Appendix E - Construction Management Plan
www.invarion.com
DATE: 16/07/2024
CONSTRUCTION WORKS - Multiple Dwelling Construction Works (MDCW) TGS TITLE: COVER PAGE
ROAD SURFACE CORRECTION (RSC) - Road Closure / Detour TGS ID: MP09-BBN-RSC-RCDET-65ELANDA-01-02 TGS SEQUENCE : 2 OF 2 DESIGNED BY: DENNIS MILES
65 - 67 ELANDA St. Sunshine Beach, QLD. 4567 TMD #: OP-892
PROJECT ID: Rev #: 0 SIGNED:
PROJECT DETAILS LOCATION OF WORKS: 65-67 ELANDA St (SUNSHINE BEACH Census Id: N/A AADT:N/A
N Est. V per Day/Composition: N/A Avg (Ma) N/A % Oversize (Mo)
LOCATION:
Location of works will be required (approx.) at: Est. V per Peak Period (Pk): N/A / 10 = N/A Pk
-65 - 67 ELANDA St, SUNSHINE BEACH, QLD, 2567
Est. V per 5min at Pk: N/A / 12 = N/A 5m/Pk
SCOPE OF WORKS:
Traffic Guidance Scheme/s will be provided for: TRAFFIC GUIDANCE SCHEME'S - OPTIONS ANALYSIS - PEDESTRIANS
-ROAD SURFACE CORRECTION (RSC)
OPTION DESCRIPTION TGS SELECTED
WORKS AREA PROTECTION METHOD:
AROUND Pedestrians diverted around work area utilising
-STATIC WORK SITE: existing crossing and/or driveway.
-ROAD CLOSED / DETOUR
-PEDESTRIAN CONTROL
PAST Minimum 1.0m footway maintained past work
PEDESTRIANS: area (on the verge or on the roadway) with
Pedestrian access will: appropriate delineation.
-PEDESTRIAN TRAFFIC UNEFFECTED
-PEDESTRIAN TRAFFIC DIVERTED DURING SELECTED PHASE ONLY Minimum 1.0m footway maintained through the
THROUGH
work zone such that pedestrians are safely
CYCLISTS: managed under traffic control (eg. passage
-Cyclists can use roadway to access local properties. through between work area and parked work
-Cyclists SHALL SHARE THE ROAD or USE EXISTING SHARED FOOTPATH vehicle as delineation from live traffic).
PUBLIC TRANSPORT:
-BUS STOPS: 317889 and 302191 Routes: 620,630 TABLE 4.1 WORKS PROTECTION METHODS
-UNEFFECTED, PROVISIONED UNDER TGS
Works Method Applicable tasks
LOCAL BUSINESSES / RESIDENTS:
-UNEFFECTED, PROVISIONED UNDER TGS All works which are greater in scope and duration
Static work site than can be handled by the short term, low impact provisions listed below
or by mobile works.
SCAN TO DOWNLOAD THIS PLAN IN PDF
TRAFFIC GUIDANCE SCHEME'S - OPTIONS ANALYSIS - ROADWAY
Short term, low Isolated work on pavements of up to 5 min duration,
impact, works - traffic volumes permitting.
OPTION DESCRIPTION CLOSURE TYPE FEATURES TGS SELECTED open road areas Shoulder grading and verge mowing.
AROUND Vehicles detoured Full Closure / Removes all traffic from working area / Enables local traffic / All through traffic to follow detour
Short term, low Work adjacent to or in a traffic lane of duration 5 min to works 1 hour
via existing roads / One Way Closure / route/s / Minimal delays.
side track Detour impact, works - depending on traffic volume.
built-up areas Median and verge mowing, footpath works.
PAST Vehicles past Partial Lane / Allows work area and also 2 x trafficable lanes (one lane each direction) to be maintained at all
delineated work Lateral Shift / times. Lanes to be 3.0m minimum width each. Applicable where traffic is simply required to
Works on unsealed
Maintenance grading. Short term partial road closures.
zones Parking Lane / shift laterally without conflict with another traffic stream (i.e. - still allowing opposite traffic to roads
Shoulder Closure - flow with use of traffic cones to delineate travel path of both lanes - where required).
