRUCTION, MAINTENANCE                       THIS IS NOT PRACTICAL, SUPPLIERS OR FABRICATORS                   DISINFECTANTS HAVE DANGEROUS EMISSIONS. AREAS
   ACCORDANCE WITH RELEVANT CODES OF PRACTICE,
                                                                 OR DEMOLITION PRESENTS A RISK OF FALLING OBJECTS.                 SHOULD BE REQUIRED TO LIMIT THE COMPONENT MASS.                   WHERE THESE ARE USED SHOULD BE KEPT WELL                           THIS BUILDING HAS BEEN DESIGNED AS A RESIDENTIAL
   REGULATIONS OR LEGISLATION.
                                                                 CONTRACTORS SHOULD ENSURE THAT APPROPRIATE                                                                                          VENTILATED WHILE THE MATERIAL IS BEING USED AND                    BUILDING. IF IT, AT A LATER DATE, IS USED OR INTENDED
   b) SLIPPERY OR UNEVEN SURFACES                                LIFTING DEVICES ARE USED, THAT LOADS ARE PROPERLY                 ALL MATERIAL PACKAGING, BUILDING AND                              FOR A PERIOD AFTER INSTALLATION. PERSONAL                          TO BE USED AS A WORKPLACE, THE PROVISIONS OF THE
                                                                 SECURED AND THAT ACCESS TO AREAS BELOW THE LOAD                   MAINTENANCE COMPONENTS SHOULD CLEARLY SHOW                        PROTECTIVE EQUIPMENT MAY ALSO BE REQUIRED. THE                     WORK HEALTH AND SAFETY ACT 2011 OR SUBSEQUENT
                                                                 IS PREVENTED OR RESTRICTED.                                                                                                         MANUFACTURER'S RECOMMENDATIONS FOR USE MUST                        REPLACEMENT ACT SHOULD BE APPLIED TO THE NEW
   FLOOR FINISHES                                                                                                                  THE TOTAL MASS OF PACKAGES AND WHERE PRACTICAL
                                                                                                                                   ALL ITEMS SHOULD BE STORED ON SITE IN A WAY WHICH                 BE CAREFULLY CONSIDERED AT ALL TIMES.                              USE.
   THE OWNER IS RESPONSIBLE FOR THE SELECTION OF                 3. TRAFFIC MANAGMENT                                              MINIMISES BENDING BEFORE LIFTING.ADVICE SHOULD                                                                                       10. OTHER HIGH RISK ACTIVITY
   SURFACE FINISHES IN THE PEDESTRIAN TRAFFICABLE                                                                                                                                                    SYNTHETIC MINERAL FIBRE
                                                                                                                                   BE PROVIDED ON SAFE LIFTING METHODS IN ALL AREAS
   AREAS OF THIS BUILDING. SURFACES SHOULD BE
                                                                 BUSY CONSTRUCTION AND DEMOLITION SITES PRESENT A                  WHERE LIFTING MAY OCCUR. CONSTRUCTION,                            FIBREGLASS, ROCKWOOL, CERAMIC AND OTHER
   SELECTED IN ACCORDANCE WITH AS HB 197:1999 AND                                                                                                                                                                                                                       ALL ELECTRICAL WORK SHOULD BE CARRIED OUT IN
                                                                 RISK OF COLLISION WHERE DELIVERIES AND OTHER                      MAINTENANCE AND DEMOLITION OF THIS BUILDING WILL                  MATERIAL USED FOR THERMAL OR SOUND INSULATION
   AS/NZ 4586:2004.                                                                                                                                                                                                                                                     ACCORDANCE WITH CODE OF PRACTICE: MANAGING
                                                                 TRAFFIC ARE MOVING WITHIN THE SITE. A TRAFFIC                     REQUIRE THE USE OF PORTABLE TOOLS AND EQUIPMENT.                  MAY CONTAIN SYNTHETIC MINERAL FIBRE WHICH MAY BE
                                                                 MANAGEMENT PLAN SUPERVISED BY TRAINED TRAFFIC                     THESE SHOULD BE FULLY MAINTAINED IN ACCORDANCE                    HARMFUL IF INHALED OR IF IT COMES IN CONTACT WITH                  ELECTRICAL RISKS AT THE WORKPLACE, AS/NZ 3012 AND
   STEPS, LOOSE OBJECTS AND UNEVEN                                                                                                 WITH MANUFACTURER'S SPECIFICATIONS AND NOT USED                   THE SKIN, EYES OR OTHER SENSITIVE PARTS OR THE BODY.               ALL LICENSING REQUIREMENTS.
