Council archive · source document
0015A77E.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
INTEGRATED PLANNING ACT 1997 __ IDAS Assessment Checklist, Version 20, 2 April 2007
Works that take overland flow water | 12. Does the application involve works that take overland flow water in a HPA or an FMA?
The relevant wild river dectaration will state
works that take overland flow water are either [}No (LJ yes (ensure you have completed Part Ke of Form 1)
self assessable or assessable, or are exempt : :
# from wild river requirements. 13. If YES, is the application for works stated in the relevant wild river declaration to be?
If you ticked Q13 i), your application must be . . .
: ___ assessed by NRW against the Wild Rivers Code LJ i) assessable works 4 ,
and must comply with the code. [_] ii) self-assessable works oe
If you ticked Q13 ii} an application is not required se
to be made however the works must comply with} | iii) exempt works .
the retevant self-assessable section of the Wild . . t
, Rivers Code, otherwise the works become .
assessable development for which an application :
is required and must be assessed by NRW . ‘
against the retevant part of the Wild Rivers Code
and must comply with the code. / ; ,
If you ticked Q13 iii) your application is not . . . .
. subject to wild river requirements.
Applications for development that is other than . . . . .
that stated to be assessable, self-assessable or
exempt will not be accepted. : . / ; _.
Works that interfere with overland 14. Does the application involve works that interfere with overland flow water ina FMA?
flow water , .
The relevant wild river declaration will state UO 0 C) ES (ensure you have completed Part Kio 0 )
N Y SUF hai : it Kio of Form 4
works that interfere with overland flaw water that
are either self assessable, assessable or exempt| 15. If YES, is the application for works stated in the relevant wild rivers declaration to be?
@ * from wild river requirements. oO . . bi rk ‘
Ifyou ticked Q15 i), your application must be i) assessable WOrkS oO .
assessed by NRW against the Wild Rivers Code [1] ii) self-assessable works ;
and must comply with the code. .
if you ticked Q15 ii) an application is not required O iii) exempt works
: to be made however the works must comply with
the relevant self-assessable section of the Wild .
Rivers Code, otherwise the works become .
assessable development for which an apptication
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code ‘
and must comply with the code. . . :
. if you ticked Q15 iii) your application is not :
; subject to wild river requirements. . .
Applications for devetopment that is other than .
that stated to be assessable, self-assessable or ,
"exempt will not be accepted. : . oO : .
Waterway barrier works 16. Does the application involve building or raising waterway barrier works in a PA?
Applications for building or raising waterway
barrier works in a HPA will not be accepted. ¥| NO [} YES (ensure you have completed Part O2 of Form 1)
If you answered YES to Q16, your application : ,
must be assessed by DPIF against the Wild . ; .
: Rivers Code and must comply with the code. : ,
© Aquaculture (non ERA) 17. Does the application involve aquaculture in a PA? Le
red for aquaculture in a HPA will nat be [¥] No [| Yes (ensure you have completed Part O: of Form.1}
fyou answered YES to Q17, your application , ,
must be assessed by OPIF against the Wild
Rivers Code and must comply with the code.
Works that interfere with water ina | 18. Does the application involve operational works that interfere with water in a watercourse that is in
watercourse a nominated waterway in a PA?
applications for all works that interfere with water [| NO [] YES (ensure you have completed the relevant Part K of Form 1} .
Note: If the devefopment is proposed in a HPA,
oo in a watercourse {including dams or weirs, : : ,
stream realignment or stream diversion) willnot 149 If YES
be accepted. mo .
Ina PA, applications for instream dams and [_} i) The application is for an instream dam or weir: or
weirs may be accepted in nominated waterways. vs eg . : . . :
if you ticked box ji} in Q19, your application will [] ii) The application is for operational works that interfere with water in a watercourse, and is
Not be accepted. for development other than a dam or weir. .
Note: Operational works outside a HPA or ‘
- nominated waterway are not subject to wild .
tiver requirements. : : .
More information and locations of nominated . .
__ Waterways is available by contact NRW,
accessing the department's website :
www.nrw.qid.gov.au or contacting the .
department by email on: .
wild [email protected], au. : . ; ; : :
Page 13See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015A77E.001.pdfRelated documentPublic source context ↗
07/0836 - Op Works - Landscaping, Carparking & Access [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.