Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

0015A77E.001

of 28

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Text sections not matched to the original PDF pages. See original document to check page numbers.

INTEGRATED PLANNING ACT 1997                                                                             IDAS Assessment Checklist, Version 20, 2 April 2007 \
              State-controlled road matters            2.    The application involves: (tick applicable box/es)
               OF mare information refer to Guide 3          [J] {i) development on land contiguous’ to a State controlled road and for-
              F       information refer to Guide 3.               ;                               :
              Unless you answered “none of the above” to Q2,                        .                    .              .              .
              the application tiggers referral to tie Department     (] (a) material change of use assessable against the planning scheme;                                 4
               f Main Roads (DMR'     ferral                                          oo                                                    :
              of Main Roads (DMR) as a referral agency.              (J (b) reconfiguring a fot unless -
              In certain circumstances DMR will be an advice                                             .     .         .
              agency, while in other circumstances OMR will                  « the total number of lots is not increased; and                                /
              be a concurrence agency.                                       + the total number of lots abutting the State-controlled road is not increased;            ;
              Schone 2 of te Ie Reauaton. wil assist you to |        (J (c) operational work (not associated with a material change of use assessable against the
              concurtence agency for the application.                        planning scheme or reconfiguring a lot mentioned in (b) above}-                         >
               .                        .                                    * associated with access to a State-controlled road; or
                                                                             ¢ for filling or excavation; or
                                                                             « involving the redirection or intensification of site stormwater from the land, through a
                             .                                                 pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
                                                                               State-controlled road.                                                                    .
                                                             (_] (ii) development on land not contiguous to a State-controlled road and -
                                                                     (J (a) material change of use -
                                                              ;             « assessable against the local government's planning scheme; and                   .
                         -                                                  « mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
                                                                              that schedule;
                                                                     (J (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation
                                                                         7”   and exceeding the thresholds set by that schedule;
                                                                     (J (c) operational work {not associated with @ material change of use assessable against Fg
                                                                              planning scheme or reconfiguring a lot mentioned in (b} above)—
,                            :                                              « assessable against the local government's planning scheme; and
  ‘                                                          .              * mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
                 .                                          ‘         .       that schedule.              oe
                                                             [7] (iii) none of the above
              Clearing vegetation                      3.    The application involves: (tick applicable boxes)              7
              For more information refer to Guide 12.  .     Oo (i)   material change of use—                                            ,                   .
              Unless you answered “none of the above” to Q3,     .                          :     .        .           .                          :                 a
             ~ the application requires assessment by the              (a) assessable against the planning scheme;                                .
          “Department of Natural Resources and Water                                      ining —                                                          :
|             (RW),                                                    (b) on alot containing                                                         .
              if an agency other than NRW is the assessment              7a category 1, 2 or 3 area shown on a property map of assessable vegetation; or
              manager for the application, NRW is a                        «  if there is no property map.of assessable vegetation for the lot - remnant vegetation;
              ao  rene agency for the applicalion in relation          (c)  where the existing use of the land is a rural or environmental use; and
         _    you ticked 34) oF (i), your application requires         (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
              whether vegetation clearing is proposed or not. 0 ( ) :         igu   : 94 Ce                    :               .                        .          .
              referral to NRW for assessment regardless of       il    reconfigurin      lot—                     :                               os
                         .               —                            {a)  on alotcontaining a category 1, 2 or 3 area shown on a property map.of
                                                                           assessable vegetation or, if there is no property map of assessable vegetation ~@
                                                                     “the lot, remnant vegetation;                                                              ,
                                                                      {b)   where the size of the lot before the reconfiguration is 2 hectares or larger;
                                    ;                                  (c)  where 2 or more lots are created; and                  .       ‘
                                                           .           (d)  where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
                       a                                    C1 (iii)  operational work -
                                 m                                     (a)  for the clearing of native vegetation where the vegetation clearing is made
          .                                                              -  assessable under Schedule 8 of the IPA; and
                                                                       (b}  not associated with a material change of use assessable against the planning
                                              .                             scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
                                                                    /      Form 7                        .          "                    .
                                                            ha (iv)   none of the above.                                                                    -
              Strategic port land                      4.   The application involves:
              . ried te. a ° ota, yes                        [J (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
                you ticked (I) - the relevant ort Authorify is ine                                  .                         i
              assessment manager for the application.               Act) - complete Part | of Form 1
              Hf you ticked (ii) Queensland Transport is a   C1 fii) a material change of use that is inconsistent with the land use plan approved under the
              concurrence agency for the application.               TI Act for the strategic port land - complete Part f of Form 1                                   .
                                                             Vv) (iii) none of the above

              4  Land contiguous to 2 State-controlled road is defined in schedule 14 of the IP Regulation to mean tand - if part of the land is within 100m of the State-controlled road; or that is part of a future State-
                controlled road.
                                                                                            Page 2°

Used in these records

About this file

File size
2.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015A77E.001.pdf · 2.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.