PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 10 NOVEMBER 2015
Earthworks and Retaining Walls
19. All earthworks must be undertaken in accordance with an Operational Works
approval, and contained entirely within the site, unless written permission from the
respective landowner(s) is provided to Council.
20. Bund 1 & 2 indicated on the Site Layout Plan drawn by Water Technology and dated
01/07/2015 must be removed and the existing levels reinstated within 2 weeks of this
approval date.
21. Bund 3 as indicated on Site Layout Plan drawn by Water Technology and dated
01/07/2015 must be relocated a minimum of 5m away from the root zones of the
existing vegetation adjacent the creek. The new bund and area between it and the
waterway shall be revegetated with suitable species and densities in accordance with
Planning Scheme Policy 3 – Landscaping Plants & Guidelines. The earthworks and
landscaping must be undertaken in accordance with an Operational Works approval
and be lodged within 1 month of the Material Change of Use approval date.
Damage to Services and Assets
22. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the
development.
Any repair work which proposes to alter the alignment or level of existing services
and assets must first be referred to the relevant service authority for approval.
Development Permit for Reconfiguring a Lot (Access Easement)
PLANNING
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied with
prior to the use commencing, and then compliance maintained at all times while the
use continues.
Approved Plans
2. Development undertaken in accordance with this approval must generally comply
with the approved plans of development. The approved plans are listed in the
following table unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
D-01569-06-B Site Plan drawn by Martoo Consulting 23/06/2015
Easements
3. An easement for access purposes must be registered against the title of Lot 2
SP108094 in favour of Lot 1 SP108094. The easement must be a minimum of 10m
wide and widened where necessary to wholly include passing bays and any
associated banks or batters.
4. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
Page 60 of 201
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.