Appendix E - Construction Management Plan

of 127

Page text read automatically using OCR, there may be inaccuracies

                                                                              1.5m STAR PICKETS AT MAX.                                                                                                                                                                                                                                                                                                               SEDIMENT RELEASE GUIDELINES                                          8.     IF SEDIMENT AND EROSION CONTROL DEVICES HAVE BEEN
                                                                              2.5m CENTRES                                                                                                                                                                                                                                                                                                                                                                                                        FOUND TO BE DIFFERENT OR FAILED IN SERVICE,
                                                                                                                                                                         1 METER MAX.                                                                                                                      TIMBER SPACER TO SUIT                                                         KERB-SIDE INLET              1.    ALL RELEASES OF STORMWATER CAPTURED ONSITE,                           CORRECTIVE ACTION IS TO BE UNDERTAKEN IMMEDIATELY
                                                                                                                                                                                                             STAR PICKETS                                                                                                                                                                                                   UNLESS OTHERWISE NOTED IN THIS STANDARD, MUST NOT                     WHICH MAY INCLUDE AMENDMENTS' ADDITIONS TO THE
                                                                                                                                                                                                                                                                                                                                                                                                                            EXCEED THE FOLLOWING LIMITS:                                          ORIGINAL APPROVED EROSION CONTROL PLANS. SUCH




                           500 - 600mm
                                                                                                                                                                                                             DROP INLET
                                                                              SELF-SUPPORTING                                                                                                                WITH GRATE                                                                                                                                                                                               ·     50mg/L OF TOTAL SUSPENDED SOLIDS (TSS) AS A MAXIMUM                   AMENDMENTS ARE TO BE APPROVED BY SUPERINTENDENT,
                                                                              GEOTEXTILE                                                                                                                                                                                                                                                                                                                                    CONCENTRATION;                                                        IF DEEMED NECESSARY AND RELEVANT.
                                                                                                                                                                                                                                                                                                                                                                                                                      ·     TURBIDITY (NTU) VALUE LESS THAN 10% ABOVE                      9.     OVERALL
                                                                                                                                                                                                             WIRE OR STEEL MESH                                                                                                                                                                                             BACKGROUND;                                                           a. TEMPORARY DRAINAGE CONTROL FLOWS SHOULD BE
                                                                                      OW
                                                                       DIRECTION OF FL                                                                                                                       (14 GAUGE x 150mm
                                                                                                                                                                                                                                                                                                                                                                                                                      ·     pH VALUE MUST BE IN THE RANGE 6.5 TO 8.5 EXCEPT                           DIVERTED AROUND THE WORK SITE WHERE POSSIBLE.
                                                                                                                                                                                                             OPENINGS) WHERE
                                                                                                                                                                                                             GEOTEXTILE IS NOT                                                                                                                                                                                              WHERE, AND TO THE EXTENT THAT, THE NATURAL                            b. ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS TO
                                                                                                                                                                                                             SELF-SUPPORTING                                                                                                                                                                                                RECEIVING WATERS LIE OUTSIDE THIS RANGE.                                  BE INSTALLED AND BE OPERATIONAL BEFORE
                                                                                                                                                                                                                                                                                                                                                                                                                      2.    THE CONCENTRATION OF TSS RELEASED BY DEWATERING                           COMMENCING UP-SLOPE EARTHWORKS.
                                                                              ON SOIL, 150mm x 100mm                                                                                                         WOVEN GEOTEXTILE                                                                                                                                                            GRAVEL-FILLED WIRE MESH OR         MAY ONLY EXCEED 50mg/L WHERE IT CAN BE                                c. IN AREAS WHERE RUNOFF TURBIDITY IS TO BE
                                                                              TRENCH WITH COMPACTED                                                                                                                                                                                                                                                                                      GEOTEXTILE "SAUSAGE"               DEMONSTRATED       AND     SUPPORTED        THROUGH                       CONTROLLED, EXPOSED SURFACES TO BE EITHER
                                                                                                                                                                                                                                                                                                                                                                                                                            DOCUMENTATION THAT:                                                       MULCHED, COVERED WITH EROSION CONTROL
                                                                              BACKFILL AND ON ROCK, SET                                                                                                                                                                                                                                                                                                               ·     FURTHER SIGNIFICANT RAINFALL IS FORECAST TO OCCUR                         BLANKETS OR TURFED IF EARTHWORKS ARE EXPECTED
                                                                              INTO SURFACE CONCRETE                                                                                                                                                                                                                                         OVERFLOW                                                                        BEFORE THE TSS CONCENTRATION IS LIKELY TO BE                              TO BE DELAYED FOR MORE THAN 14 DAYS.
                                                                                                                                                                                                                                                                                                                                                                                TIMBER SPACER
                                                                                                                                                                                                      STAR PICKET                                                                         RUNOFF                                                                                                                            REDUCED TO 50m
                                                                                                                                                                                                      FITTED WITH                                                                                                                                                               TO SUIT                               ·     g/L;                                                          SEDIMENT FENCE
                                                                                                                                                                                                                                                                                          WATER WITH
                                                          SECTION DETAIL                                                                                                                              SAFETY CAP                                                                                                                                                                                                      ·     RELEASING A HIGHER CONCENTRATION OF TOTAL                     10. FOR     SEDIMENT    FENCE   STANDARD      DETAIL   AND
                                 600mm MIN.




