Operational Works Application_62 Lake Macdonald Dr

Attached to the e-mail Operational Works Application OPW26/0069 - DA Form 1, Non for Profit documentation Civil and Landscape Plans -62 Lake MacDonald Drive, Cooroy.

of 83

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 20, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                            GENERAL:
                                                                                                                                                                            1.   TO BE READ IN CONJUNCTION WITH 'SEDIMENT CONTROL DEVICES', REFER STD DRG IPWEA DS-040 &
                                                                                                                                                                                 DS-041.
                                                                                                                                                                            2.   TEMPORARY DRAINAGE CONTROL FLOW SHOULD BE DIVERTED AROUND THE WORK SITE WHERE                                                                                                                                                                                                                            FORMED TOP WIDTH
                                                                                                                                                                                 POSSIBLE.                                                                                                                                                                                                                                                                                          GEOTEXTILE LINED OR EQUIVALENT
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              FORMED TOP WIDTH GEOTEXTILE
                                                                                                                                                                            3.   ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS TO BE INSTALLED AND BE OPERATIONAL BEFORE




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           0.15 (MIN)
                                                                                                                                                                                                                                                                                                                                                                                                                                                             RUNOFF                                                                                                                                                                                                               LINED OR EQUIVALENT
                                                                                                                                                                                 COMMENCING UP-SLOPE EARTHWORKS.                                                                                                                                                                                                                                                                                                                                                                                         RUNOFF




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            0.15 (MIN)
                                                                                                                                                                            4.   CONTROL MEASURES TO BE INSPECTED AT LEAST WEEKLY AND AFTER SIGNIFICANT RUNOFF
                                                                                                                                                                                 PRODUCING STORMS.
                                                                                                                                                                            5.   IN AREAS WHERE RUNOFF TURBIDITY IS TO BE CONTROLLED, EXPOSED SURFACES TO BE EITHER                                                                                                                                                                                                                                                                                  2 (min)
                                                                                                                                                                                 MULCHED, COVERED WITH EROSION CONTROL BLANKETS OR TURFED IF EARTHWORKS ARE
                                                                                                                                                                                 EXPECTED TO BE DELAYED FOR MORE THAN I4 DAYS.                                                                                               FILTER SOCKS OVERLAP                                                                                                                                                                                                               1
                                                                                                                                                                            6.   CONTROL MEASURES MAY BE REMOVED WHEN ON-SITE EROSION IS CONTROLLED AND 70%                                                                  ONTO KERB                          4.0m MIN
                                                                                                                                                                                 PERMANENT SOIL COVERAGE IS OBTAINED OVER ALL UPSTREAM DISTURBED LAND.
                                                                                                                                                                            7.   STRAW BALE SEDIMENT TRAPS ARE TO BE SECONDARY OPTION WHICH GENERALLY SHOULD NOT BE
                                                                                                                                                                                                                                                                                                                               SEDIMENT POND
                                                                                                                                                                                 USED IF OTHER OPTIONS ARE AVAILABLE.
                                                                                                                                                                            3.   ALL CAPTURED RUNOFF MUST BE TREATED TO <75NTU PRIOR TO DISCHARGE.
                                                                                                                                                                                                                                                                                                                                         RUN-OFF                                                                                                                              NON-DISPERSIVE SUBSOIL
                                                                                                                                                                            4.   SITE TO BE PROGRESSIVELY STABILISED, AIMING FOR 60% STABILISATION WITHIN 20 DAYS FROM
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       NON-DISPERSIVE SUBSOIL
                                                                                                                                                                                 START OF WORKS AND 70% OR GREATER WITHIN 2 MONTHS.
                                                                                                                                                                            5.   ALL INLET PITS TO BE PROTECTED IMMEDIATELY.                                                                                                                                                                       1m MAX ON                                                                                                                                                                                                                 (c) PARABOLIC CATCH DRAIN WITHOUT BANK
                                                                                                                                                                                                                                                                                                                                                          BYPASS FLOW                             PUBLIC ROADS                                                        (a) PARABOLIC CATCH DRAIN WITH DOWN-SLOPE BANK
                                                                                                                                                                            6.   EROSION AND SEDIMENT CONTROL MEASURES TO BE PROGRESSIVELY REMOVED AS SITE
                                                                                                                                                                                 STABILISATION IS ACHIEVED.
                                                                                                                                                                                                                                                                                                                                            (a) ON-GRADE KERB INLET SEDIMENT TRAP                                                                                               FORMED TOP WIDTH GEOTEXTILE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         CONSTRUCTED DIMENSIONS OF PARABOLIC CATCH DRAINS
                                                                                                                                                                            SEDIMENT CONTROL:                                                                                                                                                                                                        FILTER SOCKS MAY NEED TO                                                       LINED OR EQUIVALENT
                                                                                                                                                                            1.   ALL SEDIMENT & EROSION CONTROL MEASURES TO BE IN ACCORDANCE WITH INTERNATIONAL                                                                                                                                      FULLY SURROUND THE INLET TO                                                                                                                                                                              DRAIN TYPE FORMED TOP WIDTH WITH OR WITHOUT




