Original source · versioned page text
2015-11-10 Planning & Organisation Committee Agenda
The original of this document is very large (15.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Page 50 of 201
Es OLD CEYLON ROAD KR
Yo V4
\S Feu a
ce
A DRL)?
4 gs
Ey oe ow \ S,
o 7
oO =
r aa .
We
Q KB Ke
& eee = Zoe >
9g —— \
eI, <= s
oo ROAD ae =) gw
— 0 9.
ta. =.
>
= 5 eS REVIEW OF EXISTING ROAD WIDTH VS REQUIRED
sey 6m_ROAD WIDTH OF SUITABLE PAVEMENT MATERIAL
<& = SECTION | CHAINAGE | EXISTING WIDTH | WIDENING REQUIRED
[sicion i [mao rozmo [sn | tm
Fscror2 | 000 sao | sm | om ——*
EPR SECTION 4 | 815.0 10 850.0 5.8m | tam
gr. sconon 5 [ssa 0 9m0 | 8m
4 SSS Oe. — | SECTION 6 | SEE Sk-005 SEE Sk-005 SEE Sk-005
& 7 gs Yd
’
{| ~&: 4 So %
o v | |
<
yagi) ee NOTES:
? Foe TEN 1, EXISTING WIDTHS REFER TO PAVEMENT WIOTH (PAVEMENT 'S OF UNKNOWN DEPTH AND MATERIAL
ey ee ee TYPE) AS DETERMINED BY THE SUPPLIED SURVEY FROM MAX WATTERSON & ASSOCIATES,
\ | Srey : Te RECEIVED 28/11/14, REFERENCE; 06-2184AK1.¢wg,
§ ———— 2 Mp, SR 2. SECTIONS 1, 2, 3, 4, 5, & 7 WILL REQUIRE RELATIVELY MINOR EARTHWORKS, EXTENSION OF
TZ xe SECTION / “py eS: EXISTING PIPES, REINSTATEMENT OF TABLE DRAINS AND ADOITIONAL PAVEMENT WIDENING TO
ry ; % e oe Set! ACHIEVE THE FULL 6m WIDTH REQUESTED BY COUNCIL. SECTION 6 WILL REQUIRE MORE
\\ SECTION To Sk 005 FOR DETAILS ¥ x WIDTH. REFER TO SKETCH B14101-SK-005 FOR ADDITIONAL DETALS.
— REFER a , SIGNIFICANT EARTHWORKS AND ADDITIONAL PAVEMENT WIDENING TO ACHIEVE THE Gm PAVEMENT
p 3. GEOTECHNICAL SITE INVESTIGATIONS HAVE BEEN UNDERTAKEN (REFER TO RED EARTH
y ENGINEERING GEOTECHNICAL INVESTIGATION REPORT — APRIL 2015.
4 on 8 FILE:150320 LAR Rood Investigation Ricgewood Geotech 23042015_Rev!—Combined.pdf
yf Cas. Sh 4, PAVEMENT DESIGN HAS BEEN UNDERTAKEN IN ACCORDANCE WITH THE GEOTECHNICAL
INVESTIGATION REPORT, AUSTROADS PAVEMENT DESIGN GUIDELINES AND COUNCILS
RECOMMENDATIONS.
F 5. THE WORKS SHALL INCLUDE INSTALLATION OF ALL REQUIRED ROAD SIGNAGE AND ROAD EDGE
v0 GUIDE POSTS IN ACCORDANCE WITH THE CURRENT EDITION OF THE TMR MUTCD.
a 6. DRAWINGS ARE CONCEPT ADVICE ONLY, AND ARE SUBJECT TO DETALED DESIGN.
@ x6/ CONCEPT
3 te> ADVICE ONLY
° Le ey 2015
=> ct Jent | gr
“ W. DONALD MILLIGAN PTY LTD C/- GANTT LEGAL Er LAMBERT & REHBEIN ee
No 0 10 20 30 40m \ ENGINEERS + MANAGERS - SCIENTISTS, B14101-SK-004
Oo cielo PROPOSED POULTRY FARM TOP FORESTRY ROAD - WIDENING DETAILS bay er sein (eye ee > s | wsrs
= SCALE 1:1000 (A1) INFRASTRUCTURE WORK ASSESSMENT jieismacus fe eg aor ist
: - See asa ea, eae
F.\debs\814100\814101\Drowings\intrestructure\ Skeéches\B1410!1~3K—-004 REVE 15~05~08.deqSee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.