Skip to the record
The gold standard in government transparency.

Original source · versioned page text

2020-10-21 Final Order - Approval Conditions and Approved Plans - P&E Appeal No 61 of 2018 - RAL17-0504

of 52

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                       FIGURE 1-2 SITE TOPOGRAPHY (SOURCE WATERTECH 2018)

1.2.3       Site Layout
Figure 1.3. presents the lot layout and shows the lot sizes vary from 1211m2 to 1.3ha, each with a defined
Building Envelope. Access is off Sail Street to service Lots 1 and 2, whereas Lots 3 and 4 have direct access
off Lake Weyba Drive.




Flood Emergency Management Plan | 27 February 2020
135 Lake Weyba Drive, Noosaville                                                                      Page 7
                                                                                                                24
Log in to download the original file

2020-10-21 Final Order - Approval Conditions and Approved Plans - P&E Appeal No 61 of 2018 - RAL17-0504.pdf · 6.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.