MCU
NOT FOR CONSTRUCTION
LEGEND
E 0 - 0.5m CUT AREA
3
RP52184
3
E
A
E
11
RP112204 0.5 - 1.0m CUT AREA
9.
97
E
E
11
9.
97
E
1.0 - 1.5m CUT AREA
BEAM
B3
S120 ELEVATION
SCALE 1:50 H, 1:10 V
T
12 11
E
0.
4
EE
60 9.
97
RP112204
RP112204
11
9.
STR
9
115
7 1.5 - 2.0m CUT AREA
E
S
11
121
9.
97
6
S
E
11
11
9. E
C
97 E
E
S
7
11 S
S 2.0 - 2.5m CUT AREA
B
11 11
6.
MY
11 30 5.
66
S
S
9.
E
8
9
11 7
11
9. MH: SS
8
AL
6 LL:114.51
4
S
L
11
E
11
9.
9
11 7
9.
120
S
86
119
0 - 0.5m FILL AREA
PLE
D
12
0.
27 11
6.
30
S
MA
S
2
12
11 0.5 - 1.0m FILL AREA
9.
S
86
WM
11
S
9.
ST
59
11
9.
86
RE
S
11 1.0 - 1.5m FILL AREA
5.
66
ET
11
S
9. 11
66 6.
30
11
S
9.
90
115
4
S
11
11
E
11
6 9.
MH: 9. 11 86 EW SPOT HEIGHT
B
LL:120.69 6 6 H
S
C
2
IL:1 S water re
121
12
Unit
11 31/03/2022
19.3
11 6.
y
9.9 11 30 7
9. 11
5 by coSrds
2 38
123
3
EA ID: 2557785
RPEQ: 26443
RP99323
RP99323 19
C5605
123
11
8 DO NOT SCALE, IF IN DOUBT ASK!
11 19
S
9.
66
C5605
S
D A
S
11
CUT AREA = 931.4m3
11
119
9. 9.
92 66
11
9.
FILL AREA = 206.9m3
S
92
19
12
0 BALANCE = 724.5m3 CUT
S
C5605
C5605
1 A 28/03/22 MCU ISSUE JAC BRP
SP161937
SP161937 Rev Date Description By Chk
S
EARTHWORKS NOTES 8. ALL EARTHWORKS OPERATIONS SHALL BE CARRIED OUT WITH 'LEVEL 1' SOIL ENGINEERING TRACKS AND STOCKPILES AT A SUFFICIENT LEVEL TO SUPPRESS DUST GENERATION.
SUPERVISION IN ACCORDANCE WITH APPENDIX B OF AS 3798. THE NOMINATED GEOTECHNICAL ADDITIONALLY CONTRACTORS ARE TO COVER OR ENCLOSE STOCKPILES WHERE
1. FOR GENERAL NOTES REFER DWG C01, WHICH IS TO BE REQUESTED AND VIEWED PRIOR TO TESTING AUTHORITY SHALL PROVIDE CERTIFICATION THAT ALL GENERAL EARTHWORKS REASONABLY PRACTICAL TO RESTRICT DUST MOVEMENT.
COMMENCEMENT OF CONSTRUCTION IF NOT SUPPLIED. OPERATIONS HAVE BEEN CARRIED OUT IN ACCORDANCE WITH THE DRAWINGS AND 19. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON THIS DRAWING, THE [email protected]
2. GRASS AND TOPSOIL SHALL BE STRIPPED TO A MINIMUM DEPTH OF 100MM OVER THE EXTENT SPECIFICATIONS AND THE CONTROLLED FILL IS SUITABLE FOR PURPOSE WITH A MINIMUM CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE WRITTEN CONFIRMATION THAT WORKS CAN 37 MARY ST NOOSAVILLE, QLD
OF THE WORKS UNLESS DIRECTED OTHERWISE AND STOCKPILED FOR FUTURE USE AS 150KPA BEARING CAPACITY UNDER THE PLATFORM/STRUCTURES. COMMENCE. 07 5211 1003
NON-STRUCTURAL FILL IF REQUIRED, OR REMOVE FROM SITE. 9. ALL EARTHWORKS FILL AND EXCAVATED AREAS SHALL BE COMPACTED TO 98% STANDARD 20. ALL BATTERS TO BE KEYED/STEPPED INTO EXISTING MATERIAL AS DIRECTED BY Client
3. COMPACT THE EXPOSED SUBGRADE OR LOOSE TOP LEVEL MATERIAL TO A MINIMUM 98% MAXIMUM DRY DENSITY (AS 1289 5.1.1) IN LAYERS NOT EXCEEDING 150MM COMPACTED GEOTECHNICAL ENGINEER. CONTRACTOR TO ALLOW FOR ALL KEYING/STEPPING AS
STANDARD MAXIMUM DRY DENSITY TO AS1289 5.1.1. ANY 'SOFT SPOTS' IDENTIFIED BY THE MARK MELVILLE
THICKNESS. REQUIRED.