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             0.15 (MIN)
                                                                                                                                                                                 EROSION CONTROL ASSOCIATION (IECA) AUSTRALIA GUIDELINES AND THE SPECIFICATIONS. THE                                                                                                                                 INTERCEPT SEDIMENT RUNOFF                               RUNOFF                                                                                                                                             BANK FORMED DEPTH WITH OR WITHOUT BANK
                                                                                                                                                                                                                                                                                                                                PVC PIPE SPACERS
                                                                                                                                                                                 BASIC PRINCIPLES ARE TO:                                                                                                                                                                                            FROM THE ROAD AND VERGE                                                                                                                                                                                 TYPE - A               1.6m                                   0.3m
                                                                                                                                                                                  ·   MINIMISE THE AREA OF DISTURBANCE;
                                                                                                                                                                                  ·   CONTROL DRAINAGE PATHS UPSTREAM OF SITE AND AT OUTLETS FROM SITE;                                                                                                                                                                                                                                                                                               2 (MIN)                                                TYPE - B               2.4m                                   0.45m

                                                                                                                                                                                  ·   MINIMISE EROSION;                                                                                                                                                                                                                                                                                                                                                      1                                               TYPE - C               3.6m                                   0.65m
                                                                                                                                                                                  ·   MINIMISE SEDIMENTATION;
                                                                                                                                                                                  ·   PROGRESSIVELY REVEGETATE AND REHABILITATE THE SITE                                                                                                  FILTER SOCK
                                                                                                                                                                            2.   SEDIMENT & EROSION CONTROL DETAILS SHOWN ARE MINIMUM REQUIREMENTS. IT IS THE                                                                                                                                                                                                                                                                                                                                                 CONSTRUCTED DIMENSIONS OF TRIANGULAR V-DRAINS
                                                                                                                                                                                                                                                                                                                                                                                                             SIDE INLET REMAINS OPEN
                                                                                                                                                                                 CONTRACTOR'S RESPONSIBILITY TO INSTALL ADDITIONAL CONTROL MEASURES AS DEEMED                                                           GULLY GRATE WRAPPED IN NON-WOVEN FILTER                                                                                                                                                                                                                                                DRAIN TYPE FORMED TOP WIDTH WITH OR WITHOUT
                                                                                                                                                                                 NECESSARY THROUGHOUT CONSTRUCTION.                                                                                                     FABRIC (MINIMUM, BIDIM A34 OR EQUIVALENT)                                                                                                                                                                                                                                                BANK FORMED DEPTH WITH OR WITHOUT BANK
                                                                                                                                                                            3.   THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN ALL SEDIMENT CONTROL DEVICES IN A FUNCTIONAL
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       NON-DISPERSIVE SUBSOIL
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             TYPE - AV              2.0m                                   0.3m
                                                                                                                                                                                 ORDER AND REPLACE ALL BLOCKED SEDIMENT DEVICES AS REQUIRED UNTIL SUCCESSFUL OFF                                                                                     (b) SAG INLET SEDIMENT TRAP
                                                                                                                                                                                 MAINTENANCE OF WORKS.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             TYPE - BV              2.7m                                   0.45m
                                                                                                                                                                            4.   CONSTRUCTION OF ALL SEDIMENT MANAGEMENT DEVICES TO THE SATISFACTION OF THE
                                                                                                                                                                                 SUPERINTENDENT. SHALL BE COMPLETED AND EFFECTIVE PRIOR TO:
                                                                                                                                                                                                                                                                                                                                               KERB INLET PROTECTION                                                                                                           (b) TRIANGULAR V-DRAIN WITH DOWN-SLOPE BANK
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             TYPE - CV              3.9m                                   0.65m
                                                                                                                                                                                  a. STRIPPING OF TOPSOIL AND GRASS.
                                                                                                                                                                                                                                                                                                                                                                  SCALE N.T.S.                                                                                                                                                                      LINED CATCH DRAIN
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 SCALE N.T.S.
                                                                                                                                                                                  b. BULK EARTHWORKS TO THE SITE.
                                                                                                                                                                                  c. SERVICES INSTALLATION.
                                                                                                                                                                                  d. PAVEMENT CONSTRUCTION.
                                                                                                                                                                            6.   ALL SEDIMENT MANAGEMENT MEASURES ARE TO REMAIN IN PLACE UNTIL INSTRUCTION IS RECEIVED
                                                                                                                                                                                 IN WRITING FROM THE SUPERINTENDENT TO REMOVE ALL OR PART OF THE SILT CONTROL                                                                          SEDIMENT COLLECTION PIT EXCAVATED AROUND INLET
                                                                                                                                                                                 APPLICATIONS.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         2m (MIN)
                                                                                                                                                                            7.   BOTH TEMPORARY AND PERMANENT SEDIMENT MANAGEMENT/EROSION CONTROL DEVICES SHALL BE                                                                                                                                                                                                                                                                                                                     FLOW CONTROL BERM INCORPORATED INTO THE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    MINIM                                              ROCK PAD IF THE PAD RECEIVES RUNOFF FROM
                                                                                                                                                                                 MAINTAINED AT A SUITABLE LEVEL/CONDITION THROUGHOUT CONSTRUCTION TO THE SATISFACTION                                                                                                                                                                                                                                                                           UM LE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      NGTH
                                                                                                                                                                                 OF THE SUPERINTENDENT. SEDIMENT FENCES ARE TO BE CLEANED OUT WHEN CAPACITY IS REDUCED                                                                                                                                                                                                                                                                                       10m (M                    THE BUILDING SITE (LOCATION MAY VARY)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          IN)
                                                                                                                                                                                 BY 30%.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                             40-75mm CRUSHED ROCK                                                   300mm (MIN)
                                                                                                                                                                            8.   THE BULK EARTHWORKS AND SEDIMENT CONTROL LAYOUT PLAN SHALL BE READ IN CONJUNCTION                                                                                                                                                                                                                                                                                                                                                                   BUILDING                                           LAND




