NOTE: 10. WHERE ANY EXCAVATION OR CONSTRUCTION WORKS ARE TO BE IN CLOSE
PROXIMITY TO NEIGHBOURING LOT BOUNDARIES OR INFRASTRUCTURE,
THE FOLLOWING INSPECTIONS MUST BE COMPLETED BY RECOR ENGINEERS CONTRACTOR TO ALLOW IN SCOPE OF WORKS TO PROVIDE ALL MEASURES
BEFORE ENGINEERING CERTIFICATION WILL BE ISSUED. THE CONTRACTOR IS TO NECESSARY TO ENSURE THE INTEGRITY OF EXISTING BOUNDARIES AND
PROVIDE A MINIMUM OF 72 HOURS NOTICE TO RECOR FOR REQUIRED INFRASTRUCTURE. THIS MAY INCLUDE THE USE OF LOW VIBRATION
INSPECTIONS. SHOULD THE CONTRACTOR FAIL TO REQUEST AN INSPECTION, EQUIPMENT, TRENCH SHORING ETC AS REQUIRED.
THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL COSTS TO ALLOW FOR THE
WORKS TO BE INSPECTED TO THE SATISFACTION OF RECOR. ANY INSPECTIONS 11. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON
THAT FAIL ARE TO BE RE-INSPECTED WITH ALL REINSPECTION COSTS TO BE PAID THESE DRAWINGS, THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE
BY THE CONTRACTOR. WRITTEN CONFIRMATION THAT WORKS CAN COMMENCE.
a. PRESTART 12. CONTRACTOR TO PROVIDE AS CONSTRUCTED DRAWINGS FOR ALL
CONSTRUCTED WORKS IN ACCORDANCE WITH LOCAL GOVERNMENT
b. EARTHWORKS - FINAL STRIPPING OF TOPSOIL, INSTALLATION OF SEDIMENT REQUIREMENTS. UNLESS OTHERWISE ADVISED BY RECOR CONTRACTOR TO
AND EROSION CONTROL MEASURES UNSUITABLE GROUND NOTE COUNCILS ADAC REQUIREMENTS.
c. SIDE AND CUT OFF DRAINS 13. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH RELEVANT
d. STORMWATER PIPE LAID ON BEDDING PRIOR TO BACKFILL APPROVALS.
e. STORMWATER TRENCH BACKFILLED PRIOR TO PAVEMENT PLACEMENT 14. CONTRACTOR TO ALLOW TO LIASE/CO-ORDINATE WITH ELECTRICAL,
LANDSCAPE AND OTHER SERVICE CONTRACTORS THROUGHOUT CIVIL
f. STORMWATER STRUCTURE BASE SLABS CONSTRUCTION.
g. SEWER RETICULATION 15. CONTRACTOR TO ORGANISE ALL DEMOLITION PERMITS PRIOR DEMOLITION
h. WATER RETICULATION WORKS COMMENCING ON SITE.
i. PAVEMENT SUBGRADE 16. CONTRACTOR TO ALLOW TO DEMOLISH ALL EXISTING STRUCTURES, ROADS
AND SERVICES WITHIN LIMIT OF WORKS AND REMOVE FROM SITE U.N.O.
j. PAVEMENT REINFORCING
17. CONTRACTOR TO UNDERTAKE DILAPIDATION REPORT FOR ADJOINING
k. PAVEMENT PRIOR TO SEALING (PRESEAL) PROPERTIES AND COUNCIL ROADS AND VERGES PRIOR TO COMMENCEMENT
l. RETAINING WALL FOOTING REINFORCING OF ANY WORKS ON SITE.