                                                                                                                                                                                                                                                                                          SEDIMENT
                                                                                                                                                                                                                                                                                                                                                                                                                            SUSPENDED SOLIDS WILL RESULT IN A BETTER                          SPECIFICATION REFER TO INTERNATIONAL EROSION
                                                                                                                                                                                                                                                                                                                                                                                                                            ENVIRONMENTAL OUTCOME BY PROVIDING STORAGE FOR                    CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST
                                                                                                                                                                                              WOVEN GEOTEXTILE                                                                                                                                                                                                              THE CAPTURE AND TREATMENT OF RUN-OFF FROM THE                     PRACTICES STANDARD DRAWINGS SF-01 AND SF-02
                                                                                                                                         SANDBAGS                                                                                                                                                                                                                                                                           IMMINENT RAINFALL AND RUN-OFF.                                    SEDIMENT FENCE.
                                                                                                                                                                                                                                                                                                SEDIMENT                                                                                                              ·     ALL REASONABLE AND PRACTICABLE STEPS HAVE BEEN                TEMPORARY CONSTRUCTION ENTRY/EXIT
                                                                 20m MAX.                                                                                                                                RUNOFF WATER
           MIN. 1.5m




                                                                                                                                                                                                                                                                                                                                                                                                                            TAKEN TO TREAT THE WATER WITHIN BEST-PRACTICE TIME            11. FOR CONSTRUCTION ENTRY / EXIT STANDARD DETAIL AND
                                                                                                                                                                                                         WITH SEDIMENT