                                                                 MANAGEMENT PERSONNEL SHOULD BE ADOPTED FOR
   SURFACES                                                      THE WORK SITE.                                                    WHERE FAULTY OR (IN THE CASE OF ELECTRICAL                        PERSONAL PROTECTIVE EQUIPMENT INCLUDING
   CONTRACTORS SHOULD BE REQUIRED TO MAINTAIN A                                                                                    EQUIPMENT) NOT CARRYING A CURRENT ELECTRICAL                      PROTECTION AGAINST INHALATION OF HARMFUL                           ALL WORK USING PLANT SHOULD BE CARRIED OUT IN
                                                                                                                                                                                                                                                                        ACCORDANCE WITH CODE OF PRACTICE: MANAGING
   TIDY WORK SITE DURING CONSTRUCTION,                           4. SERVICES                                                       SAFETY TAG. ALL SAFETY GUARDS OR DEVICES SHOULD                   MATERIAL SHOULD BE USED WHEN INSTALLING,
                                                                                                                                                                                                                                                                        RISKS OF PLANT AT THE WORKPLACE.
   MAINTENANCE OR DEMOLITION TO REDUCE THE RISK OF                                                                                 BE REGULARLY CHECKED AND PERSONAL PROTECTIVE                      REMOVING OR WORKING NEAR BULK INSULATION
   TRIPS AND FALLS IN THE WORKPLACE. MATERIALS FOR                                                                                 EQUIPMENT SHOULD BE USED IN ACCORDANCE WITH                       MATERIAL.
   CONSTRUCTION OR MAINTENANCE SHOULD BE STORED                  RUPTURE OF SERVICES DURING EXCAVATION OR OTHER                    MANUFACTURER'S SPECIFICATION.                                                                                                        ALL WORK SHOULD BE CARRIED OUT IN ACCORDANCE
   IN DESIGNATED AREAS AWAY FROM ACCESS WAYS AND                 ACTIVITY CREATES A VARIETY OF RISKS INCLUDING                                                                                       TIMBER FLOORS                                                      WITH CODE OF PRACTICE: MANAGING NOISE AND
   WORK AREAS.                                                   RELEASE OF HAZARDOUS MATERIAL. EXISTING SERVICES                  6. HAZARDOUS SUBSTANCES                                           THIS BUILDING MAY CONTAIN TIMBER FLOORS WHICH                      PREVENTING HEARING LOSS AT WORK.
                                                                 ARE LOCATED ON OR AROUND THIS SITE. WHERE                                                                                           HAVE AN APPLIED FINISH. AREAS WHERE FINISHES ARE
                                                                 KNOWN, THESE ARE IDENTIFIED ON THE PLANS BUT THE                                                                                                                                                       DUE TO THE HISTORY OF SERIOUS INCIDENTS IT IS
   2. FALLING OBJECTS                                            EXACT LOCATION AND EXTENT OF SERVICES MAY VARY
                                                                                                                                   POWDERED MATERIALS                                                APPLIED SHOULD BE KEPT WELL VENTILATED DURING
                                                                                                                                                                                                                                                                        RECOMMENDED THAT PARTICULAR CARE BE EXERCISED
                                                                                                                                                                                                     SANDING AND APPLICATION AND FOR A PERIOD AFTER
                                                                 FROM THAT INDICATED. SERVICES                                     MANY MATERIALS USED IN THE CONSTRUCTION OF THIS                                                                                      WHEN UNDERTAKING WORK INVOLVING STEEL
                                                                                                                                                                                                     INSTALLATION. PERSONAL PROTECTIVE EQUIPMENT MAY
   LOOSE MATERIALS OR SMALL OBJECTS                                                                                                BUILDING CAN CAUSE HARM IF INHALED IN POWDERED
                                                                                                                                                                                                     ALSO BE REQUIRED. THE MANUFACTURER'S                               CONSTRUCTION AND CONCRETE PLACEMENT. ALL THE
                                                                                                                                   FORM. PERSONS WORKING ON OR IN THE BUILDING                                                                                          ABOVE APPLIES.
