Attachment 2 - Draft Pomona Place Plan Survey Submissions and Consideration
No. Comment Consideration and Response
1. As the town has developed and grown over recent years exponentially, the following needs Noted. Acknowledge Action 2.5 Parking has an indicative timing of 6 plus years,
to be addressed earlier than your plan. however a quick win identified under this action is the preparation by Council of a
1/ Parking in the town and surrounds requires development of more parking urgently, not in Shire wide Carparking Management Plan which will provide a framework for
6-10 years, improved management of car parking in Pomona via the preparation of a Local
2/ Public transport including buses and trains requires increasing "now" including in Area parking Plan for Pomona. In addition improved wayfinding to access to
surrounding areas such as Cooran. existing parking in the village under Action 2.2 may improve access to parking in
the medium to short term.
Increasing public transport services is included in Advocacy Action 8 – Public
Transport Improvements. This has been strengthened to include trains as well as
buses.
Amend Plan:
Include frequency of trains as well as buses to Action A8 Public Transport
Improvements.
2. keep the trucks away from the town Heavy truck vehicles have been acknowledged with actions in the plan. These
include Action 2.3 Traffic calming on local roads and Advocacy Actions A2 Truck
Movements through town and A4 Pedestrian Crossings. However these have been
further reviewed to acknowledge the quarry trucks and provide clarity in response
to submissions received.
Amend Plan:
Edits throughout to emphasise and provide greater clarity, including:
1. Words added on p12: “particularly the movement of quarry trucks.”
2. Words added in 2.3 “We have consistently heard concerns about heavy
vehicles such as quarry trucks”
3. Words added in A2 Truck Movements through Town
4. Linkages to actions related to reducing Quarry truck impacts added in A2
“Action linkages: links to Actions 2.3 Traffic calming, A4 Pedestrian
crossings.”
5. Action linkage added in A4 Pedestrian Crossings “A2 truck movements
through town.”
3. I am sure there are things that will be thought of although I think what has even set out is a Noted.
great start
4. I understand a pedestrian crossing will be built opposite railway station which is great. Pedestrian crossing locations will need to be advocated for with TMR. This is
However this does NOT address the danger of crossing Factory street near Pomona covered by existing Advocacy Action A4 Pedestrian Crossings and mapping of
museum or Page's factory. This is where the problem is because the trucks going to and potential locations on Factory Street on page 43.
from Kin Kin travel at fair speed before or after passing the railway crossing. Very dangerous
and witnessed near miss with school kids crossing to west side of town. Please review this In light of community submissions, include a crossing at the entry to Cooroora
issue asap. Thank you Creek park on Hill Street.
Amend Plan:
Page 46. Add a crossing at the entry to Cooroora Creek park on Hill Street.
5. I think most suggestions are great. We definitely need restrictions on large quarry trucks Heavy truck vehicles have been acknowledged with actions in the plan and further
going through town as a priority. Not to mention improvements to public transport frequency. reviewed and acknowledged to provide clarity in response to submissions received.
These include Action 2.3 Traffic calming on local roads and Advocacy Actions A2
Truck Movements through town and A4 Pedestrian Crossings.
Increased frequency of service for public transport is also included in Advocacy
Action A8 Public transport improvements. This action has been amended to include
trains as well as busses.
1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 18 pages
Page 2
No. Comment Consideration and Response
Amend Plan:
Include frequency of trains as well as buses to Action A8.
6. A pedestrian crossing from railway to pub would be good and from railway to Vibe. Actions raised by the submission are covered by existing actions in the draft plan
A fenced off lead dog area please. including:
A playground for toddlers and crawlers in Stan Topper Park please. Action 1.8 More greenery in the village
A footpath that you can push pram and wheelchair on from town through bush to the Mt Action 1.11 Dog friendly spaces
Cooroora park area. Nice, connected walking spaces with trees for shade from town to the Action 1.12 Co-design park upgrade plans – Stan Topper park
current dog park - the current dog park is beautiful park and Stan Topper Park needs to be Action 1.13 Undertake improvements to key parks
made more Iike it please. Action 2.1 Dedicated cycle and walkways
Action 2.2 wayfinding and signage
Action 2.4 Streetscape upgrades
Advocacy Action A4 Pedestrian crossings
7. I hope the current dog park remains unfenced. People tend to show a lack of responsibility Noted. Place plan not proposing fenced dog parks as per councils current policy.
in fenced dog parks and also are more likely to bring untrained dogs who don’t follow
commands, making it unsafe for other dogs and children. The current dog park is excellent :)
8. 1. Regarding the plan to have more representations of Kabi Kabi history and Any future Kabi Kabi representation in the village will be undertaken in collaboration
heritage.....excellent idea, but it must also include a true and full history of displacement and with traditional owners.
subsequent deep disadvantage suffered by Kabi Kabi mob. A whitewash story is worse than
no story at all. The Pomona vision statement acknowledges the importance of local independent
2. Regarding promotion of new businesses in Pomona, is it possible for the Plan to exclude businesses and the Noosa Plan 2020 does not allow for drive through restaurants
multi-national fast food outlets? in Pomona.
9. Regarding Inter-connectivity: Interconnectivity between Pomona and other locations needs Increasing public transport services is included in Advocacy Action 8 – Public
urgent improvement to enhance mobility. This means advocacy for more frequent public Transport Improvements. This has been strengthened to include trains as well as
transport, particularly more frequent rail services to and from Brisbane (train services from buses.
Brisbane that arrive at Pomona mid-afternoon and early evening/late afternoon), more
frequent bus service to Noosa and Nambour (at least half-hourly).
There needs to be a community battery/ies to facilitate transition to renewable energy for Action 3.2 under Environmental conservation and sustainable living is about Local,
residents with solar. There needs to be local incentives for low-income residents & small clean energy and the potential investigations for a community battery would fall
businesses to access solar. under this action.
There needs to be a pro-active affordable rental & purchase, and social housing program, This is outside the scope of the Place Plan. The Noosa Housing Strategy – Keep
(e.g. Council-owned housing, especially for rental to key local workforce), and Council-led Noosa Home and the current Noosa Plan 2020 Amendments address affordable
land-use planning , incentives for granny-flats a tiny houses, and advocacy to other levels of housing issues for Noosa. This includes incentives for affordable housing as well as
government and private developers. a range of other options for increasing housing supply and housing choice across
Noosa Shire.
Council to assist community to acquire Page's Factory as an 'artisan'/creative and youth
activities hub. Pages Furniture is currently an existing operating business and is privately owned.
Should this situation change in the future Action 6.5 under Employment and small
business looks at opportunities for the site.
There is a lack of actions about Pomona's connections to other places (e.g. Noosa and its
other centres, the Sunshine & Fraser Coast, and/or Brisbane), and emerging trends (e.g. Noted. These broader issues are not the focus of a place plan, however, are
climate change, growing inter-generational gaps in housing accessibility, etc) considered as part of the broader strategic planning program for Noosa Shire.
Climate change and broader transport issues are covered in the Climate Change
Adaptation Plan and Transport Strategy respectively. There are number of actions
which do respond to these broader issues at a more local level including:
Action 1.15 a resilient community
Action 2.1 dedicated cycle and walkways
Action 2.2 Wayfinding and signage
Action 3.1 waterway protection
Action 3.2 Local, clean energy
2
Page 3
No. Comment Consideration and Response
Advocacy Action A3 Train station masterplan
Advocacy Action A5 land care and management
Advocacy Action A8 Public Transport improvements
10. I think the Pomona pool at the primary school should be open to the public. It is a great The use of the Pomona School Pool is covered in Advocacy Action A9 Swimming
asset that is not being used. It would be a great place to go for our young people. and Water Play.
Plenty of parking exists adjacent to the Railway Station with pedestrian access to the Main
Street. There is a large level area already there, it just needs gravel & signage.
Both these things are relatively cheap compared with building new infrastructure.
11. verry good Noted.
12. Train Station Masterplan could derail this plan needs urgent sorting Noted. This will be subject to negotiations with Transport and Main Roads (TMR)
and Queensland Rail (QR) as they have ownership and management of the land.
This is covered by Advocacy Action A3 Train station masterplan.
13. The community will grow… it’s inevitable… how does the council aim to protect the Noted. Pomona is not earmarked for significant growth in the future, however there
character and charm of the village but also promote small businesses to thrive? I hope it is still some capacity within the existing urban footprint for future housing in and
includes more density housing closer to town to promote walkable scale too, as opposed to nearby to the village within easy walking distance to the village. There is also
endless sprawl. Also, what’s the timeline for any action to be implemented? capacity for growth within the Local Centre zone for new businesses. Any new
development is to be undertaken in accordance with the Noosa Plan and the Local
Plan Code which includes character and built form provisions. The Noosa Plan also
includes heritage character areas and local heritage listed building which also
protect and retain the unique village character. A future character review will help
inform future amendments to the Noosa Plan 2020. Indicative timings for Actions in
the Place Plan are included under each Action in Plan and are short (1-3 years)
Medium 3-6 years) and Long (6 plus years) for implementation.
