Council archive · source document

RFI - Attachment B - Stormwater Management Memorandum · MCU25/0053

of 1

Text shows just the words. Original shows the document exactly as it was published.

                                                                                         SCG Consulting Engineers
                                                                                         ABN 68 669 675 790


                                                                                         Unit 1/11 Project Avenue,
                                                                                         Noosaville QLD 4566
23 September 2025
SCG Ref: 0423(L1)                                                                        P: 07 5455 5604
                                                                                         E: [email protected]
By email: [email protected]


Seymour Leisure Pty Ltd



Dear Belinda

                      Re: MCU25/0053 & OPW25/0074 ~ 7 Noosa Parade Noosa Heads

We have reviewed Noosa Council’s request for information dated 9th June 2025 and provide our response to the
Engineering related items.

Issue: 1 - Stormwater
      The Stormwater Management Plan for the basement level includes a pump system. Council
      has concerns how stormwater will be managed in the event of a pump malfunction.

      In accordance with QUDM 7.2.3 address how a major (1% AEP) event will be managed
      in the event of a pump malfunction.

Response:

As detailed in the submitted Stormwater Management Plan (SCG Drawing. No. 0423-SW1.1 & SW1.2), the
basement drainage system has been designed in accordance with QUDM Section 7.2.3 to include appropriate
redundancy measures.

A secondary pump and a backup power supply will be provided to manage stormwater in the event of a primary
pump failure or power outage. This approach aligns with accepted engineering practice and is consistent with
prior development approvals in similar basement configurations.

These provisions ensure continued functionality of the stormwater system during a major (1% AEP) storm
event, thereby mitigating flood risk associated with pump malfunction.

If you require any further information, please do not hesitate to contact our office.


Yours faithfully




TOM HARRINGTON – RPEQ 27698
For and on behalf of
SCG CONSULTING ENGINEERS

Used in these records

About this file

File size
354 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

RFI - Attachment B - Stormwater Management Memorandum.pdf · 354 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.