PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 10 NOVEMBER 2015 Water detention and treatment device A dam has been constructed within the Riparian Buffer Area adjacent the northern corner of the greenhouse, without the necessary Operational Works approvals. The application proposes to reconstruct this dam as a water filtration device in the same location to detain the roof water from the greenhouse. Council’s Environment Officer recommends the infrastructure to be located outside of the mapped Riparian Buffer Area and a condition is recommended accordingly. Buffer Areas The Agricultural Uses Code seeks vegetated buffers between cultivated areas and watercourses, to reduce impacts on environmentally sensitive areas. The greenhouse is located outside the Riparian Buffer Area and the crop is within a controlled greenhouse, which helps limit the release of nutrients to the external environment. Apart from times of major flooding, the greenhouse is unlikely to have adverse impacts on the surrounding waterway and existing vegetation buffers surrounding the waterway will assist in slowing and filtering water before entering the adjoining drainage lines. Traffic, Access & Parking The applicant submitted a Traffic Impact Report concluding the road network has capacity to cater for the expected traffic movements associated with the uses. However, the existing access from 305 Lake Macdonald Drive has not been constructed in accordance with Council’s standards and is not suitable for its increased use. As a result, the applicant has negotiated access for heavy vehicles through the adjoining Wimmers site (271 Lake Macdonald Drive). As this access will be in constant use and is subject to occasional flooding, conditions are recommended for it to be designed and constructed with an “all weather surface”. A condition is also recommended for the existing access to Lake Macdonald Drive be used for the existing dwelling and emergency access. 4. CONSULTATION 4.1. IDAS Referral Agencies Nil 4.2. Other Referrals The application was forwarded to the following internal Council specialists: Coordinator Development Engineering Environment Officer (Landscaping & Ecology) Environment Officer (Water Quality) External Consultant (Hydrology & Water Management Consulting Pty Ltd) 4.3. Public Notification The application is required to follow a code assessable application process and public notification is not required. 5. CONCLUSION The application is the result of compliance action associated with the construction of a 2ha greenhouse on an existing turf farm at 305 Lake Macdonald Drive. The changes to the scale and intensity of the greenhouse require a development application, with the use being a consistent use within the Rural zone and subject to code assessment. Through the course of the application process the applicant has addressed impacts associated with increased traffic movements by negotiating an access easement through the adjoining Wimmers site. The applicant has also connected power to the site and includes a stormwater management plan to detain the water from the substantial roof area. Page 69 of 201
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.