14. I think you have heard the community well. Safety on the roads is something which is a high Noted. Comments relate to existing Actions in the draft Plan including Actions A2
priority. The volume of heavy vehicles is not appropriate for such a small peaceful town. Truck Movements through town, A4 Pedestrian crossings and A8 Public Transport
More access to Brisbane transport via QRail would be good. There is currently only 2 improvements. There is an existing waste transfer station located on Pomona -Kin
services a day. Most services stop at Nambour. Given our distance from the Noosa resource Kin Road at Pomona.
centre it would be wonderful if we could still have an annual kerbside collection of hard
waste.
15. Reading the Plan was difficult. Extremely hard to decipher. Noted. Will review readability taking into consideration overall feedback from
submissions received through the engagement process.
Amend Plan:
Review general readability. Changes made to simplify and make layout more
consistent, add document wayfinding, Page 19 etc.
16. doesnt mention development issues.....ie the new High density living that is currently being Noted. Pomona has medium density and not high density residential zones. The
built is not in line with a country pomona vision......feels like the Council needs to align with current Noosa Plan 2020 has existing character and heritage provisions that need
the Plan as well?? to be considered with development. Council will consider strengthening future built
form, heritage and character provisions in a future amendment to the Noosa Plan
2020 as per Advocacy Action A1 Character and Heritage policy.
17. The list of actions is very long, hence I strongly suggest to introduce prioritisation. The The draft plan includes timeframes for implementation which prioritse actions into
following actions would be priorities for me: 2.3; 2.4; 1.1; 1.7; 1.12; 3.1; 3.2; 5.4; A2. short, medium and long term. These are in the implementation section in Part C of
the Draft Plan. Actions 1.7, 3.1, 5.4 and Advocacy action A2 are all earmarked for
I would like to qualify the following actions: 2.4: include Mountain Street; 1.1: Ensure the implementation in the next 1-2 years. Other actions listed are medium term with the
Mountain Street entry is included. Despite the new 50km sign, people still race down the exception of 2.4 which has a longer timeframe of 6 plus years, however a quick win
street ignoring the signage. Presumably they are not aware that they are in a residential for this action is likely with grant funding being received for some missing links
environment. between the High School and the village which will improve safety in the short term,
Re 1.12: we need more dog friendly walks, not just parks or areas. With the transformation whilst funding is sought for the longer term footpath improvements. The listed
of Forests into National Parks a lot of walking trails for dog owners are lost - for no reason. If priorities for all actions in the plan are indicative and could be brought forward
Council is not prepared to take that issue up with QPWS they need to create other trails. subject to funding.
3
Page 4
No. Comment Consideration and Response
Action 1.1 – the location of entry statements will be determined in consultation with
the community. Action 2.3 includes a quick win action for traffic calming in Mountain
Street. Action 2.4 includes priority streets which were determined by the community
as part of community consultation. Overtime other key streets can be identified
based on community priority. Action 1.11 does not preclude looking at dog friendly
walks/trails as these can occur in open spaces as well.
18. Action Number 1.3, existing street seating is not fit for purpose for older people, eg,: no The majority of issues raised can be addressed as part of an existing actions in the
armrest, dark colour (hard to see at night) and too low to the ground. plan. For example existing street furniture design can be reviewed as part of the
Action Number 1.5, There needs to be a Council Footpath and Footpath Trading Policies design process for new street furniture to ensure its fit for purpose under Actions
first. Priority use of footpaths should be given to pedestrians first. Currently in the business 1.2 and 1.3. Likewise under Action 2.4 Streetscape upgrades can include the
arears there is no regulation of footpath trading, Basking and signage making it had for older location of street tree plantings as well as compliance with regulations for footpath
people and handicapped to navigate. Also, planting of street footpaths is ad hoc, a lot of the trading to prioritise pedestrians. Locations for busking could also be considered to
street footpaths are useless to pedestrians, they have to use the road. provide a wholistic review of how the footpath area is used and managed in the
Action Number 1.8. The Skatepark in Pomona is a source of supply of drugs to minors, future.
there needs to be security cameras install in this area.
Action Number 1.14, The Market needs to be moved out of the town center. What is the Install CCTV cameras around the village was identified as part of the community
point in making improvements to Stan Topper Park when Cars are allowed to drive on this consultation, however was not voted as a priority action for the community. It is
area (when very wet) damaging the grassed area. (again no regulation). the toilet amenities included in Appendix B.
are some of the worse on the Sunshine Coast (disgusting).
Action Number 1.16 , There needs to be a larger area than the AFL ground. What about The relocation of the market can be considered in context with upgrading Stan
Cricket? What about Pickleball? What about NRL. We share Netball and NRL with Cooran. Topper Park under Action 1.12.
It would be good if all the Clubs in Pomona to develop one overall club (Sports Club), one The upgrade of the toilets in Stan Topper Park have been identified in the Local
club house and board of administration (as happens in some areas of the NT. Government Infrastructure Plan in the Noosa Plan 2020 and this can also be
Action Number 4.1 and 4.3, There are problems with Community Organisations in Pomona reviewed as part of Action 1.12 Co-design park upgrade – Stan Topper Park and
getting volunteers. One reason, the is a current group of people in the town run the town, Action 1.13 Undertake improvements to key parks.
they are only interested in being in control and keeping control. Yes , they all want
volunteers to do the work, no feedback, no comments and no applying for any committee Action 1.16 relates to the upgrading of existing Sporting facilities so this would look
positions. The Noosa Council and Councilors go a long way to facilitate these groups. eg, at all facilities in town. Council is currently reviewing the Noosa Sport and
only accepting onto community discussion groups who belong to an association ( current Recreation Plan which will include reviewing the demand and needs of for sporting
Botanical Gardens advisory group). Some of these Association have only a few more facilitate and activities within the hinterland areas including Pomona. This will also
members than the requirement of seven needed to be and association. Also, committee go be considered as part of the review of the Local Government Infrastructure plan.
unchanged for years. Community individuals can and should be allowed to contribute to
these groups without being associated with a group or association. This is a Democracy, Noted and council currently reviewing community engagement to ensure
each individual has the same rights. representative approaches. Also the potential of a Town Team for Pomona is
Action Number 5.1, First, regulate busking. Currently busking is happening in Memorial Av inclusive and open to everyone so this can be investigated by community to enable
every Saturday, they bring there own chairs and block up the footpaths, unregulated levels a more flexible volunteering option should they wish.
of noise, making it hard to talk, use the Telstra phone box or take call from your mobile
phone. Council has Busking requirements, this is not being regulated in Pomona. The Noted. Suitable Busking locations can also be reviewed and referenced as part of
Memorial Hall is under used for live music. Part reason is who controls the hall committee. Action 2.4 Streetscape upgrades working with key stakeholders who use the space
The management of the hall should be taken over by the Council. Again, certain people run and how this is managed to ensure it suits all needs.
the town.
Action Number 5.3, Who pays for the upkeep. There are already issues with upkeep of Council currently preparing a Public Art Policy which will consider longer term
artwork in Towns like Bowen. What happen with Pomona being an example of a Heritage maintenance and upkeep for public art. Art on private land is to be managed by the
Town? A lot of small towns are now doing this, what is Pomona's point of difference? land owner. There are actions in the plan related to promoting the Heritage
Character of Pomona.
Action Number 2.3 Please, no traffic calming, reduce speed and regulation. Noted, however this was a priority action for the community through the
engagement process. Traffic calming includes consideration of reducing speeds
Action Number 2.5, Purchase the land from Pages and turn into parking area. This is ideal etc,
for use by worker of the town and events. With improved pathways and crossovers on Pages Furniture is still an operating business and Action 6.5 will consider future
Factory St, it is ideal location. options should this no longer be the case.
Amend Plan:
4
Page 5
No. Comment Consideration and Response
Amend Action 1.12 - Develop a plan and undertake a program of
improvements to Stan Topper Park over time. Possible improvements include
a sound cone/stage, consideration of a new playground and other popular
uses in the park including the market location. “
Amend action 2.4 to include a review of all users of the footpath areas to
ensure safe usage for all users in the future.
19. I strongly agree that heavy trucks from the quarry need to be limited and re routed around Noted. Heavy truck vehicles have been acknowledged with actions in the plan and
the village. further reviewed and acknowledged to provide clarity in response to submissions
I strongly agree in residential housing development restrictions within Pomona. I think the received. These include Action 2.3 Traffic calming on local roads and Advocacy
town needs to keep the asthetics and heritage strong and not over populate the town. Actions A2 Truck Movements through town and A4 Pedestrian Crossings. Housing
I strongly agree that there needs to be better connecting infrastructure between both sides and development is dealt with via the Noosa Plan 2020. The importance of
of town. character and amenity has been recognised by the community including the
Pomona is wonderful town that needs to be cherish, not destroyed! following actions in the plan.
