2020-10-21 Final Order - Approval Conditions and Approved Plans - P&E Appeal No 61 of 2018 - RAL17-0504

of 52

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                               Draft Covenant pursuant to Condition 27       22 June 2020

3.    All lot numbering on the subdivision plan to be submitted to Council for compliance
      assessment must remain as shown on the Approved Plans.
4.    The development must be undertaken and operated in a manner that causes no
      detrimental effect upon the amenity of the neighbourhood by reason of the creation of
      excessive noise, lighting nuisance or other emissions.
Currency Period
5.    The Currency Period for this development approval lapses if all conditions have not been
      complied with, and the plan of survey lodged with Council for endorsement by 30 August
      2024, unless an application to extend the currency period is approved by Council.
Plan of Development
6.    All future dwellings on proposed Lots 1, 2 & 4 must be sited and constructed in
      accordance with the approved building envelopes and dwelling controls as shown on
      the Approved Plans. A copy of the approved Plan of Development and other
      management plans (referred to in this development approval) must be included in any
      contract of sale for the proposed lots, together with a clause which requires all dwellings
      to be constructed in accordance with the development approval.
7.    The Applicant must prepare a metes and bounds building envelopes plan indicating
      building pad areas for the proposed lots. The areas must be in accordance with Plan of
      Development, Drawing No. 17623-SK100, Revision F prepared by TOD Engineers and
      Project Managers, dated 6 August 2020. The plan must be submitted in both hard copy
      and digital format (dwg) on GDA 94 zone 56 coordinates. The Applicant must submit the
      plan to Council for approval prior to the endorsement of the Plan of Survey.
8.    Dwellings and outbuildings are to be located within the building envelopes provided for
      the proposed lots consistent with Plan of Development, Drawing No. 7623-SK100,
      Revision F prepared by TOD Engineers and Project Managers, dated 6 August 2020.
9.    The Body Corporate is responsible for maintaining the access to the proposed lots in
      accordance with the Plan of Development, Drawing No. 7623-SK100, Revision F
      prepared by TOD Engineers and Project Managers, dated 6 August 2020.
Onsite Civil Works
10.   Prior to sealing of the plan of survey, proposed Lots 1, 2 & 4 are to be filled to provide
      suitable building pads and access in accordance with the Plan of Development, Drawing
      No. 7623-SK100, Revision F prepared by TOD Engineers and Project Managers, dated
      6 August 2020. The works required are to be in accordance with the following:
      a)    the building pad on proposed Lot 4 is to be located not less than 4m from the
            southern boundary;
      b)    the building pads within proposed Lots 1, 2 & 4 are to achieve a minimum reduced
            level of RL 2.600m (AHD);
      c)    the access driveway from Lake Weyba Drive to each of the proposed lots is to be
            constructed in accordance with the Plan of Development, Drawing No. 7623-
            SK100, Revision F prepared by TOD Engineers and Project Managers, dated 6
            August 2020, including the provision of 5.5m wide passing bays as shown;
      d)    the access driveway is to achieve a minimum reduced level of RL 1.5m (AHD);
      e)    roadside flood height gauge boards are to be installed within the common property
            to indicate depth of floodwaters to residents and occupiers of the site in metres
            (AHD);




                                                                                                    2
Log in to download the original file

2020-10-21 Final Order - Approval Conditions and Approved Plans - P&E Appeal No 61 of 2018 - RAL17-0504.pdf · 6.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.