SCHEDULE 2
Special Conditions — Road Upgrades
1. Prior to the construction of any road works in Top Forestry Road the applicant must
apply to Council for a Development Permit for Operational Works — Roadworks. The
works must be approved, completed and accepted “On Maintenance” for a minimum
maintenance period of 52 weeks for roadworks, stormwater drainage and frontage works
as set out in section 5.5 of “Planning Scheme Policy 5 — Engineering Design Standards
— Roads, Drainage and Earthworks’ in effect at the Commencement Date, prior to the
commencement of the use for Animal Husbandry - Type 2 (Intensive Poultry Farm).This
deed shall prevail to the extent of any inconsistency with the Development Permit for
Operational Works.
2. | The upgrading of Top Forestry Road must be provided by the applicant/owner generally
in accordance with the plans prepared by Lambert & Rehbein contained in SCHEDULE
3 extending from the proposed entrance to the site to the existing formation at Old
Ceylon Road, including the following amendments:
A. — Plan No. B14101-SK-004 (Rev B) dated 8/5/2015
(a) Delete the table titled “Review of Existing Road Width vs Required 6m Road
Width of Suitable Pavement Material”
(b) Include additional notes
(i) | “The unbound pavement must extend beyond the formation width into
the 1 on 4 shoulder where necessary”,
(ii) “The final design of the pavement must be undertaken in accordance
with the conditions of the operational works approval”,
(iii) “Table drains to be widened at cross drainage culverts where
necessary”,
(iv) “The road must be constructed with a minimum 6m wide sealed
surface.”, and
(v) The sealed surface must be widened where required at the bends (a
minimum of 7m wide at the major bend at approximately Ch1100 to
ch1200).”,
(c) Clearly indicate the full extent of the proposed banks and batters.
B. Plan No. B14101-SK-005 (Rev C) dated 28/4/2015
(a) Include additional notes
(i) | “The pavement designs shown on the engineering drawings are not
approved. The final design of the pavement must be undertaken in
accordance with the conditions of the operational works approval",
(ii) “The cut batter indicated on the plan is typical only and is subject to
localised geotechnical investigation at the time of final design and
submission of an Operational Works application. Should the localised
geotechnical investigation conclude that the typical section is not
achievable or Council considers that the extent of works and
vegetation removal is excessive, Council reserves the right to require
15 of 19
Page 47 of 201See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.