                                                                                                                                                                         FLOW
                                                                                                                                                                                                                                                                                              GRAVEL-FILLED WIRE MESH OR                                                                FILTERED WATER                      FRAMES;                                                           SPECIFICATION REFER TO INTERNATIONAL EROSION
                                                                                  FLOW
                                                                                                                                         WATERWAY                                                                                                                                                                                                                                                                     ·     FLOCCULENT HAS BEEN APPROPRIATELY APPLIED AND THE                 CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST
                                                                                                                                                                                                                                                                                              GEOTEXTILE "SAUSAGE"                                                                                                          CONCENTRATION OF TSS IN THE CAPTURED WATER HAS                    PRACTICES STANDARD DRAWINGS EXIT-01 AND EXIT-02
                                         STAR PICKETS AT MAX.
                                                                                                                                                                                                                                                                                                                                                                                                                            ALREADY SIGNIFICANTLY DECREASED.                                  CONSTRUCTION EXIT - ROCK PAD (CONSTRUCTION SITES
                                         2.5m SPACINGS
                                                                                                                                                                                                                                                                                                                                                                                                                      3.    FOR ALL OTHER STORMWATER RELEASES, FLOWS AND                      ONLY), EXIT-03 - ROCK PADS FOR BUILDING SITES AND
                                         TYPICAL                                                                                        EXCAVATION                                                                                                                                                                                                                                                                          DISCHARGES FROM THE SITE, THE RELEASE LIMIT                       EXIT-04 AND EXIT-05 CONSTRUCTION EXIT - VIBRATION GRID.
                                                                                                                                                                                                                                                                                                            MESH & GRAVEL INLET FILTER CONSTRUCTION NOTES:                                                                  PRESCRIBED IN (1A) ABOVE MUST NOT BE EXCEEDED                 KERB INLET
                                                                                                                                                                                                                                                    FILTERED
                                                                                                                                                                                                                                                                                                                                                                                                                            UNLESS THE DEVELOPMENT IS IN FULL COMPLIANCE WITH             12. FOR KERB INLET STANDARD DETAIL AND SPECIFICATION
                                                                                                                                                                                                                                                     WATER                                                                                                                                                                  THIS STANDARD.                                                    REFER     TO     INTERNATIONAL   EROSION      CONTROL
                                                                   PLAN                                                                                                                                  GEOTEXTILE EMBEDDED                                                                                1.     INSTALL FILTERS TO KERB INLETS ONLY AT SAG POINTS.
                                                                                                                                        EARTH BANK                                                                                                                                                                                                                                                                                                                                            ASSOCIATION AUSTRALASIA (IECA) BEST PRACTICES
                                                                                                                                                                                                         150mm INTO GROUND
                                                                                                                                                                                                                                                                                                                                                                                                                      SEDIMENT CONTROL                                                        STANDARD DRAWING ESC-03 KERB INLET SEDIMENT TRAPS
                                                                                                                                                                                                                                                                                                            2.     FABRICATE A SLEEVE MADE FROM GEOTEXTILE OR WIRE MESH                                               1. ALL SEDIMENT AND EROSION CONTROL MEASURES TO BE IN               REVEGETATION
                                                                                                                                                                                                                                                                                                                   LONGER THAN THE LENGTH OF THE INLET PIT AND FILL IT WITH                                               ACCORDANCE WITH INTERNATIONAL EROSION CONTROL                   13. FOR REVEGETATION STANDARD SPECIFICATION REFER TO
                                                                                                                                                                                              FOR DROP INLETS AT NON-SAG POINTS, SANDBAGS,                                                                         25mm TO 50mm GRAVEL.                                                                                   ASSOCIATION (IECA) AUSTRALIA GUIDELINES AND THE                     INTERNATIONAL      EROSION    CONTROL      ASSOCIATION
                                                                                                                                                                                              EARTH BANK OR EXCAVATION USED TO CREATE                                                                                                                                                                                     SPECIFICATIONS.                                                     AUSTRALASIA (IECA) BEST PRACTICES STANDARD DRAWING
                                                                                                                                                                                              ARTIFICIAL SAG POINT                                                                                          3.     FORM AN ELLIPTICAL CROSS-SECTION ABOUT 150mm HIGH x                                                2. SEDIMENT AND EROSION CONTROL DETAILS SHOWN ARE                       R-01 REVEGETATION GENERAL.
                                                                           DIRECTION OF                                                                                                                                                                                                                            400mm WIDE.                                                                                            MINIMUM REQUIREMENTS. IT IS THE CONTRACTORS                     FIELD INLET
                                              DISTURBED                                        1.5m STAR PICKETS AT
                                                                           FLOW                                                             GEOTEXTILE INLET FILTER CONSTRUCTION NOTES:                                                                                                                                                                                                                                   RESPONSIBILITY TO INSTALL ADDITIONAL CONTROL                    14. FOR FIELD INLET STANDARD DETAIL AND SPECIFICATION