   CONSTRUCTION, MAINTENANCE OR DEMOLITION WORK                                                                                                                                                      RECOMMENDATIONS FOR USE MUST BE CAREFULLY
                                                                                                                                   DURING CONSTRUCTION, OPERATIONAL MAINTENANCE
   ON OR AROUND THIS BUILDING IS LIKELY TO INVOLVE                                                                                                                                                   CONSIDERED AT ALL TIMES.
                                                                                                                                   OR DEMOLITION SHOULD ENSURE GOOD VENTILATION
   PERSONS WORKING ABOVE GROUND LEVEL OR ABOVE
                                                                                                                                   AND WEAR PERSONAL PROTECTIVE EQUIPMENT
   FLOOR LEVELS. WHERE THIS OCCURS ONE OR MORE OF
                                                                                                                                   INCLUDING PROTECTION
   THE FOLLOWING MEASURES SHOULD BE TAKEN TO
   AVOID OBJECTS FALLING FROM THE AREA WHERE THE
   WORK IS BEING CARRIED OUT ONTO




© COPYRIGHT. THIS DRAWING REMAINS THE PROPERTY OF G.J GARDNER HOMES & IS PROVIDED FOR THE USE AS DESCRIBED & MAY NOT BE USED OR REPRODUCED IN WHOLE OR IN PART WITHOUT WRITTEN PERMISSION. ANY LANDSCAPING (WHEN SHOWN) ARE FOR ILLUSTRATIVE PURPOSES ONLY AND DO NOT FORM PART OF ANY CONTRACT.
                                                                                                                                                                                                                           PAGE: SHEET SIZE: REV DRN CHK DETAILS                        DATE: I/WE HAVE CHECKED THE PLANS AND AGREE THAT
                                                        MONTVILLE 462                             ASPECT HOUSE
                                                                                                                                 CLIENT:                                         PROJECT: PROPOSED RESIDENCE                     10      A3      *   RW   RW CONCEPT FLOOR PLAN             28/06/22   THEY ACCURATELY DEPICT THE HOUSE FOR
                                                                                                                                                                                                                                                                                                       CONSTRUCTION.
                                                                                                                                 SANDRA & RICHARD MATHISON                                                                     JOB NUMBER:       B   RW   RW AMENDED CONCEPTS               03/08/22
                                                         (MODIFIED)                                  PLANS                                                                      LOT 2 ON RP196994                              GJGG430718        C   RW   RW AMENDMENTS - PRELIMS           29/09/22   JOB SPECIFICATION BY BUILDER TAKES
                                                                                                                                                                                                                                                                                                       PRECEDENCE OVER THESE PLANS.
        WOJTEK STAINWALD                                       RESORT FACADE                                                                                                    1073 POMONA - KIN KIN ROAD                     SALESPERSON:      D   RW   RW AMENDMENTS - PRELIMS           01/11/22
                                                                                                                                 DRAWING TITLE:
              QLD                                                                                     QLD                                                                       KIN KIN, QLD                                   CHRIS McNEIL      E   RW   RW AMENDMENTS - PRELIMS           21/12/22   OWNER SIGNED: ............................... DATE: ..........
                                                          © COPYRIGHT EXCLUSIVE                                                                                                                                                DATE:             F   RW   RW CONSTRUCTION DRAWINGS          04/05/23   OWNER SIGNED: ............................... DATE: ..........
          QBCC 1285235                                    TO G.J.GARDNER HOMES                     QBCC 1257937                 WH&S NOTES                                                                                     13/07/2023        G   RW   RW GARAGE BIGGER                  13/07/23   BUILDER SIGNED: .............................   DATE: ..........
Log in to download the original file

Appendix B - New Dwelling Plans.pdf · 2.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.