Action 1.9 Heritage walk
Action 1.10 Character and heritage appreciation
Advocacy Action A1 Character and heritage policy
20. More ideas for housing, ie tiny homes, plus encouraging farm/ country businesses, ie farm Noted. Comments relate to Housing and development which is dealt with via the
stores, farm stays. Noosa Plan 2020 as well as Action 6.2 Diverse shops and services.
21. Please prioritise a swimming / water play space for families in the heat as well as Noted. Comments relate to existing Actions 1.8 More greenery in the village,1.9
playgrounds / better skate park Heritage walk, 1.13 undertake improvements to key parks, 1.14 Skatepark
improvements and Advocacy Action A9 Swimming and water play.
22. Please act on the feedback from the community and include the Kin Kin Quarry and There are a number of actions which relate to heavy vehicle movements and traffic
associated traffic and dust issues, effect on the noosa trails, country drive, cycling, safety in the plan. This could be reviewed and strengthened to provide further
Horseriding etc clarity including highlighting the linkages between actions which relate to issues
form heavy truck movements and acknowledging the Quarry trucks throughout the
plan.
Amend Plan:
Edits throughout to emphasise and provide greater clarity, including:
1. Words added on p12: “particularly the movement of quarry trucks.”
2. Words added in 2.3 “We have consistently heard concerns about
heavy vehicles such as quarry trucks”
3. Words added in A2 Truck Movements through Town
4. Linkages to actions related to reducing Quarry truck impacts
added in A2 “Action linkages: links to Actions 2.3 Traffic calming,
A4 Pedestrian crossings.”
5. Action linkage added in A4 Pedestrian Crossings “A2 truck
movements through town.”
23. Physical activities are important, so safe walking areas are a really valid. Noted. There are related to existing actions in the draft plan including:
Action 1.16 Upgrading sporting facilities
Action 2.1 Dedicated cycle and walkways
Action 2.2 Wayfinding and signage
Action 2.3 Traffic calming on local roads
24. There are three things I would add. Two that were touched on. First, the wellbeing centre for Amend Action 4.2 Health and wellbeing hub to strengthen the concept of a Health
assessment, prevention, and ongoing oversight and plan for cradle through age healthcare. Hub to cater for all ages to given ageing population and investigate potential for a
Believe essential with our aging population. Facilities that can be used throughout the year physical facility over the longer timeframe.
no matter the weather. A sound system for music and movement, weight trading for strong
bones, good floors for backs, mirrors for correct form. Attached to a medical clinic ideal. The
Noosa Leisure Centre a part of an example there are others. Would also supply local jobs.
5
Page 6
No. Comment Consideration and Response
Next combines subjects, a welcome branding with art, First Nation values and the Pomona These ideas can be considered as part of existing actions on the Draft Plan
name. Both with the meaning of caring for nature. A sculpture of towns namesake Pomona. including:
Not only represents abundance but for protection and care of gardens. Placed to welcome at Action 1.1 Design entry statements unique to Pomona
the entryway to town, across from the historic Majestic. By the railway add attractive Action 1.7 Kabi Kabi signage
sustainable solar parking, roomy, with seats in shade for respite and further bringing the Action 3.2 Local, clean energy
town together. Action 5.3 Public art
Advocacy Action A3 train station masterplan
Last, would think possibly low hanging fruit, that’s being done elsewhere for fire prevention
not just for Pomona but also for Noosa Shire. Slow, low burn plantings surrounding and Fire retardant panting is very complex and still is dependent on a number of
throughout town. Encouraging residents to plant as well with instructions and low cost plants variables for efficacy. There is evidence of rainforest vegetation being less fire
grown locally. Become the part of fire prevention. prone however this all still depends on variable weather conditions, rainfall, slope,
fuel load and wind. A more practical approach is through bushfire prevention
planning and management practices that are currently being promoted and
embedded into community.
The Noosa Local Disaster Management Group (LDMG) has endorsed a new
template for the Pomona Disaster Management Plan. This is led by Noosa
Council’s Disaster Management Team and includes representation from all
emergency services and the community. The sub-group continues to meet
quarterly.
Action A5 Land care and Management also includes advocating for traditional
techniques for bush management which reduces fuel loads.
Amend Plan:
Amend Action 4.2 to cater for all ages and to include investigations and
feasibility for a potential physical facility over the longer timeframe.
Amend Action 1.15 to include bushfire prevention and have an early win to
encourage residents undertake personal bushfire planning as well as
upskilling community to become informed about emergency responses in
community. Eg evacuation locations etc.
25. I marked it somewhat agree because there is always room for improvement, but so far so, Noted.
so good.
26. 1.11 Dog friendly spaces - sounds great if all dog owners were in control of their pet/s but Noted. Include in Action 1.11Dog Friendly spaces to include a quick win about
they aren’t. Why can’t ALL dog friendly spaces require dogs ON leashes. Cooroora Creek education of good dog behaviour in open spaces to ensure enjoyment for all users.
Park should be reinstated as a dogs ON leash park. I have lived in Pomona for over 30 Cooroora Creek park is a dog off leash area, however there are requirements that
years and used to enjoy regular walks in the park until it became a dogs OFF leash area. On dogs should always be under the control of their owners. This can be monitored
numerous occasions I have had uncontrolled/unsupervised dogs bounding up to me and overtime for any need for changes.
what appears to be an expectation by some owners that I be comfortable with this. I am not
scared of dogs but it can be confronting when a large (or small) dog that I don’t know is Amend Plan:
racing towards me and then leaping at me. Some owners have the attitude “well it is a dog Amend Action 1.11 to include an early win to undertake good dog behaviour
park”. It is not a dog park it is a park for ALL of the community to enjoy dog owner or not. in open spaces.
The park should return to dogs ON a leash. For dogs OFF leash there should be a separate
fenced area to contain them and not disturb others who are there to enjoy a walk around the
park. Otherwise I think the Place Plan looks great and has been a good opportunity for
community to have a say. Thank you.
27. I don’t think we really need any money spent on indigenous cultural education. I believe Noted. Action 1.7 Kabi Kabi Signage is an action identified by the community and
people who are interested will naturally seek this out with their own means. I know they further supported as a priority action by the community throughout the engagement
make up a larger percentage apparently compared to other areas but they are still a minute process.
percentage. I think money is better spent on creating positive changes for the majority of the
community.
6
Page 7
No. Comment Consideration and Response
28. No mention of completing footpath/bike way connection from Song Bird estate to village. Noted. This can be identified on the map of Actions by extending the “Dedicated
cycle and walkway linkages” through to Songbird Estate.
Amend Plan:
Extend connection on Map of actions through to Songbird estate.
29. The Kin Kin quarry issue is the major concern and the draft plan offers no deliverables. There are a number of actions which relate to heavy vehicle movements and traffic
Nothing in the draft plan gives affected residents any confidence that Council are going to safety in the plan. This could be reviewed and strengthened to provide further
address this major issue further. clarity and linkages.
Amend Plan:
Edits throughout to emphasise and provide greater clarity, including:
1. Words added on p12: “particularly the movement of quarry trucks.”
2. Words added in 2.3 “We have consistently heard concerns about
heavy vehicles such as quarry trucks”
3. Words added in A2 Truck Movements through Town
4. Linkages to actions related to reducing Quarry truck impacts added in
A2 “Action linkages: links to Actions 2.3 Traffic calming, A4
Pedestrian crossings.”
5. Action linkage added in A4 Pedestrian Crossings “A2 truck
movements through town.”
30. Pomona is my closest town for any services, Thus I feel that the services provided in the The plan includes Action A10 Free WiFi in the village however better
town need to reflect the needs of the Whole community. especially- Easy, reliable, frequent, telecommunications and internet coverage in the broader locality was not identified
cost effective transport; Maintaining and supporting a fully Holistic Wellness Health Hub as an action from community via the community engagement. This can be added to
sooner, as the average age of the community increases, its need for an established hub will the actions in Appendix B to ensure its captured for future reference.
be essential. I feel that one key area missing is reliable telecommunications for the Pomona The health hub and frequency of public transport are addressed with existing
region - currently not reliable for online business. Pomona town centre may be ok but the actions in the draft plan under Action 4.2 and Advocacy Action A8 respectively.
rest of us have to deal with the ongoing regular disruptions. Communication is an essential
service, especially for regional business, services delivery, social connections and in Amend Plan:
emergency situations (eg flooding fire storm) keeping communication lines open - Currently Include Improve telecommunications and internet coverage throughout the
from past experience indicators is non existent (in my area) maybe beyond the central hub broader Pomona locality hinterland as an action in Appendix B – Employment
this is an issue. and Small Business theme.
