Skip to the record
The only place to find full transcripts.

Council archive · source document

0015A77E.001

of 28

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Text sections not matched to the original PDF pages. See original document to check page numbers.

~ INTEGRATED PLANNING ACT 1997                                                   :                     iDAS Assessment Checklist, Version 20, 2 Aprit 2007
     -         Integration of land use and public      22.  The application involves: (tick the applicable box/es)—         oO                                       .
        :     panspo r emation refer to Guide 23, schedule | ‘£1 (i) a material change of use assessable against the planning scheme for a purpose                   \
               8A of the IPA, & schedule 2 of the IP Regulation.    mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that             \
          _    Unléss you answered “none of the above’, the         schedule.   .            :                                       ,
               application triggers referral to QT as a                                         .
               concurrence agency.                          [_] {ii) reconfiguring a lot—        .           ,
                                                                     [J (a)     on land that is completely or partly within a public transport corridor, and the
                                                 uo             ,               total number of lots increases;
                            .                                        [-](b)     on land that is completely or partly within a future public transport corridor or
                                                                                an airport's public safety.area; -                       ,
              cs                             7S                      Ci (c)     on land that is within 400m of a public passenger transport facility or a future
              i              me                                                 public passenger transport facility, and the total site area is 5000m? or greater;
                      .         ;                                    [J (d)     fora residential purpose within the 25 ANEF contour for an airport;
                     rn                   —                          [J (e)     for aresidential purpose resulting in 100 or more allotments. :
.                 os                  ”         —            1 (iii) operational work assessable against the planning scheme, but not associated with a
              _            ,            7       Op,                 material change of use mentioned in (i).above or reconfiguring a lot mentioned in (ii)
.                                    .                              above, on land that—                     ‘
              .          ;                                           [1 (a) _ is completely or partly within a public transport corridor or a future public           ,
                .               *           Sus                                 transport corridor;
                               me,                   .               [1 (b)     will result in work that encroaches into an airport's operational airspace.
                                                            vj (iv) none of the above.                                             :                          ©
         ‘Railway safety and efficiency         _  ~ | 23.  The application involves: (tick the applicable box/esN—
          . _ For more information refer to Guide 23, schedule L_] (i) a material change of use assessable against the    planning scheme for a  purpose
               BA of the IRA &'schecile 2 of he IF Regulation. | ”  mentioned in schedule 13D of the IP Regulation and oxcending the thresholds set by that
               Uniess you answered “none of the above’, the                                        :                      .
              application triggers referral to QT as.a * yo         schedule.                             :
               concurrence agency.        ,                 Oi iii) reconfiguring a lot—
  se              So                        |           /            CJ (a)    on land that is completely or partly within a future public transport corridor,
                           :         ,       .     :      .                    future railway land or a railway tunnel easement;               ,                  ;
                      ;                            oo                [1 (b)    on land that is within 400m of a Citytrain passenger railway station‘or a future
          .                                                               _.    Citytrain passenger railway station, and the total site area is 5000m+ or -
       .            .                                              ue         greater;                 mo                                                     ‘
                    .                               en               [1 (c} — on land that abuts rail corridor !and, commercial corridor land or future railway
       ,                                   0             .                      land,.and the total number of lots increases;
              2            -              m,                         (1 @)__   onland that abuts rail corridor iand, commercial corridor land or future railway
                                                                            -   land and an easement abutting the corridér or future railway land is created;
    ;                                           .                    C1 (e)    on land that is completely or partly within 100m of, and abutting an approach
                me                                  .                         - fo, a railway level crossing, and the total number of lots increases;
      ;       _                                      yo              C1 (f}    for aresidential purpose resulting in 100 or more allotments.
     .        ,                   ‘                         (LJ (iii) operational work assessable against the planning scheme, but not associated with a @
                                                                    material change of use mentioned in {i) above or reconfiguring a lot mentioned in (ii)
                                                    .               above, involving extracting, excavating or filling greater than 50m4, on land that— .
                                                                    ‘L] (a) _ is completely or partly within rail corridor land or commercial corridor land, and
              mo                      '                   ;                   _ the work is not for rail transport infrastructure or other rail infrastructure; oo
              ——                                              :      (J (b)     is completely or partly within future railway land, or a railway tunnel easement;
                  .                                                  (1 (c)    abuts rail corridor land, commercial corridor land or future railway land, and -
                                                                        ,      the work is within 25m of the railway boundary.
   Doe                              -                       A (iv) none of the above.                    |
              ‘Moonie to Brisbane pipeline             24,  The application involves the easement for the construction or operation of the Moonie to
               For more information refer to schedule 2of the IP Brisbane strategic pipeline, and involves: {tick the applicable box/es)—
         ;    Semen naweredTione of the    above” th        [J (i) a material change of use assessable against the planning scheme and not associated                 .
               applicaton triggers referral tothe holder of         with reconfiguring a lot, and any structure or work will be located wholly or partly in the
              pipeline licence No 1 issued under the Petroleum      easement.
           _ Act 1923, currently Santos QNT Pty Ltd, for    CT (ii reconfiguring a lot                  .
    “          ance.                                        C (iii). operational work assessable against the planning scheme, that is filling, excavation,
                                                 :                  compaction, drifling, boring or piling not associated with a reconfiguring a lot, and-the
 :                          .                              7        work is located wholly or partly in the easement.
                          .                                ~ [¥] {iv) none of the above.                                                                   ,
.       +                     -                             .          .                                                                    1         .

    ;                                                                                     Page 8                              a                                 ,
                    4                                                                        .                              .

Used in these records

About this file

File size
2.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015A77E.001.pdf · 2.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.