2020-10-21 Final Order - Approval Conditions and Approved Plans - P&E Appeal No 61 of 2018 - RAL17-0504
Plans and drawings: the text below has words only, no drawings.
DEPC18/392 (1709-1474 SRA)
Attachment 1- Referral agency conditions
(A copy of the plan referenced below is found at Attachment 2)
No. Conditions Condition timing
Development Permit for a Reconfiguring a lot – 1 into 4 lots
10.17.3.5.1―Tidal works or work in a coastal management district—The chief executive
administering the Planning Act 2016 nominates the Director-General of the Department of
Environment and Science to be the enforcement authority for the development to which this
development approval relates for the administration and enforcement of any matter relating to
the following condition(s):
1. The development must be carried out generally in accordance At all times
with the Preliminary Plan of Development, prepared by TOD
engineers & project managers, dated 6 August 2020,
reference 17623-SK100 sheet 1 of 2 revision F.
State Assessment & Referral Agency Page 2 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.