31. No medium or high density residential areas Noted. There are no high density residential zones identified in Pomona under
Noosa Plan 2020. There are pockets of existing medium density residential zone
land within the village which have been identified as such from earlier planning
schemes. The rezoning of land is a consideration for the Noosa Plan 2020 via a
separate amendment process.
32. Yes, the dangers of the truck movements through Pomona Township have not been There are a number of actions which relate to heavy vehicle movements and traffic
addressed. This is a major concern to many local users and residents of Pomona, and the safety in the plan. This could be reviewed and strengthened to provide further
draft does not reflect how important this issue is. Trucks should be banned completely from clarity.
town, or at the very least banned on Saturdays.
The speed limit through Yurol Forest Drive should be lowered to 90 to help protect koalas. Amend Plan:
The railway crossing where Reserve St and Factory St converge needs safety Edits throughout to emphasise and provide greater clarity, including:
improvements for pedestrians. My friend "Twigs", who is in her 80's tripped there and broke 1. Words added on p12: “particularly the movement of quarry trucks.”
her hip. 2. Words added in 2.3 “We have consistently heard concerns about
heavy vehicles such as quarry trucks”
3. Words added in A2 Truck Movements through Town
4. Linkages to actions related to reducing Quarry truck impacts added in
A2 “Action linkages: links to Actions 2.3 Traffic calming, A4
Pedestrian crossings.”
5. Action linkage added in A4 Pedestrian Crossings “A2 truck
movements through town.”
7
Page 8
No. Comment Consideration and Response
33. Parking space issues (lack of) Noted. This is considered under Action 2.5 Parking in the Plan.
34. This place plan is looking good, I was concerned about developments that would change the Acknowledge comments in relation to town character and heritage as well as
natural and heritage nature of the town or the size of the town infrastructure or population. lighting and the importance of wildlife and dark skies and community resilience.
It appears you have heard concerns about this as well as the strong desire for community
resilience. Natural space and wildlife issue are noted, please be careful with increased
lighting, dark spaces are very important ar night for wildlife.
I am very concerned that the main threat to this town is the ongoing, or expansion, of the Kin There are a number of actions that relate to heavy vehicle movement throughout
Kin Quarry and the presence of heavy vehicles in the town or surrounding areas. the draft Plan and these could be strengthened to provide further clarity. The
Despite this being a constant theme throughout the community consultation, it appears to Advocacy Actions are not listed in any order of priority and the location in the draft
have been given the lowest ranking to be addressed, an advocacy role only and not even a plan does not diminish the relevance and importance of the action.
serious one. Other advocacy proposals use words like 'strongly advocate' or have greater
indicative costs associated with it. Addressing the issue of the Kin Kin Quarry appears to be Given the recent court determination, Council has also committed to continuing
as important as free Wi fi - nice to have but kind of irrelevant. monitoring issues in relation to heavy vehicle movements and this be included in
I do acknowledge the actions taken by council to date on this issue, but the court case now the Advocacy Action A2.
appears to be causing more problems than it is solving (Quarry management appear to have
a free reign to act however they choose now). Amend Plan:
Just like the court case however, this draft Place Plan is seriously omitting many things that Edits throughout to emphasise and provide greater clarity, including:
are directly in the council's power to implement such as weight limits on local roads, 1. Words added on p12: “particularly the movement of quarry trucks.”
enforcement of the QMP, independent Haulage route assessments, Independent noise and 2. Words added in 2.3 “We have consistently heard concerns about
dust monitoring, regular meetings with key stakeholders, higher funding for advocacy with heavy vehicles such as quarry trucks”
agencies like TMR and QPS, and much more. 3. Words added in A2 Truck Movements through Town
This issue is the main threat to the amenity of the town and should be high on the list of 4. Linkages to actions related to reducing Quarry truck impacts
actions in the Place Plan. It is alarming and upsetting that this does not appear to be a added in A2 “Action linkages: links to Actions 2.3 Traffic calming,
priority.
A4 Pedestrian crossings.”
Otherwise, thankyou.
5. Action linkage added in A4 Pedestrian Crossings “A2 truck
movements through town.”
35. The vision is missing the word character. I believe this is important and distinct to heritage or Acknowledge comments received about the vision statement which has received
village charm. overwhelming support from the community. Adding the word “character” to the
The Kin Kin Quarry is missing from the plan. Numerous actions could be included to help vision statement is supported .
mitigate the impacts, especially deliverable actions. There is not one deliverable action in
the plan to mitigate the very real and immediate impacts, despite numerous submissions. There are a number of actions that relate to heavy vehicle movements throughout
A role to deliver a swimming pool is missing. The plan only commits to investigating. In fact, the draft Plan and these could be strengthened to provide further clarity.
the plan is missing commitments to deliver in many aspects of the plan. I was surprised to
see so many facilitate and advocacy actions. Also many of the delivery actions are only This is a plan to be delivered in partnership with the community. Not all actions will
exploratory in nature. It seems many more plans will be needed to action the items in the be delivered by Council, and each action includes council’s role in the
Place Plan. implementation. The priority actions in the plan help identify key areas for future
direction and implementation over set timeframes to enable the sustainable delivery
and implementation of the plan. This ensures forward planning and implementation
can occur when funding opportunities arise and provides direction for capital
investment for council. Some actions do need further investigation to ensure
decisions are made with all the necessary information and in consultation with the
community. Where council has direct responsibility or is a lead, these actions will
be incorporated into internal operational and capital works plans to ensure delivery
within the allocated timeframes subject to resources. Other Advocacy actions are
related to assets not under council control and or ownership and therefore required
advocacy with other stakeholders such as the State Government.
Amend Plan:
Amend visions to include the wording “heritage, character and village
charm”
8
Page 9
No. Comment Consideration and Response
Edits throughout to emphasise and provide greater clarity, including:
1. Words added on p12: “particularly the movement of quarry trucks.”
2. Words added in 2.3 “We have consistently heard concerns about
heavy vehicles such as quarry trucks”
3. Words added in A2 Truck Movements through Town
4. Linkages to actions related to reducing Quarry truck impacts added in
A2 “Action linkages: links to Actions 2.3 Traffic calming, A4
Pedestrian crossings.”
5. Action linkage added in A4 Pedestrian Crossings “A2 truck
movements through town.”
36. •There were no actual actions implemented in regards to the Kin Kin Quarry, please refer to There are a number of actions that relate to heavy vehicle movements throughout
Save Noosa Hinterlands previous submissions to adequately provide much needed actions the draft Plan and these could be strengthened to provide further clarity. Given the
through town, not just advocacy, also round tables should be reinstated for the quarry, there recent court determination, Council has also committed to continuing monitoring
has not been enough advocacy at all in this regard issues in relation to heavy vehicle movements and this be included in the Advocacy
•Absolutely No Community Batteries or Electric Vehicle charging stations should be in Action A2.
Pomona
Factory St should remain as a services and industry zone and not gentrified to allow more Issues raised in relation to the priority actions in the draft plan are noted and can be
cafes, etc. Our Mechanic and Auto electrician and other services are much more valuable considered through the implementation process and ongoing review of the place
cafes etc. plan should community priorities change overtime.
•I believe that the maintenance and upkeep of the Lawson Shed and Community Hall were
overlooked, These are both valuable places for the community, the Lawson Shed Consideration of Interim KPIs to measure implementation of actions over the life of
specifically needs a deep clean and many maintenance problems fixed, IE security system the plan may also be beneficial and can be included in a separate Implementation
has been down for over a year, there is rot in the window sills, the gas oven needs replacing plan.
and not with an electric one, if the power is out we still need to be able to cook, potentially
even get a gas hot water system for emergency situations etc Other issues raised are noted and the majority will be resolved as part of the
• Absolutely no paid parking in Pomona delivery of other actions in the plan once these actions are undertaken. Others are
• No expansion to the local centre zone codes not within the scope of the draft placemaking plan with some related to the
• respect the quite surrounds of Pomona especially in regards to entertainment and also Planning Scheme in terms of land use planning and heritage protections which are
lighting, especially on our residents and wildlife sperate processes along with ongoing maintenance of community buildings.
• More pathways need to be outlined with difinitive timelines on delivery i.e council will
produce X km of pathways in 1-2years as well as zebra or wombat crossings to slow down Amend Plan:
all traffic Edits throughout to emphasise and provide greater clarity, including:
• We do not need new art centres or museums in Pomona as both are already very well 1. Words added on p12: “particularly the movement of quarry trucks.”
attended and are loved as is locally 2. Words added in 2.3 “We have consistently heard concerns about
• when planting trees make sure it doesn't interfere with residents views of Mt Cooroora heavy vehicles such as quarry trucks”
• The community Hall needs to have Air conditioning installed 3. Words added in A2 Truck Movements through Town
•the town of Pomona needs stronger definition to heritage and character and a much larger 4. Linkages to actions related to reducing Quarry truck impacts added in
area to be included into the heritage zone as many homes, streets and trees where A2 “Action linkages: links to Actions 2.3 Traffic calming, A4
completely left out of the mapping
Pedestrian crossings.”
