Skip to the record
Every meeting, every word.

Original source · versioned page text

DA Form 1

of 13

Page text shows just the words. Original shows the document exactly as it was published.

 10) Subdivision
 10.1) For this development, how many lots are being created and what is the intended use of those lots:
 Intended use of lots created             Residential            Commercial             Industrial                    Other, please specify:


 Number of lots created

 10.2) Will the subdivision be staged?
        Yes
        No
 How many stages will the works include?
 What stage(s) will this development application apply
 to?

 11) Dividing land into parts by agreement – how many parts are being created and what is the intended use of the
     parts?
 Intended use of parts created            Residential            Commercial             Industrial                    Other, please specify:


 Number of parts created

 12) Boundary realignment
 12.1) What are the current and proposed areas for each lot comprising the premises?
                                   Current lot                                                                Proposed lot
 Lot on plan description           Area (m²)                                         Lot on plan description          Area (m²)




 12.2) What is the reason for the boundary realignment?



 13) What are the dimensions and nature of any existing easements being changed and/or any proposed easement?
       (attach schedule if there are more than two easements)

 Existing or proposed?              Width (m)           Length (m)       Purpose of the easement? (e.g.              Identify the land/lot(s)
                                                                         pedestrian access)                          benefited by the easement




Division 3 – Operational work
Note: This division is only required to be completed if any part of the development application involves operational work.
 14.1) What is the nature of the operational work?
        Road work                                         Stormwater                                          Water infrastructure
        Drainage work                                     Earthworks                                          Sewage infrastructure
        Landscaping                                       Signage                                             Clearing vegetation

        Other – please specify:

 14.2) Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)

        Yes – specify number of new lots:
        No

                                                                                                                                              Page 5
                                                                                                           DA Form 1 - Development application details
                                                                                                                          Version 1.6 - 2 August 2024
Log in to download the original file

DA Form 1.pdf · 421 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.