Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

2015-11-10 Planning & Organisation Committee Agenda

of 187

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Page 53 of 201

CONTROL LINE MCI
                     X = 1413.188      a                                   wont
                     Y = 1801.967       Se                               ee
                     2 = 209.023           oe             ‘mK   th,    +”
                     Dotum 208.00           CT       Td
                                            i              or
                    psowon | §          ge        og F                     |                      -
                                   g      8 8         g       8                                       Soe
                  fwmesmey §            BE        oF          fF                                           ie:
                                          ge          8                                                       aN
                                   Sg                                                                             BN
                                     CHAINAGE 1000.000                                                                                       “Sse                                              @ CONTROL LINE MCCI
                                                                                       CONTROL LINE MCCI                                              ~~                                        |               CONCEPTUAL DESIGN: SURFACE
                                                                                       Pe aon                                                                                                                   EXISTING SURFACE
                                                                                       Z = 216.195                                                                                                            [
                    CONTROL LINE MCC!       oa  <a        a     sap                    Doturn 210.00              =          -       a                       x= 86425                           |
                                                                                                                                                             CONTROL LINE MCI
                     2 se             a              :         a -                     sooo       |           UT                                               :   :                      =       -
                     a                     tL      |     TI                                                       aE                                                                 ee
                      =                                               ~~---                                       Ss] SS     sS      6s! 6                   Z = 209.448            Ve        =       pape $f
                     Dotum 202.00                                                                                 3/5                2                       jatum  .
                     DESIGN HEIGHT        sigs        3       8)  8                               fl              5 |                ff                      DESGN: HEIGHT         S| g       g       2
                                          =                       =                    EXISTING SURFACE           3| 8               g                                             S| 8       =       ©
                                          Sls         3       3   8                                                                                                                | 8        §       §
                                          NS  N                   &
                                                      8                                orFstrs                       s       8       8}  3
                                          sis 8       =                                                      CHAINAGE 1200.000                                                        8
                    a                                                                                                                                                                 _
                                          QR                                                                                                                 OFFSETS                   2
                                           t          s       s
                                          CHAINAGE 950.000                                        a                                                                              CHAINAGE 1.350.000
                                                                                                               =>,
                                                                                                                 a
                                                                                                                    as   ~4.005   ~4.00% lin oy
                                                                                                                                             al
                                  x.                                                                                                              aS
                     CONTROL LINE MCC1 SS et      400%    -4008 ry,                    CONTROL LINE MCC1                                            Mee      CONTROL LINE WCG1~__
                     X = 1468.024       <leet                  pat                     X = 1398.722                                                    <     X = 1231528     Su       gy | cares   6008  rw
                     Y'= 1885071                                     Pe                Y = 1703,708                                                          Y = 1639.446          YS                   =    -----==--
                     Z = 202.825                                        Se             Z = 213.601                                                           Z = 214.121             |        |
                     Datum 200.00                                             :        Dotun 208.00                                                          Dotum 212.00
                   psa        |     0 gt OU                                            eee               S        3 2        2       3    2                 psuor |              SRT              OY
                                                      g                                                  sS       =| =       =       =    w                                       sisls       S       =
                                                             bx]                                         NX       SLN        N       NUN                                          NINN        N       SN
                    socom         =                                                    ida               :        2 2                3    2                    mesme! ST
                                                                                                                  wo  So              NN  a                                         ae        ay
                                                      S                                                  R        als                al   5                                         AlN       &
                    OFFSETS                   8       8       8                        OFFSETS           z           8       8       8                       OFFSETS              =   8       8       8
                                                                                                                                                                                  ~
                                              '       s       4)                                         1            '      s       s                                             '   '      Ss      "
 >                                      CHAINAGE 900,000                                                       CHAINAGE 1100.000                                                 CHAINAGE 1.300.000
©
 @                                                                                                                                                                                                              CONCEPT
 3                                                                                                                                                                         NOTE: SUBJECT TO DETAILED DESIGN | ADVICE ONLY
                                                                                                                                                                                                             LB Mey 2015
 °                                                                          Project                                  Chen                                                                                            Figere No
                                                                                                                     W. DONALD MILLIGAN PTY LTD C/— GANTT LEGAL      (&     LAMBERT & REHBEIN
 8                                     ae                                   PROPOSED POULTRY FARM                    Te                                                ‘\      SHOR IERS eae t ores                  B14101-SK-007
 =                                       SCALE 1:100 (At)                   SECIS TROCIRE. Wake seco                 TOP FORESTRY ROAD - CONCEPT ANNOTATED CROSS SECTIONS] Svvivizwagus BES ADIL    &            A
                                                                                                                                                                     pre             escaila( a
                                                                                                                                                                  [Bexn          tees           pene odes) ae) ee Ret SEE LOW
             F \ebs\814100\814101\Drowiegs\intrestructure\Sketches\B1410!-3K-07 15-01-06.deg
Log in to download the original file

2015-11-10 Planning & Organisation Committee Agenda(PDF, 15MB).pdf · 15.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.