2020-10-21 Final Order - Approval Conditions and Approved Plans - P&E Appeal No 61 of 2018 - RAL17-0504
Plans and drawings: the text below has words only, no drawings.
Draft Covenant pursuant to Condition 27 22 June 2020
3. All lot numbering on the subdivision plan to be submitted to Council for compliance
assessment must remain as shown on the Approved Plans.
4. The development must be undertaken and operated in a manner that causes no
detrimental effect upon the amenity of the neighbourhood by reason of the creation of
excessive noise, lighting nuisance or other emissions.
Currency Period
5. The Currency Period for this development approval lapses if all conditions have not been
complied with, and the plan of survey lodged with Council for endorsement by 30 August
2024, unless an application to extend the currency period is approved by Council.
Plan of Development
6. All future dwellings on proposed Lots 1, 2 & 4 must be sited and constructed in
accordance with the approved building envelopes and dwelling controls as shown on
the Approved Plans. A copy of the approved Plan of Development and other
management plans (referred to in this development approval) must be included in any
contract of sale for the proposed lots, together with a clause which requires all dwellings
to be constructed in accordance with the development approval.
7. The Applicant must prepare a metes and bounds building envelopes plan indicating
building pad areas for the proposed lots. The areas must be in accordance with Plan of
Development, Drawing No. 17623-SK100, Revision F prepared by TOD Engineers and
Project Managers, dated 6 August 2020. The plan must be submitted in both hard copy
and digital format (dwg) on GDA 94 zone 56 coordinates. The Applicant must submit the
plan to Council for approval prior to the endorsement of the Plan of Survey.
8. Dwellings and outbuildings are to be located within the building envelopes provided for
the proposed lots consistent with Plan of Development, Drawing No. 7623-SK100,
Revision F prepared by TOD Engineers and Project Managers, dated 6 August 2020.
9. The Body Corporate is responsible for maintaining the access to the proposed lots in
accordance with the Plan of Development, Drawing No. 7623-SK100, Revision F
prepared by TOD Engineers and Project Managers, dated 6 August 2020.
Onsite Civil Works
10. Prior to sealing of the plan of survey, proposed Lots 1, 2 & 4 are to be filled to provide
suitable building pads and access in accordance with the Plan of Development, Drawing
No. 7623-SK100, Revision F prepared by TOD Engineers and Project Managers, dated
6 August 2020. The works required are to be in accordance with the following:
a) the building pad on proposed Lot 4 is to be located not less than 4m from the
southern boundary;
b) the building pads within proposed Lots 1, 2 & 4 are to achieve a minimum reduced
level of RL 2.600m (AHD);
c) the access driveway from Lake Weyba Drive to each of the proposed lots is to be
constructed in accordance with the Plan of Development, Drawing No. 7623-
SK100, Revision F prepared by TOD Engineers and Project Managers, dated 6
August 2020, including the provision of 5.5m wide passing bays as shown;
d) the access driveway is to achieve a minimum reduced level of RL 1.5m (AHD);
e) roadside flood height gauge boards are to be installed within the common property
to indicate depth of floodwaters to residents and occupiers of the site in metres
(AHD);
2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.