(2 way traffic ROAD WORKER SAFETY HOTLINE
maintained) 1800 501 509 Linemarking, pavement marker laying or removal, pavement testing where
TGS EFFECTIVENESS AND/OR SUGGESTED IMPROVEMENTS:
Mobile works all signs and other protective devices are carried on vehicles.
PLEASE EMAIL BACK [email protected]
FOR EVALUATION PURPOSES.
Contra-flow Minimum 1 x trafficable lane (each direction) to be maintained at all times. Traffic to be placed
(2 way traffic on opposite side of roadway (away from work area) where there is a minimum 2 lanes
PROJECT SPECIFIC TGS' / AMENDMENT REGISTER
maintained) available to enable 1 lane of traffic in each direction. Lanes to be 3.0m minimum width each.
40 TGS Number TGS / PAGE TITLE Design / Revision
Single or Multi Lane Allows for work area to be held in closed lane/s (one direction of flow) when the roadway is Front / Options Analysis INITIAL
REDUCE SPEED
MP09-BBN-RSC-RCDET-65ELANDA-01-02
Closure a multilane road. Remaining lane/s to be 3.0m minimum width. 2 way traffic maintained.
MP09-BBN-RSC-RCDET-65ELANDA-01-02 Risk Assessment / Notes INITIAL
SITE SPEED IS MP09-BBN-RSC-RCDET-65ELANDA-01 65-67-Elanda-MDCW-RSC INITIAL
Single Lane / Shuttle Where the work area does not provide two-way traffic to be maintained on a two way road
50/60Kph
Flow or Stop / Slow (single flow each direction) Reversible - Shuttle Flow control methods shall be required. MP09-BBN-RSC-RCDET-65ELANDA-01 65-67-Elanda-MDCW-RSC INITIAL
Control Remaining lane width of 3.0m shall be maintained to allow for single file of traffic past work WORK AREA TO
area. Control Methods able to be used - Traffic Controllers / Temporary or Portable Traffic BE REDUCED TO
Control Devices. 40Kph ONLY
WHERE
WORKERS ARE
THROUGH Vehicles through Temporary Closure / Allowing access through the work zone when safe to do so. Temporarily holding traffic to allow WITHIN 1.2M OF
work zone Hold and Release / construction vehicles to access construction site via reversing in / out or driving in / out under TRAFFIC.
Local Traffic Access Hold & Release provisions & or survey works. When construction works are occurring on a
roadway where there is only 1 way in and out - Local Access maintained at all times - traffic
may need to be held to enable safe travel path to vehicles to gain access to properties. Map Not to Scale
Client's Company DURACK
: BBN CIVIL
CONSTRUCTIONS Location of Works : 65 -67QLD
**?** ELANDA
4**?**St Local Government Authority : Noosa Council
**?** Council
TTMContact
Site ContactName
Name Chandel
: Brett Eyre
Hardner Cross St 1 : PACIFIC
**?** St. Ave QDTMR District : 407
**?**North Coast
Contact # 0432 715
: 00419 745424
809 Cross St 2 : FERGUSON
**?** St. St. QPS District : Central
**?**
**?** Works:
Scope of Works / Closures : Road SurfaceLS?/ HR? - Road Close/Detour
Correction Suburb **?**
: SUNSHINE BEACH, QLD 4567 Emergency Services : ACCESS MAINTAINED
Proposed Start Date **?**
: TBA Road Configuration 1L M/L Div
: 1L/2W CAT:**?**
CAT: 2 Local Businesses / Residents : ACCESS MAINTAINED
Proposed Duration Term : TBA**?** Posted Speed Limit **?**/**?**Km/h
: 50/60 Km/h
SOUTH WEST TRAFFIC MANAGEMENT - Email: [email protected] Web: www.swtrafficmanagement.com
Working Hours **?**
: 0700-1700 M-F, 0800-1530 S-S. Traffic Min Lane Width **?**mm
: 3.2
Powered by MILES PLANNING HOUSE - Email:[email protected] Web:milesplanning.com.au
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Appendix E - Construction Management Plan.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.