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                10m (MIN)
                                                                                                                                                                                 WITH THE APPROVED DRAWINGS.                                                                                                                                                                                                                                                                                                                                                                                                                           SITE                                             SLOPE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            150-200mm                                     N
                                                                                                                                                                            9.   PRIOR TO COMMENCEMENT OF CONSTRUCTION APPROVAL IS TO BE OBTAINED FROM THE                                                                                                                                                                                                                                                                                                              MI                                               KERB
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    m
                                                                                                                                                                                 SUPERINTENDENT FOR THE LOCATION OF THE SITE ACCESS POINT AND WASH DOWN AREA WHICH                                                                                                                                                                                                                                                                                               2.0
                                                                                                                                                                                 ARE TO BE MAINTAINED THROUGHOUT THE CONSTRUCTION PERIOD.                                                                                                                                                                                                                                                                                                                                            Y
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       UP-SLOPE RUNOFF                                                                             BD FOOTPATH
                                                                                                                                                                            10. IF EROSION AND SEDIMENT CONTROL DEVICES HAVE BEEN FOUND TO BE DIFFERENT OR FAILED IN                                                                                                                                                                                                                    DIRECTED TO AN                                                                        RP
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       MAKE SAFE FOR
                                                                                                                                                                                SERVICE, CORRECTIVE ACTION IS TO BE UNDERTAKEN IMMEDIATELY WHICH MAY INCLUDE                                                                                                                                                                                                                             APPROPRIATE                                                                                                   ROADWAY                       FOOTPATH
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          MAK                                                                                                                                                          PEDESTRIAN TRAFFIC
                                                                                                                                                                                AMENDMENTS' ADDITIONS TO THE ORIGINAL APPROVED EROSION CONTROL PLANS. SUCH                                                                                                                                                                                                                              SEDIMENT TRAP                  PEDE E SAFE TO
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           STRIA
                                                                                                                                                                                AMENDMENTS ARE TO BE APPROVED BY SUPERINTENDENT, IF DEEMED NECESSARY AND RELEVANT.                                                                                                                                                                                                                                                               N TRA
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    GEOTEXTILE FILTER CLOTH (MANDATORY                 FFIC
                                                                                                                                                                            11. SEDIMENT TRAP TO BE FLOCCULATED AND DE-SILTED AS NECESSARY.                                                                                                                                                                                                                                         WHEN WORKING ON CLAYEY SOILS)                                                                                                                                                        ROADWAY
                                                                                                                                                                            12. WATER QUALITY TESTING / MONITORING TO BE UNDERTAKEN BY CONTRACTOR.
                                                                                                                                                                                                                                                                                                                                       (a) FABRIC WRAP DROP INLET PROTECTION WITH TRENCH
                                                                                                                                                                            SEDIMENT FENCE:                                                                                                                                                                                                                                                                                                                                 (a) ROCK ENTRY/EXIT PAD FOR BUILDING SITES
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           (b) ROCK PAD SLOPING AWAY FROM ROAD
                                                                                                                                                                                                                                                                                                                                                                                                                                                                        CONSTRUCTION NOTES:
                                                                                                                                                                            1.   NOT TO BE LOCATED IN AREAS OF CONCENTRATED FLOW.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                        MATERIALS
                                                                                                                                                                            2.   NORMALLY LOCATED ALONG THE CONTOUR WITH A MAXIMUM CATCHMENT AREA 0.6Ha PER 100m                                                                                                                                                                                                                                                                                                                                                                                                         2m (MIN)
                                                                                                                                                                                                                                                                                                                                                                                                                GRATE WRAPPED IN NON-WOVEN FILTER                       1.    ROCK: WELL GRADED, HARD, ANGULAR, EROSION RESISTANT ROCK, NOMINAL DIAMETER OF 40 TO 75mm.
                                                                                                                                                                                 LENGTH OF FENCE
                                                                                                                                                                                                                                                                                                                                                                                                                CLOTH (WOVEN SEDIMENT FENCE ONLY                        2.    FOOTPATH STABILISING AGGREGATE: 25 TO 50mm GRAVEL OR AGGREGATE (IF REQUIRED).
                                                                                                                                                                            3.   WOVEN FABRICS ARE PREFERRED, NON-WOVEN FABRICS MAY BE USED ON SMALL WORK SITES, I.E.                                                                          SEDIMENT COLLECTION PIT
                                                                                                                                                                                                                                                                                                                                                                                                                USED IN HEAVY TRAFFIC AREAS)                                                                                                                                                                                         BUILDING
                                                                                                                                                                                 OPERATIONAL PERIOD LESS THAN 6 MONTHS OR ON SITES WHERE SIGNIFICANT SEDIMENT RUNOFF IS                                                                        EXCAVATED AROUND INLET                                                                                                   3.    GEOTEXTILE FABRIC: HEAVY-DUTY, NEEDLE-PUNCHED, NON-WOVEN FILTER CLOTH (‘BIDIM’ A24 OR EQUIVALENT).
                                                                                                                                                                                 NOT EXPECTED                                                                                                                                                                                                                                                                                                                                                                                                                                          SITE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                        INSTALLATION
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        LAND
                                                                                                                                                                            4.   WHERE FENCES NEED TO BE LOCATED ACROSS THE CONTOUR THE LAYOUT SHALL CONFORM TO                                                                                                                                                                                                         4.    INSPECT ALL SITE ENTRY AND EXIT POINTS PRIOR TO FORECAST RAIN, DAILY DURING EXTENDED PERIODS OF RAINFALL, AFTER                                                                                           SLOPE