                                              AREA                                             MAX. 2.5m CENTRES
                                                                                                                                                                                                                                                                                                                                                                                                                          MEASURES AS DEEMED NECESSARY THROUGHOUT                             REFER     TO     INTERNATIONAL   EROSION      CONTROL
                                                                                                                                                                                                                                                                                                            4.     PLACE THE FILTER AT THE OPENING LEAVING AT LEAST A 100mm
                                                                                                                                                                                                                                                                                                                                                                                                                          CONSTRUCTION.                                                       ASSOCIATION AUSTRALASIA (IECA) BEST PRACTICES
                                                                                                                                            1.        FABRICATE A SEDIMENT BARRIER MADE FROM GEOTEXTILE OR STRAW BALES.                                                                                            SPACE BETWEEN IT AND THE KERB INLET. MAINTAIN THE OPENING
                                                                                                                                                                                                                                                                                                                                                                                                                      3. THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN ALL                        STANDARD DRAWING ESC-02 GRATED STORMWATER (FIELD)
                                                                                                                                                                                                                                                                                                                   WITH SPACER BLOCKS.                                                                                    SEDIMENT CONTROL DEVICES IN A FUNCTIONAL ORDER                      INLET SEDIMENT TRAP.
                                                                                                                                            2.        PICKET SPACING TO BE A MAXIMUM 1.0m CENTRES.                                                                                                                                                                                                                        AND REPLACE ALL BLOCKED SEDIMENT DEVICES AS                     OPERATION AND MAINTENANCE
                                                                                                                                                                                                                                                                                                            5.     FORM A SEAL WITH THE KERB TO PREVENT SEDIMENT BYPASSING                                                REQUIRED UNTIL SUCCESSFUL OFF MAINTENANCE OF                    15. IN ACCORDANCE WITH NC ESC GUIDELINES, ALL ESC
                                                                                                                                            3.        IN WATERWAYS, ARTIFICIAL SAG POINTS CAN BE CREATED WITH SANDBAGS OR EARTH BANKS AS                                                                           THE FILTER.                                                                                            WORKS.                                                              MEASURES SHALL BE INSPECTED: · AT LEAST DAILY (WHEN
                                                                                                                                                      SHOWN IN THE DRAWING.                                                                                                                                                                                                                                           4. CONSTRUCTION OF ALL SEDIMENT MANAGEMENT DEVICES                      WORK IS OCCURRING ON SITE) OR WEEKLY (WHEN WORK IS
                                                                                                                                                                                                                                                                                                            6.     SANDBAGS FILLED WITH GRAVEL CAN SUBSTITUTE FOR THE MESH                                                TO THE SATISFACTION OF THE SUPERINTENDENT. SHALL BE                 NOT OCCURRING ON SITE) · WITHIN 24 HOURS OF
                                                                                                                                            4.        DO NOT COVER THE INLET WITH GEOTEXTILES UNLESS THE DESIGN IS ADEQUATE TO ALLOW FOR                                                                           OR GEOTEXTILE PROVIDING THEY ARE PLACED SO THAT THEY                                                   COMPLETED AND EFFECTIVE PRIOR TO:                                   EXPECTED RAIN; AND · WITHIN 18 HOURS OF A RAINFALL
                                                                                                                                                      ALL WATERS TO BYPASS IT.                                                                                                                                     CAN FIRMLY ABUT EACH OTHER AND SEDIMENT-LADEN WATERS                                                   a. STRIPPING OF TOPSOIL AND GRASS.                                  EVENT (I.E. AN EVENT OF SUFFICIENT INTENSITY AND
                                                                                                                                                                                                                                                                                                                   CANNOT PASS BETWEEN.                                                                                   b. BULK EARTHWORKS TO THE SITE.                                     DURATION TO MOBILISE SEDIMENT ON SITE).
                                              UNDISTURBED                                                                                                                       GEOTEXTILE INLET FILTER A                                                                                                                     MESH & GRAVEL INLET FILTER
                                                                                                                                                                                                                                                                                                                                                                                                                          c. SERVICES INSTALLATION.                                       16. IN ACCORDANCE WITH NC ESC GUIDELINES, MAINTENANCE
                                                                                                                                                                                                                                                                                                                                                                                                                          d. PAVEMENT CONSTRUCTION                                            OF ESC MEASURES SHALL OCCUR IN ACCORDANCE WITH
                                              AREAS                                                                                                                                            SCALE N.T.S                                                                                                                                                                                                            5. ALL SEDIMENT MANAGEMENT MEASURES ARE TO REMAIN IN                    THE FOLLOWING TABLE:
                                                                                                                                                                                                                                                                                                                                                       SCALE N.T.S                                                        PLACE UNTIL INSTRUCTION IS RECEIVED IN WRITING FROM
                                                                                                                                                                                                                                                                                                                                                                                                                          THE SUPERINTENDENT TO REMOVE ALL OR PART OF THE                                      MAINTENANCE SCHEDULE
                                                                                                                                                                                                                                                                                                                                                                                                                          SILT CONTROL APPLICATIONS.
