The peak time in the 1%AEP Flood event on the Noosa River for the three river gauge sites is relatively similar.
For the evacuation procedures associated with this FEMP the Noosa River gauge site of specific interest is
the Tewantin Gauge, details of which can be seen in Table 3-2.
Tewantin
site gauge
Site
FIGURE 3-2 NOOSA RIVER CATCHMENT GAUGE LOCATIONS (SOURCE – BUREAU OF METEOROLOGY)
TABLE 2-2 TEWANTIN GAUGE PARAMETERS
Parameter Value
BoM Reference Number 540310
Minor Flood Level 1.00m
Moderate Flood Level 1.30m
Major Flood Level 1.80m
2.4 Site flood monitoring system
The site will be subject to flooding during large rainfall events for which Lake Weyba water levels rise in
response to severe downpours. There is the potential for failure (e.g. telecommunications or power failure) of
gauges. As a backup, it is proposed that flood height gauge and siren are to be installed to indicate depth to
residents of the site within the common property. This gauge will be installed to BOM specifications. This will
allow site specific flood monitoring in conjunction with reviewing the BOM weather warnings.
Flood Emergency Management Plan | 27 February 2020
135 Lake Weyba Drive, Noosaville Page 12
29
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.