Skip to the record
Every meeting, every word.

Original source · versioned page text

2020-10-21 Final Order - Approval Conditions and Approved Plans - P&E Appeal No 61 of 2018 - RAL17-0504

of 52

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
2            FORECASTS AND WARNINGS
2.1          Overview
Monitoring the weather forecasts and warnings will be the most important step in managing the flood risk of
the site. The Bureau of Meteorology (BoM) forecasts rainfall maps which can be used to estimate the daily
amount of rain expected to fall for the next 5 days through the Forecast Rainfall feature on their website
(http://www.bom.gov.au/jsp/watl/rainfall/pme.jsp). In addition to this, the BoM’s MetEye service can provide 3
hourly rainfall total estimates up to 24 hours in advance (http://www.bom.gov.au/australia/meteye/).

Real-time rainfall intensity data is available through the BoM weather radar service. The Gympie (Mt Kanigan)
Radar provides coverage for the Noosa River catchment, which is available on their website
(http://www.bom.gov.au/products/IDR083.loop.shtml#skip).

The BoM also provide weather warnings for severe weather events which may lead to flooding, which can be
located on their website (http://www.bom.gov.au/qld/warnings/) and are distributed and re-broadcast through
various media including radio.

2.2          Rainfall Gauges
There are also a number of rainfall and creek level gauges within the Noosa River catchment. The rain gauges
show the amount of rainfall which has fallen in the preceding 1 hour, 3 hour and 24 hour time periods, and the
creek level gauges provide real-time information on water levels within the waterways.

The location of the Rainfall gauges in relation to the site and the wider catchment is illustrated in Figure 3-1.

Due to the nature of flooding behaviour at the site, the rainfall gauges and BoM forecasts rainfall maps will
provide the most useful flood warning information for the site, particularly the Tewantin (RSL) Rainfall gauge
will provide rainfall coverage of most interest which is available on their website
(http://www.bom.gov.au/products/IDQ60801/IDQ60801.94570.shtml).




Flood Emergency Management Plan | 27 February 2020
135 Lake Weyba Drive, Noosaville                                                                          Page 10
                                                                                                                    27
Log in to download the original file

2020-10-21 Final Order - Approval Conditions and Approved Plans - P&E Appeal No 61 of 2018 - RAL17-0504.pdf · 6.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.