m. RETAINING WALL BLOCKWORK PRIOR TO CORE FILL 18. CONTRACTOR TO CLEAR AND GRUB ALL VEGETATION ON SITE AS IDENTIFIED
IN THE APPROVED VEGETATION MANAGEMENT PLAN. CONTRACTOR TO
n. STEEL REINFORCEMENT OF CONCRETE STRUCTURES ENSURE ALL TREE ROOTS AND STUMPS ARE COMPLETELY REMOVED AND
SUBJECT SITE
o. PRACTICAL COMPLETION BACKFILLED TO LEVEL 1 SUPERVISION. CONTRACTOR TO ALLOW TO MULCH
ALL CLEARED VEGETATION AND STOCKPILE ON SITE OR REMOVE FROM SITE
p. ON MAINTENANCE AS DIRECTED.
q. OFF MAINTENANCE 19. DRAWINGS TO BE READ IN CONJUNCTION WITH THE FOLLOWING
r. ANY OTHER INSPECTION AS SPECIFIED BY LOCAL COUNCIL (REFER CONSULTANTS/CONTRACTORS DRAWINGS:
DEVELOPMENT APPROVAL) SURVEYOR: MAX WATTERSON AND ASSOCIATES
s. ANY OTHER INSPECTION AS REQUIRED BY UNITY WATER AND WHERE ARCHITECT: PUSH PTY LTD
RELEVANT TO THEIR CERTIFICATION SCHEME
HYDRAULICS: TBA
STRUCTURAL: RECOR
GENERAL NOTES
LANDSCAPE: TBA
1. ALL DIMENSIONS SHOWN ARE IN METERS UNLESS OTHERWISE SHOWN.
20. CONTRACTOR TO PREPARE AND HAVE APPROVED BY RELEVANT AUTHORITY: 31/03/2022
2. ALL SETOUT ON SITE IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. ROAD OPENING PERMIT AND TRAFFIC MANAGEMENT PLAN FOR ALL WORKS
CONTRACTOR TO ALLOW FOR ALL MEANS NECESSARY TO ACCURATELY WITHIN COUNCIL ROAD RESERVES. CONTRACTOR TO ALLOW FOR ALL COSTS EA ID: 2557785
RPEQ: 26443
SETOUT THE WORKS. ASSOCIATED WITH IMPLEMENTATION OF THE TMP.
3. ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH PROJECT 21. ALL WORKS TO BE COMPLETED IN ACCORDANCE WITH ALL LOCAL DO NOT SCALE, IF IN DOUBT ASK!
SPECIFICATIONS AND WHERE FURTHER DETAILS ARE REQUIRED THE AUTHORITY APPROVALS RECEIVED FOR THE PROJECT LOCALITY PLAN
CONTRACTOR SHALL REFER TO NOOSA SHIRE COUNCIL DEVELOPMENT
GUIDELINES, LOCAL WATER AUTHORITY GUIDELINES, ASSOCIATED 22. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH OPW NOT TO SCALE
STANDARD DRAWINGS AND SPECIFICATIONS U.N.O. APPROVALS BY COUNCIL.
4. SHOULD ANY OF THE CONSTRUCTED WORKS BE CONSTRUCTED OUTSIDE OF 23. NO WORKS ARE TO BE UNDERTAKEN ON LAND OUTSIDE OF THE SITE
BOUNDARY WITHOUT FORMAL APPROVAL BY THE OWNER/CUSTODIAN OF
THE TOLERANCES SPECIFIED WITHIN THE PROJECT SPECIFICATION AND
LOCAL AUTHORITY REQUIREMENTS, THE CONTRACTOR WILL RECTIFY AT THAT LAND INCLUDING BUT NOT LIMITED TO PRIVATE PROPERTY, ROAD DRAWING SCHEDULE
THEIR COST INCLUSIVE OF ANY ADDITIONAL COSTS INCURRED BY RECOR. RESERVE, PARKS/OPENSPACE, EASEMENTS.
