Council archive · source document
stage 7 · 51901.3990.02
Attached to the e-mail Change to DA - 51901.3990.02.
NOTES: 11 pacific avenue, sunshine beach 4567 DOMESTIC SMOKE ALARMS: lot 2 on SP185673 1. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH THE AUSTRALIAN 1. ALL BEDROOMS AND HALLWAYS ARE TO BE INSTALLED WITH DOMESTIC BUILDING CODE. PHOTO ELECTRIC SMOKE ALARMS IN ACCORDANCE WITH BUILDING FIRE 2. ALL TIMBER FRAMING TO BE IN ACCORDANCE WITH AS 1684.2 2010 SAFETY LEGISLATION AMENDMENT REGULATION 2016 RESIDENTIAL TIMBER FRAMING MANUAL. 2. SMOKE ALARMS MUST BE POSITIONED IN ACCORDANCE WITH AS 3. PINE FRAMING TO BE MINIUMUM STRESS GRADE MGP 10/MGP12 1670.6 - 1997 FIRE DETECTION, WARNING, CONTROL AND INTERCOM 4.HARDWOOD FRAMING TO BE MINIMUM STRESS GRADE F14 & MINIMUM SYSTEMS. JOINT GROUP J2. 3. DEVICES MUST BE EITHER INTERCONNECTED OR HARD WIRED 5. TIMBER FOR TRUSSES TO BE MINIMUM JOINT GROUP JD4. (EXISTING DWELLINGS ONLY) THAT CANNOT BE 6. TRUSSES TO BE FIXED IN ACCORDANCE WITH MANUF. REMOVED FROM DEVICE SPECIFICATIONS ALL OTHER FIXINGS TO BE IN ACCORDANCE WITH AS 1684.2 2010 7.LAMINATED BEAM SIZES BASED ON HYNEBEAM SPAN TABLES WHERE NOTE: SMOKE ALARMS TO BE INSTALLED IN ALL HALLWAYS AND BEDROOMS OTHER BRANDS ARE USED, SIZES TO BE CONFIRMED WITH TO EXISTING RESIDENCE MANUFACTURERS SPECIFICATIONS. 8. ALL DIMENSIONS TAKE PRECEDENCE OVER SCALES 9. BUILDER AND TRADES ARE TO CONFIRM ALL MEASUREMENTS, DETAILS AND SPECIFICATIONS PRIOR TO SETOUT AND ORDERING OF MATERIALS 10. ANY ERRORS ARE TO BE ADDRESSED TO THE DESIGNER AS NO RESPONSIBILITY WILL BE TAKEN AFTER CONSTRUCTION HAS COMMENCED 11. ALL TRADES ARE TO CONFORM WITH THE CURRENT AUSTRALIAN STANDARDS RELATING TO HIS OR HER OWN WORK 12. TERMITE PROTECTION TO BE PROVIDED AS PER AS 3660.1.2000 230 70 190 70 230 4840 3825 3825 4840 8735 remove this extent of brick veneer proposed extension 230 230 proposed garage entry door 3410 bed bed garage 3480 (gable end extension and alteration living doors with wider as per proposed remove brick arches and replace living to be confirmed by owners) proposed extension 70 7350 70 1010 remove door and frame in 70 garage 3410 900 900 900 l'dry bed bed l'dry 900 kit kit 2260 bath bath 230 230 reconfigure framing to unit 2 as per proposed reconfigure beds bath l'dry and kitchen as per proposed 230 70 70 70 190 70 70 70 230 230 2440 1800 1435 2850 2840 1435 1800 2450 5490 23840 existing floor NOTE: INSTALLATION OF ALL EXTERNAL MATERIALS BY BUILDER AS PER MANUFACTURERS SPECIFICATIONS AND CERTIFICATION REQUIREMENTS AS OUTLINED BY NCC PROPOSED: CLIENT: CAROLYN CRESSWELL PH: 0402 365 423 BUILDER: TBC MANDY'S DESIGN & DRAFTING SHEET: 3 of 9 DATE: ISSUE NO: EXTENSION SUSAN LINDEQUE PH: 0413 887 850 PH: 0403 481 474 SCALE: 1:100 3 JULY 2018 G NOTE: THESE DRAWINGS TO BE READ IN CONJUNCTION NOTE: BUILDER TO CONFIRM SITING AND DIMENSIONS BEFORE CONSTRUCTION WITH ENGINEERS DRAWINGS RESPONSIBILITY LIES THERE WITH
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
stage 7.pdfRelated documentApplication case desk ↗
About this file
- File size
- 752 KB (small file)
- File type
No other editions are linked here.