• A splash park is not equitable to all ages, the hinterland needs an appropriate pool for all,
5. Action linkage added in A4 Pedestrian Crossings “A2 truck
Cooroy has a splash park already
•Any and all 'Street Scape' should be kept in the look and feel of Pomona i.e. trees and movements through town.”
nature, the pictures provided are ridiculous and looked as if they were suited for Brisbane,
Leave Pomonas look and feel as it is. Include statement about council continuing to monitor issues regarding
• Rezone all medium-density lots in Pomona back to low-density heavy truck movements. In Advocacy Action A2.
• An electronic sign above the subway is not going to stop people from driving through flood
waters, there needs to be a physical barrier as many people drive through flood waters Included more information in Part C Implementation of the plan and the
when the barrier is not up preparation of a separate staged implementation plan with performance
• No affordable housing in Pomona indicators where suitable.
• Absolutely No CCTV in Pomona
9
Page 10
Responses and consideration to Individual Submissions
No. Comment Consideration and Response
37. There is plenty of car parking spaces available adjacent to the station with safe Issues raised are coved by Actions 2.5 – Parking , Action A3 Train
access to Main Street via pedestrian crossing, why can we not use this space to Station master plan and Action A9 Swimming and Water Play.
alleviate congestion? Secondly we have a perfectly good swimming pool at the
Primary School which would be perfect for everyone to enjoy, great for our younger
folk as well but we’re unable to use it. Surely there must be away council can work
with EQ to get this facility open again.
38. • Accommodation options for visitors Majority of Issues raised covered by Actions in the draft plan under the
• Pages Factory street scape - this is such a barren and ugly eyesore once following:
you cross the railway line from the township and whilst it has a history, it is Action 6.5 Pages furniture/Factory street site
in desperate need of a revamp with treescaping as a minimum. Action 1.8 More greenery in the village
• Swimming pool access - needs to reopen Advocacy Action A9 Swimming and water play
• Truck movements through the township - the ongoing issue of the Kin Kin Advocacy Action A2 truck movements through town.
quarry continues to affect Noosa Hinterland in the negative.
Accommodation for visitors was also raised and support this being
included in the Actions in Appendix B. This will ensure that its is captured
for inclusion as part of the future review of all actions.
Amend Plan:
Add Accommodation options for visitors as an action in in
Appendix B – employment and small business theme.
Edits throughout to emphasise and provide greater clarity,
including:
1. Words added on p12: “particularly the movement of quarry
trucks.”
2. Words added in 2.3 “We have consistently heard concerns
about heavy vehicles such as quarry trucks”
3. Words added in A2 Truck Movements through Town
4. Linkages to actions related to reducing Quarry truck impacts
added in A2 “Action linkages: links to Actions 2.3 Traffic
calming, A4 Pedestrian crossings.”
5. Action linkage added in A4 Pedestrian Crossings “A2 truck
movements through town.”
39. Pomona Commercial land for business park needed for future employment growth. The review of the SEQ Regional Plan included the addition of two sites at
Place plan is largely silent on development and strengthening the local economy. I 94 and 170 Holts Road, Cooroy, in the urban footprint for industrial to
call upon the council to examine this issue as it relates to Pomona specifically and support employment (industrial) land supply in the sub-region and
include within the final Place Plan document suitable wording and firm actions that broadly across SEQ . The combined lots have an overall site area of
would result in suitable land being identified (most probably outside the existing 33.78Ha and will provide land for future industry development up to 2051.
urban footprint) that may not be needed immediately, but which would be required It is expected that this land will provide for future industrial land supply for
in 10 years time. After all, the Pomona Place Plan purports to be a plan for the the Hinterland and more broadly across Noosa Shire. Can include
town’s future. Already there are a couple of enterprises in town that are looking for investigations for future commercial and industrial land for Pomona as an
alternative premises. They wish to stay within the town. In the past, several have action in Appendix B which will then be included as part of the review of
had to move out. Simply, there is no land locally to relocate to. Finding more the Place Plan in 5 years time and can be tested with the community.
industrial/commercial land at Pomona and zoning it accordingly should be a worthy
objective of the Pomona Placemaking Plan, consistent with the precepts of the Theme 6 relates to Employment and small business with a number of
Noosa Shire Economic Development Strategy 2021-30. actions that all contribute to strengthening the local economy. Additional
10
Page 11
Explore with the state government the repurposing of the under-utilised Pomona wording to Action 6.2 referencing current and future community needs
Courthouse as a small start-up desktop business hub, or as a place where state will help clarify and convey the need for a sustainable local economy.
government employees who travel from our area to Brisbane and the Sunshine
Coast to work could, instead, work from this hub – thereby adding diversity to the Action 6.3 Local start up support does not preclude consideration of
local workforce. utilising other buildings such as the Pomona Court House for new
businesses or a business hub. This will need to be negotiated with the
State Government as an option should the building be fit for purpose.
Amend Plan:
Add investigations for future commercial and industrial land for
Pomona as an action in Appendix B – Employment and Small
Business theme.
Amend Action 6.2 Diverse Shops and Services to include “Retain
the diverse mix of local shops and services to meet current and
future community needs.
Understand the mix of business and services desired for the town
what they will need into the future to maintain a sustainable local
economy. This may involve proactively seeking to attract missing
services.”
40. I speak of Council’s pro-active tree replacement program that was scheduled for the Action 1.8 More Greenery in the Village looks at developing a greening
Hinterland (inc. Pomona) in financial year 22-23 has not been delivered, and the strategy to increase green cover in the village with a focus on main
findings of the Pomona Place Plan were ‘more trees’ and ‘trees along pathways and streets and thoroughfares. The draft plan has an indicative timing of long
footpaths’ featured highly in the community responses. In its so-called ‘action plan’ term ( 6+ years) . A review of this timeframe has been considered, and
for placemaking, Noosa Council says it will: “Develop and implement a greening the timeframe can be reduced from Long term (6+ years) to Medium term
strategy to increase green cover in the village. This will identify locations and (3-5 years) subject to grant funding as part of council’s urban greening
approaches for more general tree planting, flowers, gardens and parklets utilising program.
local and endemic species, with a focus on main streets and key thoroughfares.”
The council proposes that this action will occur in the ‘long term’ (6-10 years from Amend Plan:
now). Amend the Timeframe for Action 1.8 More Greenery in the Village
How is it that a commitment for there to be a pro-active tree planting program for from long term to medium term.
Pomona in 2022-23 suddenly becomes an outcome that won’t be delivered until
2030 at the earliest? This is unacceptable. Timeframe for this action needs to be
brought forward.
41. A flagpole for the Pomona War Memorial and upgrade of Joe Bazzo Park. I have Consideration of a Flag Pole in Joe Bazzo Park is currently under
been engaged with Noosa Council about a flagpole for the Pomona War Memorial, consideration by Council.
on and off, for seven years now.
Another proposal that went forward to the placemaking team, but not reflected in
the draft document was that the green grass area immediately in front of PCH This would need to be considered with the Board of the Pomona
towards Memorial Avenue be filled in so that the upper and lower levels become Community House. Can include an action for Appendix B for improved
one level. This would result in better utilisation of Joe Bazzo Park around the war accessibility to community facilities.
memorial and in front of PCH. PCH has a ramp access for less mobile citizens and
is now the location of the town ‘library’ (a book cupboard �). A levelling of the two Amend Plan:
park areas would allow for PCH to be given greater prominence in the streetscape Add as an action to Appendix B Community Facilities - Improved
and would allow for its access ramp to be much shorter. accessibility to community facilities
42 Feedback on draft place plan:
• Lack of concrete deliverables - The actions lack concrete pathways to delivery, Agree that some KPIs are needed to monitor progress with
and the language used in the plan is vague when it comes to deliverables - ie implementation of Actions over the 5 year life of the plan. A more
using words like 'explore options' rather than actually providing commitments. detailed Implementation Plan will be prepared which will include KPIs for
Some concrete commitments would better form a plan of action. For example deliverable actions.
plant 200 street trees per year for 5 years
• The impact of the Kin Kin quarry and its truck movements was largely
understated, however this needs to be a higher priority to council. It is within
Council's power to further restrict truck movements per day, and I urge this
11
Page 12
issue to be addressed as a top priority before an accident takes place. This is a There are a number of actions that relate to the heavy vehicle
major safety risk to this town especially for residents on Hill St, Summit Road, movements, traffic and pedestrian safety and traffic calming in the draft
Pioneer Road - all which have inadequate pedestrian infrastructure. plan which all contribute to addressing the issues with truck movements,
• Footpath connectivity and pedestrian safety - This issue was raised in the Plan, including the quarry trucks form the Kin Kin Quarry. These can be
however we need a firm commitment to the delivery of these. This has already strengthened to provide further clarity.
been identified in the current planning scheme as a priority item, but apparently
it has been dismissed by Council as a low priority. Issues raised in relation to the actions in the draft plan are noted and can
• Budget commitments: The plan is great but it lacks another chapter on delivery be considered through the implementation process.
commitments and budget allocations. Please provide costings and budget
allocations or procurement methods (ie state funding applications). Otherwise it The plan includes a statement that cost estimates and delivery
is "easy to sell a dream" but who is going to fund this. timeframes are indicative only and subject to further investigation. The
• Partnership with QPWS on Cooroora summit track - This trail is in desperate order for commencement of actions is flexible and will be based on timing
need of maintenance and there lacks any action on this. Can a partnership be and availability of funding and resources, and community initiative.
made between Noosa Council and QPWS to better facilitate ongoing Actions identified with Council as the lead with a “delivery” role will be
maintenance? This trail is a major asset for Pomona, and a reason many investigated based on the indicative timeframe for the actions and
visitors come here, However the trail itself was overlooked in the Place Plan. through grant funding opportunities and the annual and long term budget
• Flood resilience - It has come to my attention that a flood resilience study for process to ensure that implementation is sustainable in the longer term.
