Council archive · source document
0015A77E.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
INTEGRATED PLANNING ACT 1997 . 7 Part, Version 2.0, 4 October 2004
: rs , nN a) . . ; , ,
7 \ %, Form 1 Development Application idas i
1% %
. i ' ) ) 1] ! | , k “eames eae ioe .
7 Operational &/or building work is.
| wy assessable against a local government’s planning scheme =. ¢t
} : | ey Fars
- Completion of all question on Part E is mandatory for afl applications involving the assessment of operational work and/or building work (including detailed
engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual design plans for engineering & building work when the apptication does -
"not involve assessment of a material change of use of premises at the same time) assessable against a locat govemment’s planning scheme.
- Nature of the application 1. This application is for (tick one (1) or both if applicable)
A development permit authorises tae . nan topes
. . Jopment fo occur, while a preliminary C] Preliminary approval provide details of the type of work eg. roadwork, stormwater, water and sewerage
approval is a step in the approval process . — - - —
and does not authorise development to occur. ORS nA GOON Money -
The types of work that are assessable against} 4c 0p An.
@] 2pamTing schere are determined by ne AND/OR
. sce be ae toca govemment and fd Development permit - provide detaisof the type of work eg. roadwork, stormwater, water and sewefage |
To determine the types of work that are ——
assessable under a particular planning: OMe 24 tow ty Won .
scheme, contact the retevant loca! s ;
goverment. 2. Are the works subsequent to a previous development approval?
Lo, a C] NO . . [A YES — provide details of aff previous approvals (eg. file references) - ,
: , . bent. We D36G oF .teo4.- Lasnineg 4
. whet +a4
"13. Is the subdivision for a canal estate? BY ‘seo ony.
a 7 FN . Des | :
Portable Long Service Leave levy (if |4. Is payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal?
applicable) - _- _ . : . :
- Prior to issuing a development permit for the L1 YES - compete a5
works, the assessment manager is required [[] NO - 05, 6 & 7 do not apply a :
by law to ‘sight’ an approved form, issued by Lo , Se
Qleave, which signifies thatthe PLSLlevy [5. Has the PLSL levy been paid? .
: has been paid. . CJ Yes- . . . .
oe : [1 NO - the applicable levy must be paid before a development permit can be given for the works
. e DO 6. Howmuch was paid? , —
, - 7. Whatis the receipt number of the payment? st
| | . PLEASE NOTE |
OO This application cannot be accepted unless accompanied by Part A of Form 1. ,
, The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information
oe requested by Part A and any other relevant part of Form 1.
OFFICE USE ONLY {applicable to assessment manager) ,
. Ar , REFERENCESee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015A77E.001.pdfRelated documentPublic source context ↗
07/0836 - Op Works - Landscaping, Carparking & Access [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.