ORDINARY MEETING AGENDA 17 FEBRUARY 2022
b. a 2m wide concrete pathway for the full length of the ‘public thoroughfare’
easement, along the full length of the easement located along the northern
boundary
c. pedestrian pathways between the proposed car parking area and the building/s;
d. adequate separation of all specific pedestrian routes from vehicle access and
manoeuvring areas, and clear demarcation by pavement marking, signposts or
changes in surface materials or levels;
e. signage and lighting at strategic locations to direct people to building entries and
public toilet facilities;
f. bicycle parking spaces and lockers as shown on the approved Ground / Carpark
Plan (Plan SD02, Iss.12).
Stormwater Drainage
25. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with the conditions of
this Decision Notice.
Services
26. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
27. 27.Certification must be submitted to Council from all relevant service providers
(Energex, NBN and Unitywater) which certifies that the development has met the
requirements of this Decision Notice and all applicable legislation at the time of
construction.
Easements
28. A 3 metre wide easement for “Public Thoroughfare” must be registered against the title
of the property in favour of Council. The easement must be located as shown, in red, on
Drawing No. SD03, titled “Level 1 Plan”, Issue 10, dated 31/05/2021 and prepared by
Archicology P/L.
29. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
30. All easements must be designed in accordance with the planning scheme and granted
at no cost to the Grantee. Where the Grantee is Council or a service authority, the
easement documentation must be in accordance with the Grantee’s standard easement
terms. Draft easement documentation must be submitted to Council for endorsement.
31. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Geotechnical Stability
32. All works must be carried out generally in accordance with geotechnical investigation
report 18151-001-Rev0, titled: “Proposed Commercial & Residential Development 30-32
Doonella St Tewantin”, dated 22 June 2018 and prepared by Tectonic Geotechnical and
Environmental Engineers.
33. Certification must be submitted to Council from a qualified person* which certifies that
the development has been constructed in accordance with the recommendations
contained in geotechnical investigation report 18151-001-Rev0, titled: “Proposed
Commercial & Residential Development 30-32 Doonella St Tewantin”, dated 22 June
2018 and prepared by Tectonic Geotechnical and Environmental Engineers, and that the
Page 16 of 29