Re: MCU25/0053 & OPW25/0074 ~ 7 Noosa Parade Noosa Heads
We have reviewed Noosa Council’s request for information dated 9th June 2025 and provide our response to the
Engineering related items.
Issue: 1 - Stormwater
The Stormwater Management Plan for the basement level includes a pump system. Council
has concerns how stormwater will be managed in the event of a pump malfunction.
In accordance with QUDM 7.2.3 address how a major (1% AEP) event will be managed
in the event of a pump malfunction.
Response:
As detailed in the submitted Stormwater Management Plan (SCG Drawing. No. 0423-SW1.1 & SW1.2), the
basement drainage system has been designed in accordance with QUDM Section 7.2.3 to include appropriate
redundancy measures.
A secondary pump and a backup power supply will be provided to manage stormwater in the event of a primary
pump failure or power outage. This approach aligns with accepted engineering practice and is consistent with
prior development approvals in similar basement configurations.
These provisions ensure continued functionality of the stormwater system during a major (1% AEP) storm
event, thereby mitigating flood risk associated with pump malfunction.
If you require any further information, please do not hesitate to contact our office.
Yours faithfully
TOM HARRINGTON – RPEQ 27698
For and on behalf of
SCG CONSULTING ENGINEERS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment B - Stormwater Management Memorandum.pdfRelated documentApplication case desk ↗
About this file
- File size
- 354 KB (small file)
- File type
No other editions are linked here.