2020-10-21 Final Order - Approval Conditions and Approved Plans - P&E Appeal No 61 of 2018 - RAL17-0504
Plans and drawings: the text below has words only, no drawings.
EXECUTIVE SUMMARY If a Noosa River flood event is anticipated, residents of 135 Lake Weyba Drive must follow emergency response steps summarised in Table 1-1. TABLE 1-1 FLOOD EMERGENCY MANAGEMENT PLAN # TIMING ACTION WHO ADVICE/COMMENTS/ETC 1 Before a Flood Ensure flood Body Corporate a) Ensure the FEMP is up to date, and Event warning b) Ensure necessary arrangements with 3rd arrangements are party suppliers (eg gauge maintenance) in place are in place and active 2 Before a Flood Ensure Residents Body Corporate Residents are to be given a copy of FEMP and Event are aware of briefing on the Emergency Response Strategies as flood risk described in section 3.6 of this FEMP 3 5 Day forecast Be alert and Residents Residents to access rainfall or flood forecast via for heavy prepare to shelter BOM website or other third party and pay rainfall or in place or self- attention to forecast rain fall, flood gauge heights storm evacuate etc as detailed in section 3.5 of this report 4 Resident Residents are to Residents Residents to access rainfall or flood forecast via becomes monitor further BOM website or other third party and pay aware of forecasts attention to forecast rain fall, flood gauge heights potential etc as detailed in section 3.6 of this report. flood risk on Residents should continue to monitor until: site • The potential for flood has passed by a decreasing water level reading at the Tewantin flood gauge level; or • The next step is engaged. 5 3 Day BOM Residents to be Residents If Shelter In Place be prepared for isolation period forecast for prepared to of several days although the flood peaks are not rainfall in execute anticipated to last for more than several hours. excess of emergency Residents should have enough food and water for 400mm, or 1 response being a period of several days. day forecast either Shelter in If Self-evacuation – Residents should prepare for for rainfall in Place or Self imminent self-evacuation. excess of Evacuate 300mm. 6 Site flood Residents to Residents If Shelter In Place undertake actions in Appendix B. height gauge execute If Self-evacuation, undertake actions in Appendix B reaches emergency and leave via the self-evacuation route. 1.3mAHD response being (siren either Shelter in triggered). Place or Self Evacuate 7 Lake Weyba Cease evacuation Residents Although fast flowing water is not anticipated, Drive is and Shelter in residents should not attempt to drive through inundated Place lengthy stretches of inundated road. Flood Emergency Management Plan | 27 February 2020 135 Lake Weyba Drive, Noosaville Page 1 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.