Pomona was completed in 2014 by Noosa Council and the recommendations
have been not actioned. Please address this as a priority before we talk about Maintenance of State Government assets such as the Cooroora summit
"resilience" in the new Place Pl Track were not specifically mentioned in the draft Place Plan, however
• Pedestrian crossings - It was evident by the diagrams in the Place plan that this would be considered as part of Advocacy Action A5 Land care and
they were produced with limited knowledge of the town. The proposed locations management. Amend action A5 to include the wording “investment,
of pedestrian crossings were not ideal and need better consideration. Ie: The including maintenance” and….
Heavily used Cooroora Creek Park needs a pedestrian crossing on Hill St.
• Speed limits: The town should be limited to 50km/h (ideally 40) for the extents The Pomona Flood study is currently being updated with the Pomona
of the village. Ie this should extend along Hill St, Summit Road, Reserve St. Flood Risk assessment and mitigation plan. Any recommendations from
This would assist in noise reduction and safety for residents ( especially for this work will be able to be fed through to the Place Plan as it is reviewed
laiden quarry trucks) - The traffic calming devices in the Place Plan need and updated.
further refinement and perhaps a whole town speed limit and safety review
would be helpful. Hill street was identified as an additional location. Amend the Action Map
on page 43 to include this location.
Action 2.3 covers Traffic calming on local roads. Any additional speed
reductions will need to be considered with the Department of Transport
and Main Roads.
Amend Plan:
Edits throughout to emphasise and provide greater clarity,
including:
1. Words added on p12: “particularly the movement of quarry
trucks.”
2. Words added in 2.3 “We have consistently heard concerns
about heavy vehicles such as quarry trucks”
3. Words added in A2 Truck Movements through Town
4. Linkages to actions related to reducing Quarry truck impacts
added in A2 “Action linkages: links to Actions 2.3 Traffic
calming, A4 Pedestrian crossings.”
5. Action linkage added in A4 Pedestrian Crossings “A2 truck
movements through town.”
Included more information in Part C Implementation of the plan and
the preparation of a separate staged implementation plan with
performance indicators where suitable.
12
Page 13
Amend the Action map page 42 to include a potential crossing at
Hill Street near the entrance of the Cooroora Creek park.
Amend action A5 Land care and management - to include the
wording “investment, including maintenance” and….
43 EV charging stations
In addition to the comments expressed in my survey response, I have previously Acknowledge the concerns raised in the submissions. Action 3.2 Local
submitted to council on numerous occasions, including the walk around town, Clean Energy covers encouraging renewable energy projects, emission
conversations with staff and surveys, my disapproval of community batteries and reduction and green industries. Installation of EV charging stations is just
EV charging stations in Pomona to expand on this, I do not believe that either of used as an example of how the action can be achieved. This is one
these are in keeping with the town character, amenity, infrastructure and town option that could be considered by the community but there may be
values. Parking is an identified issue of Pomona and EV charging stations will take others that are of a higher priority. In any case it will be up to the
away much needed car parks from the wider community and reserve them purely community to provide the direction for this action.
for EVs. Very few residents in Pomona actually drive an EV. Please see my prior
responses and reflect in the draft plan.
44 Pages Furniture proposal for council Leisure Centre Consideration of the future of the Pages Furniture Factory will be
I wish to raise an idea I have developed in consultation with the Pomona ultimately up to the owner as it is a private business. Should the situation
Community. This is for the Pages Furnishing site. The site should be purchased by change Action 6.5 Pages Furniture/Factory Street site - will consider
council and converted into a leisure centre, providing pools (indoor and outdoor), future opportunities for the site.
hydrotherapy pool, gym, spa, sauna, recreation, basketball court etc. This could be
implemented across the three blocks. See photos below. Keeping the shell of the
building and respecting the heritage listing, the building could pay homage to the
Pages original building. Furthermore, it could be named the Pages Leisure Centre.
Funding could be sourced from the Olympic Games funding pool, the SEQ Council
of Mayors and other recreation funding sources. This idea hits multple actions in the
draft plan, wellness centre, recreation, swimming pool, Factory St activation, Pages
reactivation etc. I presented this at my recent community meeting with widespread
support including from the chamber of commerce. I wish it be included in the
options paper to be devised for the Pages site. Hopefully this can be included as an
action in the draft plan and we can work together to explore this option.
45 Kin Kin Quarry and other concerns There are a number of actions that relate to the heavy vehicle
• Lack of Action for a Key Community Theme The Engagement Summary Report movements, traffic and pedestrian safety and traffic calming in the draft
and Draft Plan both acknowledge the Kin Kin Quarry as a major community plan which all contribute to addressing the issues with truck movements,
concern and a key theme in the placemaking process. Numerous submissions including the quarry trucks from the Kin Kin Quarry. These could be
were made by the community and Save Noosa Hinterland in regard to this strengthened to provide further clarity throughout the Plan.
issue, yet the draft plan provides only a single action—" Continue to advocate
for restrictions on heavy vehicles driving through the village centre"—to address Reword A2 Truck Movements through Town to include as part of
the quarry’s significant and diverse impacts on Pomona. Not only is this the only advocacy that Council will continue to monitor the issues
action, but it is only an advocacy action. Furthermore, this sole advocacy action surrounding heavy vehicles.
is legally questionable and practically unachievable. The state government and
TMR have previously informed SNH and Noosa Council that they cannot
permanently implement heavy vehicle restrictions on their roads. As such this
action is worthless. This is a glaring oversight. While some of the actions we
have proposed in prior submissions involve advocacy or facilitation, many are
deliverable and fall directly within Council’s remit. The lack of actionable
measures altogether diminishes the plan's ability to address what is clearly one
of Pomona’s most pressing challenges. As a key theme of the plan, the quarry
and its impacts warrant a dedicated action page outlining specific measures.
• Save Noosa Hinterland: A Key Stakeholder Representing the Community Save
Noosa Hinterland is one of the largest not-for-profit community organisations on
the key stakeholder reference group, representing over 600 formal members
and thousands of residents impacted by the quarry. We have engaged
13
Page 14
extensively in the placemaking study, contributing through written submissions,
direct conversations with staff, participation in pop-up events, town walk-
arounds and key stakeholder workshops. The engagement summary recorded
many (though not all) of our concerns, yet these were not carried into the draft
plan. The absence of deliverable actions addressing the Kin Kin Quarry
contradicts the Council’s assurance that our feedback would be reflected in the
plan.
• Actionable Solutions: Deliverable vs. Advocacy Actions The draft plan’s sole
advocacy action is inadequate for addressing the wide ranging impacts of the
Kin Kin Quarry on the town of Pomona. Labelling the heavy vehicle issue as
"not implementable" under a place plan, while focusing solely on advocating for
state government restrictions, constitutes a straw man fallacy. This
misrepresents the broader scope of the problem and unfairly narrows the focus,
ignoring the numerous deliverable and actionable solutions proposed by Save A range of specific actions were included, some of which fall outside the
Noosa Hinterland and the community. Under the Place Plan framework, Council scope of the Place Plan, however the following can be considered under
has the capacity to implement numerous ‘delivery’ and ‘advocacy’ actions to a Action 2.3 including:
attempt to mitigate the numerous impacts of the Kin Kin Quarry. • Development of a Pomona Traffic Management Plan addressing
• Specific actions we want to see included are: truck and traffic movement.
o A dedicated action page in the plan for the Kin Kin Quarry (a key theme • Consider Bollards at key intersections eg outside cafes.
identified by the community).
o Safety risk assessments on all haulage routes, addressing impacts to
residents, businesses, pedestrians, tourists, and road users.
o Creation of a comprehensive Pomona Traffic Plan specifically addressing
quarry truck movements and their impacts on the town. There is currently no
traffic plan for Pomona.
o Weight limits on Council managed roads to manage heavy vehicle impacts
on infrastructure and public safety.
o Review and revocation of heavy vehicle permits for heavy vehicles on local
roads that do not meet the National Heavy Vehicle Regulator guidelines for
issuing permits.
o Safe crossings and pathways for pedestrians and cyclists along haulage
routes (not limited to Factory St).
o Bollards at key intersections eg outside cafes.
o Revised priority rankings for paths and crossings in the Cycling and
Walking Strategy, reflecting increased truck volumes and safety concerns.