DRAWING
5. EXISTING SERVICES HAVE BEEN PLOTTED FROM SUPPLIED DATA AND AS 24. THE CONTRACTOR SHALL HAVE AN APPROVED SET OF CONSTRUCTION DRAWING TITLE REVISION
SUCH THEIR ACCURACY CANNOT BE GUARANTEED. NO RESPONSIBILITY IS DRAWINGS AND APPROVALS ON SITE AT ALL TIMES. NUMBER
28/03/22 MCU ISSUE
TAKEN BY RECOR OR THE PRINCIPAL FOR THE ACCURACY AND 25. ALL WATER AND SEWER RETICULATION WORKS TO BE CONSTRUCTED IN C01 COVER SHEET AND LOCALITY PLAN A A
Rev Date Description
JAC BRP
By Chk
COMPLETENESS OF THIS INFORMATION. IT IS THE RESPONSIBILITY OF THE ACCORDANCE WITH THE SEQ WATER SUPPLY AND SEWERAGE DESIGN AND
CONTRACTOR TO ACCURATELY ESTABLISH THE LOCATION AND LEVEL OF ALL CONSTRUCTION CODE (2013).
C10 EXISTING SITE SERVICES PLAN A
EXISTING SERVICES PRIOR THE COMMENCEMENT OF ANY WORKS. ANY
DISCREPANCIES SHALL BE REPORTED TO THE SUPERINTENDENT.
C20 EROSION AND SEDIMENT CONTROL A
CONTRACTOR TO LOCATE AND PROTECT SERVICES AS REQUIRED DURING PLAN AND DETAILS
PROPOSED WORKS.
C30 BULK EARTHWORKS PLAN A
6. THE CONTRACTOR IS TO CHECK THROUGH LOCATING, POTHOLING AND
SURVEY ALL CRITICAL CONNECTION POINTS FOR ALL CIVIL WORKS SHOWN C31 BULK EARTHWORKS SECTIONS A [email protected]
ON THE DRAWINGS INCLUDING ANY POTENTIAL EXISTING SERVICES CLASHES 37 MARY ST NOOSAVILLE, QLD
PRIOR TO COMMENCEMENT OF CIVIL WORKS. CONTRACTOR TO IMMEDIATELY C40 EXISTING STORMWATER CATCHMENT A
07 5211 1003
REPORT ANY DISCREPANCIES TO RECOR AND AWAIT FORMAL DIRECTION PLAN Client
PRIOR TO COMMENCING CIVIL WORKS.
C41 PROPOSED STORMWATER A MARK MELVILLE
7. ON COMPLETION OF SERVICES INSTALLATION, ALL DISTURBED AREAS SHALL
BE RESTORED TO ORIGINAL LEVEL, INCLUDING KERBS, FOOTPATHS, CATCHMENT PLAN Project Name
PROPOSED NDIS ACCOMODATION
CONCRETE AREAS, GRAVEL AREAS, GRASSED AREAS AND ROAD C50 ROADS AND DRAINAGE PLAN A 45 MAPLE ST
PAVEMENTS.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO
C51 DRIVEWAY SECTIONS A COOROY QLD 4563
AUTHORITY/COUNCIL'S INFRASTRUCTURE. SUCH REPAIR OR C52 ROADS AND DRAINAGE DETAILS A Title
REINSTATEMENT TO BE CARRIED OUT IMMEDIATELY TO THE SATISFACTION COVER SHEET AND LOCALITY PLAN
OF INFRASTRUCTURE OWNER/MANAGER / AUTHORITY/COUNCIL. C53 STORMWATER SECTIONS 1 A
9. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH ALL C54 STORMWATER SECTIONS 2 A
WORKPLACE HEALTH AND SAFETY REQUIREMENTS.
C60 SIGHT LINE LAYOUT AND SECTIONS A
C61 VEHICLE SWEPT PATHS PLAN A Project No.
20210153
Discipline
CIVIL
Status
APPROVAL
Designed By Drawn By Scale
(at
BRP JAC AS INDICATED A3)
Drawing No. Revision
C01 A
MCU
NOT FOR CONSTRUCTION
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (20210153 - Maple Street Civil Plans MCU.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.