Original source · versioned page text
CS-003 Schedule
PLANT SCHEDULE
GROUND FLOOR LOWER GROUND FLOOR
URBIS_A1.CTB
----
ELISE LIM
11.04.2023
FIRST FLOOR
\\file03.urbis.local\projects\PROJECTS\P0020000\P0025138_Sunrise Beach RAC\10_Construction Docs\4.02_CAD\Layouts\P0025138_000 CS.dwg
. . . . .
. . . . .
SUNRISE BEACH FOR CONSTRUCTION P0025138
SUNRISE BEACH .
05
.
FOR CONSTRUCTION
.
EL
.
SM
.
11.04.2023 .
04 FOR CONSTRUCTION SM SM 17.03.2023
FOR CONSTRUCTION 03 FOR CONSTRUCTION JM SM 10.10.2022
.
. 02 FOR TENDER JC SM 08.10.2021
. 01 FOR TENDER JC SM 04.10.2021
A DESIGN DEVELOPMENT 100% SM SB 08.10.2020
GLEN POWER SCHEDULE CS-003 05
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original