                                                                                                                                                                                                                                                                                                                                                                                                                      6. THE BULK EARTHWORKS AND SEDIMENT CONTROL LAYOUT                                                              TIMEFRAME FOR
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  MAINTENANCE
                                                                                                                                                                                                                                                                                                                                                                                                                          PLAN SHALL BE READ IN CONJUNCTION WITH THE                        ESC MEASURES                              COMPLETION OF
                                                                                                                                                                                                                                                                                                                                                                                                                          APPROVED DRAWINGS.                                                                        TRIGGER
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       MAINTENANCE
      SEDIMENT FENCE CONSTRUCTION NOTES:                                                                                                                                                                                                                                                                                                                                                                              7. PRIOR TO COMMENCEMENT OF CONSTRUCTION APPROVAL
                                                                                                                                                                                                                                                                                                                                                                                                                          IS TO BE OBTAINED FROM THE SUPERINTENDENT FOR THE                                      WHEN SETTLED
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  SEDIMENT     SEDIMENT EXCEEDS
      1.          CONSTRUCT SEDIMENT FENCES AS CLOSE AS POSSIBLE TO BEING PARALLEL TO THE                                                                                                                                                                                                                                                                                                                                 LOCATION OF THE SITE ACCESS POINT AND WASH DOWN                                                        WITHIN 7 DAYS OF THE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                BASIN (WHERE   THE VOLUME OF THE
                  CONTOURS OF THE SITE, BUT WITH SMALL RETURNS AS SHOWN IN THE DRAWING TO                                                                                                                                                                                                                                                                                                                                 AREA WHICH ARE TO BE MAINTAINED THROUGHOUT THE                                                             INSPECTION
                                                                                                                                                                                                                                                                                                                                                                                                                          CONSTRUCTION PERIOD.                                                    UTILISED)    SEDIMENT STORAGE
                  LIMIT THE CATCHMENT AREA OF ANY ONE SECTION. THE CATCHMENT AREA SHOULD BE                                                                                                                                                                                                                                                                                                                                                                                                                          ZONE
                  SMALL ENOUGH TO LIMIT WATER FLOW IF CONCENTRATED AT ONE POINT TO 50 LITRES
                  PER SECOND IN THE DESIGN STORM EVENT, USUALLY THE 10-YEAR EVENT.                                                                                                                                                                                                                                                                                                                                                                                                                             1/3 OF THE CAPACITY
                                                                                                                                                 GRADIENT OF DRAIN                                                                                                                                                                                                                                                                                                                               OTHER ESC
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               OF ESC MEASURES IS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     BY THE END OF THE
                                                                                                                                                 1% TO 5%                                   CAN BE CONSTRUCTED WITH           ALL BATTER GRADES                                                                                                                                                                                                                                                  MEASURES                                   DAY
      2.          CUT A 150mm DEEP TRENCH ALONG THE UPSLOPE LINE OF THE FENCE FOR THE BOTTOM                                                                                                                                                                                                                                                                                                                                                                                                                        EXCEEDED
                                                                                                                                                                                            OR WITHOUT CHANNEL                2(H):1(V) MAX.
                  OF THE FABRIC TO BE ENTRENCHED.
                                                                                                                                                                                                                                                                                                                                                                    STABILISE STOCKPILE SURFACE
      3.          DRIVE 1.5m LONG STAR PICKETS INTO GROUND AT 2.5m INTERVALS (MAX.) AT THE                                                       DIRECTION O                                                                                                                                                                                                                                                                                                                              REPORTING
                                                                                                                                                                    F FLOW
                  DOWNSLOPE EDGE OF THE TRENCH. ENSURE ANY STAR PICKETS ARE FITTED WITH                                                                                                                                                                                              EARTH BANK                                                                                                                                                                                           17. CONTRACTOR IS TO PROVIDE AN UPDATED PROGRAM OF
                                                                                                                                                                                                                                                                                                                                                                  2:1
                                                                                                                                                                                                                                                                                                                                                   )                  S                                                                                                                       ESC MAINTENANCE AND CONTROL OF ALL STAGES OF
                  SAFETY CAPS.                                                                                                                                                                                                                                                                                                                 AX.                     LO