Currently most works are so low they will not be implemented.
o Traffic calming measures, such as raised speed bumps and shared zones
in town. Redirection of quarry trucks to minimise disruption in key
community areas.
o Enforcement of the Quarry Management Plan (QMP) to ensure safe and
compliant operations.
o Enhanced Traffic Surveillance and Compliance Enforcement- Install traffic
surveillance cameras on main haulage routes to monitor compliance with
the QMP, speed lim Increased
o Police Presence During Peak Truck Traffic Times - coordinate with local
police for heightened enforcement and safety monitoring during peak quarry
truck times.
o Establish a Regular Air Quality Monitoring Program Install air quality
monitors along haulage routes and within Pomona to track dust and
particulate levels for health protection.
o Noise Monitoring and Reduction Strategies Conduct noise assessments at
impacted locations. Based on results, introduce noise reduction measures,
such as sound barriers or time restrictions on heavy vehicles.
14
Page 15
o Ongoing collaboration with Save Noosa Hinterland and key stakeholders to
keep the community’s interests at the forefront, including a permanent
council round table for the life of the quarry, combined with an assurance of Noted. Review the document to include references to Kin Kin Quarry and
regular meetings. the associated quarry truck movements to reflect the issues raised in the
• Addressing a Long-Term Issue with Long-Term Solutions The Kin Kin Quarry’s community engagement report. A number of the existing actions in the
operations are approved for another nine years. The impacts on Pomona’s plan reflect the issues raised by heavy vehicle movements such as traffic
infrastructure, safety, and amenity are severe and long-lasting. Any plan calming on roads, improving safety on State Roads eg pedestrian
designed to guide Pomona over the next 10-20 years must explicitly recognise crossings. Highlighting these linkages will also provide further clarity
and address this issue. Identifying the problem is the first step to resolving it. around theses issues.
The absence of the words Kin Kin Quarry and Kin Kin Quarry trucks from the
draft plan undermines the Council’s ability to effectively address the problem. Amend Plan:
We strongly recommend that these terms be explicitly included in the final plan Edits throughout to emphasise and provide greater clarity,
and that a dedicated action page be developed to outline actionable solutions. including:
1. Words added on p12: “particularly the movement of quarry
trucks.”
2. Words added in 2.3 “We have consistently heard concerns
about heavy vehicles such as quarry trucks”
3. Words added in A2 Truck Movements through Town
4. Linkages to actions related to reducing Quarry truck impacts
added in A2 “Action linkages: links to Actions 2.3 Traffic
calming, A4 Pedestrian crossings.”
5. Action linkage added in A4 Pedestrian Crossings “A2 truck
movements through town.”
Amend Action 2.3 Traffic Calming on local roads to include:
• Development of a Pomona Traffic Management Plan
addressing truck and traffic movement.
• Consider Bollards at key intersections eg outside cafes
46 Pomona is a beautiful place that will be destroyed forever if the Kin Kin quarry is Noted. Council has a range of strategies and plans that take a wholistic
allowed to expand it operations. We need to stop destroying our environment where approach to Sustainability, land management and Climate Change
we can. Other countries are warring about insane reasons and destroying land Adaptation and Mitigation to ensure the Shire is responding and planning
there. It maybe on the other side of the world but it is all on the same planet. This is for the future.
a global issue that we all need to be thought about and put into perspective. We
also need to stop developers clearing more land there is enough cleared land
already. Our climate is starting to tell us that we are heading for extinction.
47 You are hereby called upon to address the safety and social impacts posed by Kin There are a number of actions that relate to the heavy vehicle
Kin Quarry operations on our village of Pomona. The Place Maker Plan needs to movements, traffic and pedestrian safety and traffic calming in the draft
include deliverables that tangibly address the concerns raised by residents in this plan which all contribute to addressing the issues with truck movements,
regard, not just advocacy. including the quarry trucks from the Kin Kin Quarry. These linkages could
be highlighted to provide further clarity throughout the Plan.
Amend Plan:
Edits throughout to emphasise and provide greater clarity,
including:
1. Words added on p12: “particularly the movement of quarry
trucks.”
2. Words added in 2.3 “We have consistently heard concerns
about heavy vehicles such as quarry trucks”
3. Words added in A2 Truck Movements through Town
15
Page 16
4. Linkages to actions related to reducing Quarry truck impacts
added in A2 “Action linkages: links to Actions 2.3 Traffic
calming, A4 Pedestrian crossings.”
5. Action linkage added in A4 Pedestrian Crossings “A2 truck
movements through town.”
48 • The draft Pomona Place Plan is a timid document, lacking definition. I have read The Place plan is a plan that has been developed in partnership with the
it and ask myself: Do I understand from its content where Pomona will be in 10 community to identify the key values and vision for the village and identify
years time, the form the town will take and how it will function for the greater how it can be made a better place. Community feedback told us that the
good; will it be a ‘fit for purpose’ community? The answer is: I don’t know. community did not want to see big changes and the actions in the plan
The Pomona Place Plan has an uphill battle to maintain its impetus and integrity reflect this. The Place Plan will provide feedback into Council’s other
against all the competing pressures within the council, uncoordinated agendas, strategic planning documents such as the Planning Scheme,
paucity of grant funding etc. It is easy to see that once two or three placemaking Environmental Strategy, Economic Development Strategy and Capital
plans have been completed across Noosa Shire, the Pomona plan will languish works planning and budget process etc. These documents will help
and others will be brought to the fore. the Place Plan process it is setting up a provide strategic forward direction for Pomona in accordance with the
scenario whereby towns with completed Place Plans three or four years down community vision.
the track will be competing with each other for funding and resources. The timeframes allocated in the place plan for council led projects will
• In any future communications strategy around placemaking elsewhere, may I shape and provide strategic direction for the forward capital works
suggest the council be more active in taking residents on the journey, putting projects, operational plans and budget decisions into the future to ensure
out regular updates to avoid the ridiculous conspiracy theorists’ argument that that the Pomona Place plan and other plans to come can be delivered in
‘things are happening behind closed doors that they are not telling us’ etc. It is a strategic and sustainable way over the life of each plan.
important to maintain the integrity of the process and the final document – and
for that to be demonstrated, even if it is an effort to do so. Acknowledge that there were long waits between stages and these have
• There is no clear linear progression of actions from A to B to C and so on been valuable learnings for the pilot project.
towards a defined objective. The document lacks KPI’s (so there is no
accountability if the thing goes off the rails). For instance, a planning document Agree that some KPIs are needed to monitor progress with
normally would say something along these lines: implementation of Actions over the 5 year life of the plan. A more
o In 2034, when the Pomona Place Plan is finished, it will have resulted detailed Implementation Plan will be prepared which will include KPIs for
in: � An increase in Pomona’s Index of Relative Social Advantage and deliverable actions.
Disadvantage (IRSAD) score of 970 in 2021 back to the higher score of
2016;
o An extra 3km of shared pathways will have been constructed, providing
an active transport network for the town, including a critical pedestrian
crossing of Factory Street;
o Stan Topper Park would have been repurposed to become an activated
community space for markets, performance, passive and active
recreation – a village green;
• After being subject of an extensive consultation over almost 18 months – the
most extensive interaction of its type in more than a decade = Noosa Council is Comment noted. The place plan is a commitment to deliver the actions in
proposing ongoing and considerable further liaison, town teams interaction, partnership with the community. An implementation plan will also be
investigation etc. – a continuation of the gabfest. What’s required is action, not developed to help deliver those actions identified as short term in the
further words. An accumulation of unfulfilled promises to the people of Pomona plan. Pomona has many committed community orgnaisations and the
over 20 years must be addressed now. town team is one mechanism that could be considered to compliment
• What the draft plan will achieve is considerable administrative effort, with no these organisations and assist with the implementation. The creation of a
guarantee it will result in any appreciable difference to the liveability, enjoyment, Town Team will be decided by the community alone and not Council.
accomplishment and economic prosperity of the people of Pomona.
