Original source · versioned page text
Appendix E - Construction Management Plan
Traffic Management Plan - MPH09-BBN-ELAN-TMP-01 Unit Construction – 65-67 ELANDA St, Sunshine Beach, QLD. 4567 ______________________________________________________________________________________ 3.4 ROAD USER INFORMATION No current traffic analysis available for the effected roadway area. For the purpose of this TMP, it is assumed that the traffic characteristic will not exceed: - MAX AADT: 1000 - Composition: 1A,2A,2B,2C Refer Fig 3c for Vehicle class information. Vehicle Class Traffic is categorised as per the Austroads Vehicle Classification scheme. Traffic classes are in the following hierarchical format: Volume or All Vehicles 00 = 0A + 0B Light Vehicles 0A = 1A 1A = 2A + 2B Heavy Vehicles 0B = 1B + 1C + 1D 1B = 2C + 2D + 2E 1C = 2F + 2G + 2H + 2I 1D = 2J + 2K + 2L The following classes are the categories for which data can be captured: Volume 00 All vehicles 2-Bin 0A Light vehicles 0B Heavy vehicles 4-Bin 1A Short vehicles 1B Truck or bus 1C Articulated vehicles 1D Road train 12-Bin 2A Short 2 axle vehicles 2B Short vehicles towing 2C 2 axle truck or bus 2D 3 axle truck or bus 2E 4 axle truck 2F 3 axle articulated vehicle 2G 4 axle articulated vehicle 2H 5 axle articulated vehicle 2I 6 axle articulated vehicle 2J B double 2K Double road train 2L Triple road train Fig.3c – Road Vehicle Classification and hierarchical information as per TARS. (Sourced and supplied by MPH.) MPH09-BBN-ELAN-TMP-01 Document uncontrolled when printed or saved Page 12 of 61
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Appendix E - Construction Management Plan.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.