                                                                                                                                                                                                                                     300mm MIN.
                                                                                                                                                                                                                                                                                                                                          (M                              PE                                                                                                                  WORK FOR APPROVAL BY THE SUPERINTENDENT.
                                                                                                                                                                                                                                                                                              FLOW                                     PE                                      (MA
                                                                                                                                                                                                                                                                                                                                  SLO                                             X.)
      4.          FIX SELF-SUPPORTING GEOTEXTILE TO THE UPSLOPE SIDE OF THE POSTS ENSURING IT                                                                                                                                                                                                                               2:1
                  GOES TO THE BASE OF THE TRENCH. FIX THE GEOTEXTILE WITH WIRE TIES OR AS
                  RECOMMENDED BY THE MANUFACTURER. ONLY USE GEOTEXTILE SPECIFICALLY                                                                                                             2m MIN
                  PRODUCED FOR SEDIMENT FENCING. THE USE OF SHADE CLOTH FOR THIS PURPOSE IS
                                                                                                                                                       150mm MIN




                  NOT SATISFACTORY.                                                                                                                                             NOTE: ONLY TO BE USED AS TEMPORARY BANK WHERE                                                                                                                                  SEDIMENT FENCE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                              PROVIDE WASH WATER FOR TRUCKS
                                                                                                                                                                                MAXIMUM UPSLOPE LENGTH IS 80 METRES.
      5.          JOIN SECTIONS OF FABRIC AT A SUPPORT POST WITH A 150mm OVERLAP.                                                                                                                                                                                                                                                                                                                                          TIMBER SLEEPER OR METAL                            EXITING SITE
                                                                                                                                                                                                                                                                                                                                                                                                                           GRID 100mm HIGH AND SPACED
                                                                                                                                                                                                                                                                                         STOCKPILE CONSTRUCTION NOTES:                                                                                                     AT 300mm CTS
      6.          BACKFILL THE TRENCH OVER THE BASE OF THE FABRIC AND COMPACT IT THOROUGHLY                                                      DIVERSION DRAIN CONSTRUCTION NOTES:                                                                                                                                                                                                                                                                                              MIN LE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        NGTH 1
                  OVER THE GEOTEXTILE.                                                                                                                                                                                                                                                                                                                                                                                                                                                           0m
                                                                                                                                                                                                                                                                                         1.     PLACE STOCKPILES MORE THAN 2 (PREFERABLY 5) METRES FROM EXISTING                                                                                                                                                       BERM 300 HIGH MIN
                                                                                                                                                 1.    BUILD WITH GRADIENTS BETWEEN 1% AND 5%.                                                                                                  VEGETATION, CONCENTRATED WATER FLOW, ROADS AND HAZARD AREAS.                                                          CONSTRUCTION SITE
                                                   SEDIMENT FENCE
                                                                                                          WRAP FILTER                            2.    AVOID REMOVING TREES AND SHRUBS IF POSSIBLE - WORK AROUND THEM.
                                                           SCALE: N.T.S.                                                                                                                                                                                                                 2.      CONSTRUCT ON THE CONTOUR AS LOW, FLAT, ELONGATED MOUNDS.
                                                                                                          CLOTH OVER GRATE                                                                                                                                                                                                                                                                                                                                                                                                   EXISTING ROADWAY
                                                                                                                                                 3.    ENSURE THE STRUCTURES ARE FREE OF PROJECTIONS OR OTHER IRREGULARITIES                                                             3.     WHERE THERE IS SUFFICIENT AREA, TOPSOIL STOCKPILES SHALL BE LESS THAN 2
                                               WRAP FILTER CLOTH OVER                                                                                  THAT COULD IMPEDE WATER FLOW.                                                                                                            METRES IN HEIGHT.
      RUNOFF WATER                             GRATE                                                                                                                                                                                                                                                                                                                                                                  GEOTEXTILE FABRIC
      WITH SEDIMENT                                                                                                                              4.    BUILD THE DRAINS WITH CIRCULAR, PARABOLIC OR TRAPEZOIDAL                                                                          4.      WHERE THEY ARE TO BE PLACE FOR MORE THAN 10 DAYS, STABILISE FOLLOWING THE
                                                                                                                                                       CROSS-SECTIONS, NOT "V" SHAPED.                                                                                                           APPROVED ESCP OR SWMP TO REDUCE THE C-FACTOR TO LESS THAN 0.10.                                                                                                              50-75mm GRAVEL BED MIN
                                                                                                                                                 5.    ENSURE BANKS ARE PROPERLY COMPACTED TO PREVENT FAILURE.                                                                                                                                                                                                                                                                200mm THICK
                                                                                                                                                                                                                                                                                         5.      CONSTRUCT EARTH BANKS ON THE UPSLOPE SIDE TO DIVERT WATER AROUND
                                                                                                                                                                                                                                                                                                 STOCKPILES AND SEDIMENT FENCES 1 TO 2 METRES DOWNSLOPE.                                                                                       RUNOFF FROM PAD DIRECTED TO
                                                                FILTERED                                                                         6.    COMPLETE PERMANENT OR TEMPORARY STABILISATION WITHIN 10 DAYS OF                                                                                                                                                                                                                         SEDIMENT TRAP
                                                                 WATER                                                                                 CONSTRUCTION.