• The draft Pomona Place Plan is not a future visioning document. It seeks to Comment noted. The plan has been developed and delivered in
create the illusion that it is. For instance, the only reference to Pomona’s partnership with the community and there are a number of actions which
population is extrapolated from the 2021 Census – 2931 residents. That shows have been identified by community that will make a difference to their
it is a ‘here and now’ document and probably reflects the fact that the council enjoyment and livability of the town.
seeks to walk a fine line between those who want sensible and incremental The role of the place plan is to identify a vision and actions that the
improvements (while preserving heritage values and character) in the town and community feel will improve their liveability and provide a mechanism for
them to be involved in delivering actions and to build community
16
Page 17
those who want there to be ‘no change’. A more prudent approach would be to connection and capacity. There are other strategic plans and documents
anticipate the Pomona and district population in 10 years time, assess what are that provide the strategic direction for Pomona and the Pomona Place
the services and facilities a population that size would require, compare that plan will provide input into these. For example the community feedback
with the services/facilities of today, assess the shortfall and then mark out the for the Place plan will help guide and shape the Local Plan Code for
steps yearon-year to get to the standard and capacity of the services/facilities Pomona in the Noosa Plan 2020. Actions identified in the Place Plan
needed in 2034. related to infrastructure upgrades will be included in the Local
Government Infrastructure Plan ( part of the Noosa Plan 2020).
Feedback on community services will be incorporated into the new
Community Plan for Noosa.
• The draft Pomona Place Plan is deficient in what it depicts in that it does not
use infographics to convey messages. For instance, is it too much trouble to
produce a map of the town’s active transport network showing the existing Noted and will be considered in the final Plan.
network in one colour and planned extensions in another? Show where
investigations into future recreation facilities will occur, in graphic form. Depict
some renders of the exercise equipment the council has in mind to augment
what is available already in Cooroora Creek Park.
• The draft Pomona Place Plan recommends that the community be consulted
about the design of seating throughout the town and also about ‘entrance signs’
to the town. Both are good initiatives, but haven’t they been resolved already? Street furniture needs to be reviewed to ensure that is fit for purpose and
Pomona’s distinctive street furniture design is a timber leaf-shaped seat. They is accessible for everyone. The design of new seating in additional to the
are much loved. In relatively recent times, Cr Amelia Lorentson was approached existing leaf design will be undertaken in consultation with the
and informed that the leaf seats were rotting and in need of replacement/repair. community.
Subsequently, the seats were replaced. (They need a good oil now.) If the
placemaking exercise results in a new design, will seats in that design sit side As per the action in the draft plan entry signs will be subject to further
by side with the leaf seats, or will the existing seats be dug up and replaced – engagement with community.
like with like (no overall improvement in respect of numbers of seats). As to
entrance signs, I remind Noosa Council that townsfolk fought TMR to have the
Cortens steel sign just off the Bruce Highway at the entrance to Pomona
erected there as an entrance statement. Why would this not be the template for
entrance signs closer to town, on other gateways, for the sake of consistently?
Why reinvent the wheel? Or have two sign designs?
• Pomona could be a pilot project for this intergenerational living concept, which
will be ready from April 2026. So far, Noosa Council has ignored the
Grandschools proposal outlined as part of the placemaking consultation.
• What is the future of the Pomona Works Depot? That should be part of the Include this as an action in the Appendix B – consideration of Pomona
Place Plan, not left unmentioned. Most certainly, its future should be considered being part of a Grand Schools proposal in consultation with the broader
under the Noosa Council Strategic Land Activation Policy. community.
• In its Economic Development Strategy 2021-2030, Noosa Council identifies that
industrial and commercial land supply is a key enabler of economic growth. It Noted and not part of the scope of the Place Plan.
proposes a Food and Agribusiness Development Plan, a Green Economy
Industry Development Plan and a review of ‘employment land stocks’. Where The review of the SEQ Regional Plan included the addition of two sites at
does the Pomona Place Plan show how these will be considered in and around 94 and 170 Holts Road, Cooroy, in the urban footprint for industrial to
the town, or is the fix in already – these reviews will bypass Pomona so the support employment (industrial) land supply in the sub-region and
town won’t share in the economic benefits that will flow? Pomona lies at the broadly across SEQ . The combined lots have an overall site area of
centre of the space where Noosa Council pledges to continue to ‘work with 33.78Ha and will provide for future industry development up to 2051. It is
industry and stakeholder groups in the food and agribusinesses sector to expected that this land will provide for future industrial land supply for the
strengthen the ecosystem to connect and collectively solve shared challenges Hinterland and more broadly across Noosa Shire. Can include
and realise opportunities to unlock industry growth, particularly in areas of investigations for future commercial and industrial land for Pomona as an
competitive advantage that align with Smart Biosphere i.e. regenerative and action in Appendix B which will then be included as part of the review of
sustainable agriculture, growing local food networks, strengthening supply the Place Plan in 5 years time and can be tested wit the community.
chains, circular economy initiatives’. Given the tight supply of
commercial/industrial land around Pomona, it is imperative that the town be These plans from part of the Economic Development Strategy and
Economic Development are happy to collaborate and engage with the
17
Page 18
included in the review of council and State-owned land zoned for industry and Pomona business community across a number of these key plans. For
commercial development to determine how these assets may be best used for example:
community benefit. Food and Agribusiness Development Plan -We are actively
collaborating with the Food and Agribusiness Network (FAN) to support
and expand existing businesses in the Noosa Hinterland, including
Pomona.
Green Economy Industry Development Plan This strategy includes all
businesses across the shire, both supply and demand, that operate in the
Green Technology space.
We are eager to work with any businesses that are ready to grow and are
happy to include Pomona businesses in any opportunities.
Review of Employment Land Stocks
This strategy is proactive in attracting businesses that align with Noosa’s
values and the character of each village or community. We are in the
early stages of this process, but once land is identified in Pomona, we
look forward to engaging with the Pomona community.
• The need for an active transport short pathway from the ends of the streets in It is not the role of a Place Plan to replicate other strategies and plans
Songbird Estate to Cooroora Creek Park, there to join to the town’s active that already have avenues for collaboration and engagement.
transport network of pathways and cycleways, was put strongly during the
consultation, but is dropped from the list of submissions made. Also, the council Agreed the connection through to Songbird estate should be shown on
commits to ‘advocate’ with the state government for better and more frequent the Action map.
bus services at Pomona. There is no mention of trains. And trains should be Advocacy Action A8- Improvements to public transport includes all public
added to the place plan, simply because Cooran, Pomona and Cooroy are all transport including bus and rail. Amend the action to include mention of
railway towns and, right now, there are moves afoot to have shuttle trains increased train services to town in addition to bus services.
operating between Nambour and Gympie North, about one train every 90 or 120
minutes in each direction between 7am and 7pm. Noosa Council should be
jumping on that particular bandwagon.
• The Pomona Place Plan raises (yet again) the prospect of a sports and
recreation precinct for the town. However, we have been here before. By its The Showground committee has been contacted regarding how the
own assessment, Noosa Council acknowledges that Pomona is under Showgrounds can contribute to the implementation of actions in the Plan.
resourced in respect of land for outdoor sport (as opposed to ‘recreational
purposes’) and indoor sports activity. Incidentally, the Place Plan does not pick
up the existing and long overdue commitment to a Pomona Showgrounds
Master Plan. Noted. Include under Advocacy Action A5 Land Care and Management
• The draft Pomona Place Plan highlights the connection between the town and wording to review the Tuchekoi National Park Management Plan.
nearby Mt Cooroora and stresses the importance of Tuchekoi National Park to
the outdoor recreation needs of the local community. A new management plan
for the Tuchekoi National Park is long overdue. This can be added to the Action tables in Appendix B Employment and
• In 2034, the Noosa Hinterland should be home to a world class 4 or 5-star Small Business to include Accommodation options for visitors.
enviro-resort similar to Kingfisher Bay Resort on K’gari.
• Nowhere does the draft plan contain anything about how the plan will be Noted. Consider a launch event and/or quick win project for the Place
launched, but such an event should be memorable. In my submissions to the Plan based on ideas from the community engagement.
planning consultation, I suggested that Noosa Council work with the Cooroy-
Pomona Lions Club and the Noosa Shire Museum to ‘dig up’ and re-bury the Amend Plan:
Pomona time capsule placed in Stan Topper Park in 1988. Included more information in Part C Implementation of the plan and
the preparation of a separate staged implementation plan with
performance indicators where suitable.
Include additional action in Appendix B – Community Groups
theme, consideration of Pomona being part of a Grand Schools
proposal in consultation with the broader community.
Add pathways to actions map page 6 and have improved clarity by
adding a list of actions at the beginning.
18
Page 19
Extend connection on Map of actions page 42 through to Songbird
estate.
Amend Action A8 Public Transport Improvements to include
mention of increased train services to town in addition to bus
services.
Include under Advocacy Action A5 Land Care and Management
wording to review the Tuchekoi National Park Management Plan.
Appendix B Employment and Small Business to include
Accommodation options for visitors.
19
Used in these records
ATTACHMENT 2 Response Table Draft Pomona Place Plan SubmissionsAttachmentsMeeting 749 · read item & discussion ↗
About this file
- File size
- 162 KB (small file)
- File type
No other editions are linked here.