Skip to the record
The only place to find full transcripts.

Council archive · source document

REC14/0008 St 5 Reconfiguration 2 lots into 6 lots Report & Plans

of 26

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (15.9 MB): may take a few minutes to open.

Log in to see the plans as drawn
 

 

roy ft pf ote | | | | >
— i ff | | | | a Callaghan & Toth
| | | | 7 | Civil, Environmental &
| | _ Hydraulic Engineers

  
 
 
 
  
 
 
 
 
  
  

Sm RIPARIAN BUFFER FROM INVERT
ee | | | | PO BOX 2305

a | | \ NOOSA HEADS 4567
| | Al 8/41. Sunshine Beach Rood

LEGEND:
[II sm RIPARIAN BUFFER FROM TOP OF BANK / \ \
J x Meike (ise ao ia a ee . | |
Ni ye see at teks eh coer Par ef, | i Phone 54749081, Fox 54749041
eee es < SS a aa | wwwx. collaghanendteth.com.au

 

 

 

10m RIPARIAN BUFFER FROM TOP OF BANK
| ~~] [iesigned [ADT | datum ARD DERIVED
— ‘drawn BM
AM

LOT OR INFRASTRUCTURE INSIDE RIPARIAN BUFFER ,
(TOTAL AREA 340 SQUARE METRES) checked origin (am) FM

 

 

 

opproved

1 SURVEYED BY
MAX WATTERSION & ASSOCIATES
PHONE 54 426 121

 

eee] ADDITIONAL RIPARIAN BUFFER OFFSET (PRELIMINARY AREA
580 SQUARE METRES, SUBJECT TO FLOOD MODELING)
SET T TTT

EXISTING TOP OF BANK

   

 

   

 

 
   
       
 

 

 

  
    

 

  
    

 

    
   

   
 

 

   
 

 

 

 
   
 
 
 
 
 
  
 
 
  
 
 
 

 

  

 

 

 

   
 
 

 

— Foro FINAL Q100 WESTERN BANK — RIPARIAN BUFFER AREA y
PROPOSED LAY BACK TYPE INVERT UNE KERB & Pee ee a ae 6
SS 1 PLANT/1.5m?. CURRENTLY RIPARIAN AREA SS -
CHANNEL M1 TO IPWEAQ STD OWG R-0080 we TOP OF BANK LIMITED TO GRASS : project
==§W—— prorosen STORMWATER PIPE NATURE VEGETATION PRESENT ON BANKS PROPOSED 31 LOT SUBDIVISION
+ p= PROPOSED INTERLOT DRAINAGE PIPE WITH A> £9109 ~| | 55 LAKE MacDONALD DRIVE
RAINGARDEN oe aa 3 COOROY
+ —— PROPOSED INTERLOT DRAINAGE PIPE oy ACTIVE J s
” 5
WITH PITS “PARKLAND § —
2 eS
PROPOSED BIORETENTION BASIN 685m 7 Ky a
J aa Prong. 7 ] — RIPARIAN BUFFER AREA oy, ZA
PROPOSED VEGETATED , - ‘ "% PLANT 70% OF AREAS TO ACHIEVE PLANT wes
(qm, BIO-RETENTION SWALE / DENSITY OF 1 PLANT/1.5m®, REMOVE WEEDS AY VALKEV PTY LTD
MINOR CHANNEL po et
| LA We PROFILING Le Ye Sr
PKS { | title
s Sd || RIPARIAN ZONES STAGE 3 & 5
ry
a
—————
LOT 136 on MCH978
Parish of TEWANTIN
County of MARCH

SUNSHINE COAST COUNCIL
Locality of LAKE MacDONALD

 

  
 
 

 

 

 

 
  
 
 
 

 

 

RIPARIAN MAPPING DOWNSTREAM , ? Bee
OF THIS POINT, STREAM BANK E \ 3
'|_Use FoR START OF BUFFER s = S om <i Seay ~* Rs oa __ )
SCALE
0.5 10 15 20 2 Meters 50

scole ‘SCALE SHOWN IS ORIGINAL DRAWING SCALE

 

 

 
 

REVISIONS

BEHIND LOTS FOR \\h 2 a L
ACCESS OR SERVICES aos 4
= P NO RIPARIAN MAPPING DOWNSTREAM

OF THIS POINT, STREAM INVERT |.
USED FOR START OF BUFFER] ™.

 

 

 

  

 

  
  

 

 

 

 

WS

FILES

COMPUTER DIRECTORY
X:\JOBS\CT Projects in progress\1225 30 lots
| | lake MacDonald Drive\Design\Current DWG-BASE

 

   

 

 

ee ee
REQUIRED FOR 30%
yowee truat/isn’ | N PRELIMINARY

Sheet 1 of 15 sheets

 

ass

  

QQ

 

 
 

 

 
  
   

 

 

 
 

VE f ’

| ie \ é RESERVE
I aeract barren MER OPEN i225. 33
*

INFILL PLANTING TO SPACE F a

ACHIEVE PLANT DENSITY af I ; .
2 ’ i |

= — = dote 10-3-14 /)

>

 

 
    
 

 

 

 

 

 

 

  

 

 

 

 

Used in these records

About this file

File size
15.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

REC14_0008 St 5 Reconfiguration 2 lots into 6 lots Report & Plans.pdf · 15.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.