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                10m (MIN)
                                                                                                                                                                                 'TYPICAL LAYOUT' ACROSS GRADE.                                                                                                                                                                                                                                                               RUNOFF-PRODUCING RAINFALL, OR OTHERWISE AT FORTNIGHTLY INTERVALS.
                                                                                                                                                                            5.   FENCES ARE REQUIRED 2m MIN. FROM TOE OF CUT OR FILL BATTERS, WHERE NOT PRACTICAL ONE                                                                                                                                                                                                   5.    IF SAND, SOIL, SEDIMENT OR MUD IS TRACKED OR WASHED ONTO THE ADJACENT SEALED ROADWAY, THEN SUCH MUST BE PHYSICALLY
                                                                                                                                                                                 FENCE CAN BE AT THE TOE WITH A SECOND FENCE 1m MIN AWAY. FENCE SHOULD NOT BE LOCATED                                                                                                                                                                                                                                                                                                                                                                                                               SEDIMENT FENCE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                              REMOVED, FIRST USING A SQUARE-EDGED SHOVEL, AND THEN A STIFF-BRISTLED BROOM, AND THEN BY A MECHANICAL VACUUM UNIT, IF
                                                                                                                                                                                 PARALLEL WITH TOE IF CONCENTRATION OF FLOW WILL OCCUR BEHIND THE FENCE
                                                                                                                                                                                                                                                                                                                                                                       STORMWATER INLET                                                                                       AVAILABLE.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       MAKE SAFE FOR
                                                                                                                                                                            TEMPORARY CONSTRUCTION ENTRY / EXIT:                                                                                                                                                       GRATE                                                                                            6.    IF NECESSARY FOR SAFETY REASONS, THE ROADWAY SHALL ONLY BE WASHED CLEAN AFTER ALL REASONABLE EFFORTS HAVE BEEN                                        FOOTPATH
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       PEDESTRIAN TRAFFIC
                                                                                                                                                                            1.   ADJACENT STORMWATER RUNOFF TO BE DIVERTED AWAY FROM ENTRY/EXIT.                                                                                                                                                                                                                              TAKEN TO SHOVEL AND SWEEP THE MATERIAL FROM THE ROADWAY.

