2020-10-21 Final Order - Approval Conditions and Approved Plans - P&E Appeal No 61 of 2018 - RAL17-0504

of 52

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
The peak time in the 1%AEP Flood event on the Noosa River for the three river gauge sites is relatively similar.
For the evacuation procedures associated with this FEMP the Noosa River gauge site of specific interest is
the Tewantin Gauge, details of which can be seen in Table 3-2.




                                                                                                   Tewantin
                                                                                                   site gauge




                                                                                            Site




   FIGURE 3-2 NOOSA RIVER CATCHMENT GAUGE LOCATIONS (SOURCE – BUREAU OF METEOROLOGY)

TABLE 2-2    TEWANTIN GAUGE PARAMETERS

 Parameter                                                                          Value
 BoM Reference Number                                                               540310
 Minor Flood Level                                                                  1.00m
 Moderate Flood Level                                                               1.30m
 Major Flood Level                                                                  1.80m

2.4          Site flood monitoring system
The site will be subject to flooding during large rainfall events for which Lake Weyba water levels rise in
response to severe downpours. There is the potential for failure (e.g. telecommunications or power failure) of
gauges. As a backup, it is proposed that flood height gauge and siren are to be installed to indicate depth to
residents of the site within the common property. This gauge will be installed to BOM specifications. This will
allow site specific flood monitoring in conjunction with reviewing the BOM weather warnings.




Flood Emergency Management Plan | 27 February 2020
135 Lake Weyba Drive, Noosaville                                                                         Page 12
                                                                                                                   29
Log in to download the original file

2020-10-21 Final Order - Approval Conditions and Approved Plans - P&E Appeal No 61 of 2018 - RAL17-0504.pdf · 6.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.