Building Approval · MCU22/0116.01

of 82

Text shows just the words. Original shows the document exactly as it was published.

Original PDF page 11, section 1. The text section number identifies this passage in the reader.

                                                                                              Page 5 of 5

29. ENERGY EFFICIENCY
    This approval must comply with the requirements of NCC Vol 2 H6 and ABCB Housing Provisions
    Clause 13 Energy Efficiency or site specific Energy Efficiency Report.

30. REFERENCE CORRESPONDENCE
    Reference correspondence from Noosa Council for MCU: MCU22/0116, OPW22/0173& RAL22/0014

31. PLUMBING AND DRAINIAGE COMPLIANCE ASSESSMENT
    Please contact the Relevant Council to carry out Plumbing & Drainage Inspection in accordance with
    the Plumbing & Drainage Act 2002.

32. ASSUMED FLAT SITE
    Unless site specific contour details have been provided in an acceptable format this approval has been
    granted for a flat building pad on natural firm soil. Building work is not to be constructed on uncontrolled
    fill (Cut or Fill).

33. ACOUSTIC
    Construction sound insulation is to comply with NCC H4F6 between sole occupancy units.

34. CERTIFICATES

    The following certificates (Form 12, 43 & 15) must be submitted prior to the development approval
    being finalised:
    1. Surveyors Setout Certificate
    2. Engineer Footing Inspection Certificate
    3. Engineer Slab Inspection Certificate
    4. Underslab Termite Certificate
    5. Perimeter Termite Certificate
    6. Slip resistance of tiling
    7. Treatment level of external timbers
    8. Truss Certificate
    9. Manufacturers Frame Certificate
    10. Window Glazing Certificate
    11. Installation of Windows and Doors
    12. Shower Glazing Certificate
    13. Builder's Advice (Energy Efficiency and Sustainability)
    14. Builder's Advice (Fire Separation)
    15. Wet Seal Certificate
    16. Smoke Alarm Certificate
    17. Energy Efficiency Certificate
    18. Electrician’s Compliance Certificate (sustainable housing measures)
    19. Plumber’s Compliance Certificate (sustainable housing measures)
    20. Plumber’s Compliance Certificate (Rainwater tank installation)
    21. Form 16 from garage door installer confirming garage door complies with AS/NZS 1170.2 & AS/NZS
        4505
    22. Engineer Core Filled Blockwork Inspection Certificate
    23. Waterproofing for Installation of Windows and Doors
    24. Builder's Advice – Sound Insulation
    25. A Form 43 set out certificate is to be supplied by a licensed surveyor and Form 12 inspection
        certificates must be supplied by a RPEQ engineer within 5 days of inspections.

Used in these records

About this file

File size
7.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Building Approval.pdf · 7.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.