                                                                                                                                                                            2.   WHEEL-WASH OR SPRAY UNIT MAY BE REQUIRED DURING WET WEATHER.                                                                                                                                                                                                                           7.    WHEN THE VOIDS BETWEEN THE ROCK BECOMES FILLED WITH MATERIAL AND THE EFFECTIVENESS OF THE ROCK PAD IS REDUCED TO A
                                                                                                                                                                                                                                                                                                                                                                                                                                                                              POINT WHERE SEDIMENT IS BEING TRACKED OFF THE SITE, A NEW 100mm LAYER OF ROCK MUST BE ADDED AND/OR THE ROCK PAD MUST                                                                       ROADWAY
                                                                                                                                                                            STANDARD SPECIFICATIONS:
                                                                                                                                                                                                                                                                                                                                                                                                                                                                              BE EXTENDED.
                                                                                                                                                                            DRAWING TO BE READ IN CONJUNCTION WITH INTERNATIONAL EROSION CONTROL ASSOCIATION (IECA)                                                                                                                                                                                                     8.    ENSURE ANY ASSOCIATED DRAINAGE CONTROL MEASURES (e.g. FLOW CONTROL BERM) ARE MAINTAINED IN ACCORDANCE WITH THEIR
                                                                                                                                                                            AUSTRALASIA BEST PRACTICES STANDARD DRAWINGS & SPECIFICATIONS. IECA STANDARD DRAWINGS                                                                         (b) TYPICAL DETAILS OF EXCAVATED SEDIMENT COLLECTION TRENCH
                                         Filename: C:\PROJECTS\240444 - SOCIAL HOUSING - 62 LAKE MACDONALD DRIVE, COOROY\3.0 CAD\DRAWINGS\OPW\240444-OPW-C-231.DWG




                                                                                                                                                                            GENERALLY AS LISTED BELOW BUT NOT LIMITED TO:
                                                                                                                                                                                                                                                                                                                                                                                                                                                                              DESIRED OPERATIONAL CONDITION.                                                                                                                          (c) ROCK PAD SLOPING TOWARD THE ROAD
                                                                                                                                                                                                                                                                                                                                                                                                                                                                        9.    DISPOSE OF SEDIMENT AND DEBRIS IN A MANNER THAT WILL NOT CREATE AN EROSION OR POLLUTION HAZARD.
                                                                                                                                                                                  EXIT-01 - CONSTRUCTION EXIT - ROCK PAD
                                                                                                                                                                                  EXIT-02 - CONSTRUCTION EXIT - ROCK PAD
                                                                                                                                                                                                                                                                                               OPTIONAL GEOTEXTILE SPLASH PAD PLACED
                                                                                                                                                                                                                                                                                               BELOW DAM TO REDUCE EROSION AT THE BASE
                                                                                                                                                                                                                                                                                                                                                    FIELD INLET PROTECTION
                                                                                                                                                                                  EXIT-03 - ROCK PADS FOR BUILDING SITES
                                                                                                                                                                                                                                                                                          1    OF THE CHECK DAM (GENERALLY NOT REQUIRED)                                         SCALE N.T.S.                                                                                                                                                   ROCK PADS FOR BUILDING SITES
                                                                                                                                                                                  CD-01 - CATCH DRAINS                                                                                                                                                                                                                                                                                                                                                                               SCALE N.T.S.
                                                                                                                                                                                  CD-02 - CATCH DRAINS - EARTH LINED
                                                                                                                                                                                  RCD-01 - CHECK DAMS                                                                                                                                                                                                                                                                                                      STABILISE STOCKPILE SURFACE
                                                                                                                                                                                  FF-01 - FILTER FENCE                                                                                    1
                                                                                                                                                                                  SF-01 - SEDIMENT FENCE
                                                                                                                                                                                  SF-02 - SEDIMENT FENCE
Last Plotted: 2026-04-24 9:22 AM