PROOF ROLLING SHALL BE REMOVED AND REPLACED WITH A COMPACTED IMPORTED 10. THE NOMINATED GEOTECHNICAL TESTING AUTHORITY SHALL PROVIDE CERTIFICATION THAT
Project Name
21. ALL TEMPORARY AND FINAL BATTER SLOPES ARE TO BE INSPECTED AND APPROVED BY PROPOSED NDIS ACCOMODATION
GENERAL FILL MATERIAL TO THE ABOVE COMPACTION REQUIREMENTS. ALL GENERAL EARTHWORKS OPERATIONS HAVE BEEN CARRIED OUT IN ACCORDANCE WITH GEOTECHNICAL ENGINEER. CERTIFICATION OF LONG TERM STABILITY TO BE PROVIDED BY
4. IMPORTED GENERAL FILL MATERIAL SHALL BE SUPPLIED AND COMPACTED WHERE THE DRAWINGS. GEOTECHNICAL ENGINEER PRIOR TO PRACTICAL COMPLETION.
45 MAPLE ST
NECESSARY TO OBTAIN SUBGRADE/PLATFORM LEVEL. IMPORTED GENERAL FILL MATERIAL 11. CONTRACTOR TO UNDERTAKE ALL EARTHWORKS TESTING TO COMPLY WITH THE PROJECT 22. CONTRACTOR'S RPEQ GEOTECHNICAL ENGINEER IS TO CONFIRM THAT ALL CONSTRUCTED
COOROY QLD 4563
SHALL BE CLEAN GRADED MATERIAL FREE OF ORGANIC MATTER AND STONES GREATER THAN SPECIFICATION AND LOCAL AUTHORITY REQUIREMENTS. CUT/FILL BATTERS AND RETAINING STRUCTURES ON THE SITE HAVE ACHIEVED ADEQUATE
150mm AND CAPABLE OF BEING COMPACTED INTO COHERENT FILLING TO THE SPECIFIED Title
12. FINISHED SURFACES TO ALL DISTURBED AREAS ARE TO BE TREATED IN ACCORDANCE WITH STABILITY WITH A LONG-TERM FACTOR OF SAFETY GREATER THAN OR EQUAL TO 1.5 AGAINST BULK EARTHWORKS PLAN
STANDARD. THE MATERIAL SHALL HAVE A LINEAR SHRINKAGE NOT GREATER THAN 8% AND A
LANDSCAPE DRAWINGS. GEOTECHNICAL FAILURES.
MINIMUM C.B.R. OF 10%.
13. FINISHED EARTHWORKS SURFACES TO BE STABILISED 23. EARTHWORKS LEVELS SHOWN ARE FINISHED SURFACE LEVELS INCLUSIVE OF TOPSOIL LAYER.
5. ANY PROPOSED RETAINING WALL WORKS MUST BE WHOLLY WITHIN THE PROPERTY
14. ALL EARTHWORKS TO BE CARRIED OUT AT +/- 2% OPTIMUM MOISTURE CONTENT. REFER TO STRUCTURAL ENGINEERING DRAWINGS FOR BUILDING SLAB THICKNESSES AND
BOUNDARY OF THE SUBJECT SITE, INCLUDING REAR OF RETAINING WALL DRAINAGE
15. ALL NEW WORKS TO MATCH NEATLY INTO EXISTING. HYDRAULIC DRAWINGS FOR SUB-FLOOR DRAINAGE FOR DETERMINATION OF REQUIRED BULK
INFRASTRUCTURE FOR RETAINING WALLS IN CUT.
EARTHWORKS SURFACE.
6. REFER ARCHITECT/LANDSCAPE ARCHITECT DRAWINGS FOR CONFIRMATION OF RETAINING 16. ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH APPROVED MANAGEMENT PLANS.
24. EARTHWORKS LEVELS SHOWN ARE FINISHED SURFACE LEVELS INCLUSIVE OF 100mm TOPSOIL Project No. Discipline Status
WALL COLOUR AND FINISH. 17. ADEQUATE SAFETY FENCING/BARRIERS TO BE APPLIED TO ALL BATTERS OR RETAINING WALLS 20210153 CIVIL APPROVAL
LAYER.
7. ALL RETAINING WALL STRUCTURAL DESIGN AND CONSTRUCTION CERTIFICATION BY (TEMPORARY OR PERMANENT) AS PER RELEVANT AUSTRALIAN STANDARDS AND LEGISLATION.
25. FOR DETAILED GEOTECHNICAL INFORMATION, REFER GEOTECHNICAL INVESTIGATION REPORT. Designed By Drawn By Scale
MANUFACTURER / INSTALLER. 18. DUST CONTROL MEASURES ARE TO INCLUDE SPRAYING WATER ON UNPAVED ROADS, ACCESS BRP JAC AS INDICATED A3)
(at
IT IS RECOMMENDED THAT THE GEOTECHNICAL CONSULTANT BE CONTACTED TO CONFIRM
THE SOIL CONDITIONS PRIOR TO EARTHWORKS COMMENCING. Drawing No. Revision
C30 A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (20210153 - Maple Street Civil Plans MCU.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.