Original source · versioned page text
2015-11-10 Planning & Organisation Committee Agenda
The original of this document is very large (15.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 10 NOVEMBER 2015
Corner lots have to nominate a “rear” boundary and effectively have a 6 metre setback to at
least 3 sides. Corner lots already present complexities given two front boundary setbacks,
lack of private useable open space, presentation and orientation to adjoining properties, and
the irregular and often truncated shape of the lot. The nomination of a rear boundary directly
forces the creation of the building closer to a road frontage increasing issues relating lack of
privacy, safety and security and associated traffic noise.
Allowing corner lots to be managed as having side (rather than “rear” boundaries would allow
improved liability and the design outcomes for the property. It would create a greater open
space opportunity to allow vegetation and buffering to the street rather than a large blank wall
of an 8m wall forced forward because of the need for a nominated rear boundary with an
increased setback.
Increasing rear boundary setback will encourage moving the building footprint as close as
possible to the side boundaries to make up for the loss of rear building footprint. Overall this
would defeat the purpose of the proposed rear boundary setback amendment intended to
protect the amenity of neighbours.
Where all adjoining neighbours have already built as close as allowable to your common
boundaries an internal courtyard may have been your only chance of private open space and
you are unfairly disadvantaged by the new setbacks.
Increased structural complexity of supporting wall and roof above, when building section is
stepped could add $60,000 to a 2 storey home.
There is reduced ability to design for climate, orientate the building appropriately for solar
heating, incorporate shade for passive cooling, capture prevailing breezes etc. As a result
the inclusion of these amendments is contradictory to statements in the Strategic Framework
and Community Vision which say residential development is encouraged to be more
sustainable and flexible relying less on non-renewable energy for heating, cooling, lighting, or
hot water heating.
The Building Code of Australia (BCA) defines Australia into 8 climate zones. Each climate
zone has distinctly different design and construction requirements. The Noosa Shire is
contained within Zone 2 – Warm humid summer, mild winter. The proposed amendments will
limit the opportunities to design for these recognised climatic conditions as the design
envelope has been reduced.
Limited consideration has been given to the impacts these amendments may have on lots
that are small; irregular in shape, width, and dimensions; have multiple street frontages;
contain an easement; adjoin bushland representing a bushfire hazard; have minimum floor
heights specified; contain steep slopes
By setting the upper floor back further than the first there is increased cost associated with
articulation, creates situations where the first floor looks over roof below and is adversely
affected by heat and glare
Proposed amendments pander to a small minority of residents and have a detrimental impact
on the balance of residents. This is a “nanny state” reaction.
There is no one size fits all so you must consider the majority when reviewing these
amendments – we live in one of the best urban environments in the world and it was created
by people with a sincere vision of the community’s interest. These proposed amendments do
not stand the test for all.
These proposed amendments are completely unnecessary as the BCA has considered and
demonstrated that the current residential setbacks work for the majority of developments and
there is no justification for a departure from QDC.
As the majority of residential development is infill or reconstruction it will disadvantage these
residents unfairly.
Proposed changes will impact on the Council staff ability to assess in a timely manner
resulting in additional costs and delays to the construction sector.
Page 122 of 201
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.