Skip to the record
Every meeting, every word.

Original source · versioned page text

Appendix E - Construction Management Plan

of 127

Page text read automatically using OCR, there may be inaccuracies

 

 

nbn’'©:

LEGEND

 

Parcel and the location

 

Pit with size “S”

 

Power Pit with size “2E”.
Valid PIT Size: e.g. 2E, SE, GE, BE, 9E, E, null.

 

Manhole

 

Pillar

 

 

Cable count of trench ts 2.
One “Other size” PVC conduit (PO) owned by Telstra (-T-),

 

 

pnp between pits of sizes, “5” and “S” are 25.0m apart.
“3 One 40mm PVC conduit (P40) owned by NBN, between pits of
sizes, "5" and “9” are 20.0m apart.
2
10.0m 2 Direct buried cables between pits of sizes "5" and “8” are
G) T G) 10,0m apart.

 

Trench containing any INSERVICE/CONSTRUCTED
(Coppor/RF/Fibra) cables.

 

Tranch containing only DESIGNED/PLANNED
(Copper/RF/Fibre/Power) cables.

 

Trench containing any |NSERVICE/CONSTRUCTED (Power)
cables.

 

PROALDWAY ST

Road and the street name “Broadway ST”

 

 

 

Scale

 

0 20 40 60 Meters
1;2000

eS

 

 

 

 

Log in to download the original (Appendix E - Construction Management Plan.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.