                                                                                                                                                                                 DIVERSION DRAIN                                                                                                                                                   STOCKPILES                                                                        TEMPORARY CONSTRUCTION VEHICLE EXIT
                                                GEOTEXTILE INLET FILTER TYPE B                                                                                                          SCALE N.T.S                                                                                                                                                     SCALE N.T.S                                                                                           SCALE: N.T.S.
                                                                   SCALE N.T.S




NOT FOR CONSTRUCTION
                                                                                                                      North Point   Approved                                                                                                                                                                                                                   Project Address                                                         Title

                                                                                                                                                                                                                                                                                                                                                               65-67 ELANDA STREET, SUNSHINE                                            EROSION AND SEDIMENT CONTROL DETAILS
                                                                                                                                                                                                                                                                                                                                                               BEACH
                                                                                                                                    For and on behalf of RECOR Pty Ltd.
                                                                                                                                    Scale                                                                                                                    ENGINEERING & PROJECT SERVICES                                                                    Client Details                                                          Project Name                                                                                             Sheet Size
                                                                                                                                                                                                                                                                SUNSHINE COAST | BRISBANE
                                                                                                                                                                                  NTS                                                                          www.recor.au | ABN 89 647 469 707                                                               CALA DESIGN PTY LTD                                                      PROPOSED UNIT DEVELOPMENT                                                                                  A1
 A    14.12.23         ISSUE FOR APPROVAL                                                         AB       MP                                                                                                             COPYRIGHT © This drawing is subject to copyright in accordance with the agreement between RECOR Pty Ltd and RECOR's                                                                                          Project Number                                            Drawing Number                                  Revision

                                                                                                                                                                                                                                                                                                                                                                                                                                        20230151                                                  C046                                             A
                                                                                                                                                                                                                          client. This drawing shall only be used for this specific project. This drawing shall not be used for construction until marked as

Rev    Date                                       Revision Description                          Drawn Check                                                        DO NOT SCALE, IF IN DOUBT ASK                                                                'Issued For Construction' in the revision description.

Log in to download the original (Appendix E - Construction Management Plan.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.