                                                                                                                                                                                  ESC-02 - GRATED STORMWATER (FIELD) INLET SEDIMENT TRAP                                        150mm (MIN)
                                                                                                                                                                                                                                                                                                                                                                                              EARTH BANK FOR UPSTREAM




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          1.5 MAX
                                                                                                                                                                                  ESC-03 - KERB INLET SEDIMENT TRAPS                                                 A                    A
                                                                                                                                                                                                                                                                                                      OUTER WING POINTS A TO BE AT                                                            APPROACH FLOWS                                                                                                                                                                                                                                                                        SEDIMENT
                                                                                                                                                                                                                                                                              B




                                                                                                                                                                                  R-01 - RENEGOTIATION - GENERAL                                                                                      LEAST 150mm ABOVE CREST B                                                                                                                                                                                         1                                                                                                                                                           FENCE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   1
                                                                                                                                                                                                                                                                                                                                                                       FLOW DIRECTION                                                                                                                  2
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              GROUND LEVEL               2
                                                                                                                                                                                                                                                                             SECTION 1-1
Last saved by: KEVINTORRES(2026-03-11)




                                                                                                                                                                                                                                                                         FIGURE 1 - LAYOUT PROFILE OF CHECK DAMS
                                                                                                                                                                                                                                                                                  (ROCK CHECK DAMS SHOWN)



                                                                                                                                                                                                                                                                          ROCK CHECK DAMS                                                                                                                                                                                                                                   TYPICAL STOCKPILE DETAIL
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        SCALE N.T.S.
                                                                                                                                                                                                                                                                                     SCALE N.T.S.



                                                                                                                                                                                                                                      North Point   Scale                                     Horiz. Datum     Client                                     Consultant                                                                                     Project                                                                                                       Drawing
                                                                                                                                                                                                                                                                                                LOCAL                                                                                                                                                                                                                              Drawn                JH                                                                                                  Project No.                   Drawing No.           Rev No.
                                                                                                                                                                                                                                                                                                                             COAST2BAY                                                                                                                                   SOCIAL HOUSING                                                                                            EROSION & SEDIMENT CONTROL
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   Design               JH
                                                                                                                                                                                                                                                                                                                           HOUSING GROUP                                                                                                                           OPERATIONAL WORKS - CIVIL                                                                                        NOTES & STANDARD DETAILS
                                                                                                                                                                      C MINOR UPDATE TO SET                         24.04.26 LS
                                                                                                                                                                                                                                                                                              Vert. Datum
                                                                                                                                                                                                                                                                                                 AHD
                                                                                                                                                                                                                                                                                                                                                                                                                                                                    62 LAKE MCDONALD DRIVE,                                        Check                LS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             240444                     OPW-C-231                C
                                                                                                                                                                      B FOR TENDER                                  16.04.26 LS                                                                RL Datum                                                                                                     CIVIL | STRUCTURAL | GEOTECHNICAL                           COOROY, QLD, 4563                                          Approved                                   Approved Date         Signed                                                                                              Sheet
                                                                                                                                                                      A FOR APPROVAL
                                                                                                                                                                     Rev           Revision Description
                                                                                                                                                                                                                    09.04.26 LS
                                                                                                                                                                                                                      Date Approved
                                                                                                                                                                                                                                                                                                                                                          COPYRIGHT © All rights reserved.
                                                                                                                                                                                                                                                                                                                                                          This work is copyright and cannot be reproduced
                                                                                                                                                                                                                                                                                                                                                          or copied in any form without the prior consent
                                                                                                                                                                                                                                                                                                                                                                                                            SUNSHINE COAST | BRISBANE | GOLD COAST
                                                                                                                                                                                                                                                                                                                                                                                                            www.arcosgroup.com.au | ABN 51 640 311 842
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   LACHLAN SWANN
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   RPEQ    21223
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              16.04.26                                                             Status                FOR TENDER
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        Size     A1

Log in to download the original (Operational Works Application_62 Lake Macdonald Dr.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.