Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2015-11-10 Planning & Organisation Committee Agenda

of 187

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                         10 NOVEMBER 2015


      Water & Sewer Connections
9.    An underground connection to reticulated water and sewerage must be provided to the
      development site in accordance with the standards and requirements of Northern SEQ
      Distributor–Retailer Authority (Unitywater).
10.   A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
      (Unitywater) must be submitted to Council that certifies an underground connection to
      reticulated water and sewerage has been provided to the development site.



REPORT
1.    PROPOSAL
The application seeks approval for a Material Change of Use for a Wellbeing Use - Type 2 Social
to establish a new Cooroy-Noosa Genealogical & Historical Group Inc. building on a small parcel
of land adjacent to existing community facilities at Emerald Street, Cooroy.

The applicant advises the Group formed in 1996 with the aim of “collecting, promoting and
encouraging the study of genealogy, heritage and local history”. The Group has operated from
shared leased premises and the growth of their membership and facilities requires them to
establish their own premises. The proposed new building is a single-storey rendered and
weatherboard building with a gross floor area of 184m2. Figure 1 below shows architect’s
perspectives of the front of the building and Figure 2 shows the floor plan.




                            Figure 1 – Architectural Perscpectives

                                                                               Page 85 of 201
Log in to download the original file

2015-11-10 Planning & Organisation Committee Agenda(PDF, 15MB).pdf · 15.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.