4. ASSESSMENT MANAGER CONDITIONS
Material Change of Use
PLANNING
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to
the use commencing, and then compliance maintained at all times while the use continues.
2. Prior to lodgement of a Building permit (Private Certification) for the proposed development,
amended plans must be lodged with Council demonstrating compliance with the:
a. Medium Density Residential Zone Code AO14.1, AO14.2 and AO14.4 or PO14 by:
i. Incorporating further articulation and additional design elements in the Safari Street
(southern) elevation which will include defining the roofline to include barge capping
a minimum of 300mm to the satisfaction of the Planning Manager.
b. Inclusion on facilities for washing clothes without exceeding the maximum plot ratio of
0.4:1.
Approved Plans
3. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
DA1.04 H Proposed Site Plan 25/11/2022
DA2.01 H Ground Floor Plan 25/11/2022
DA2.02 H Level 01 Plan 25/11/2022
DA2.03 H Roof Plan 25/11/2022
DA3.01 H North & East Elevation 25/11/2022
DA3.02 H South & East Elevation 25/11/2022
DA3.03 H Sections 25/11/2022
Currency Period
4. This development approval lapses if the use has not happened by 5 January 2029, unless
an application to extend the currency period is approved by Council.
Building Height
5. The maximum height of the development must not exceed 8 metres above the ground level.
6. Certification must be submitted to Council from a Licensed Surveyor which certifies that the
building does not exceed the maximum height requirement of this Decision Notice.
Performance Bond
7. Security in the form of a cash bond or trading bank guarantee to the sum of $20,000 must
be submitted to Council, to secure performance of all conditions of this approval, prior to the
issue of a Building Works or prior to pre-start meeting. The cash bond or trading bank
guarantee will be returned on performance of the conditions of approval less any costs
incurred by Council in respect of enforcing performance of this permit. Council reserves the
right to call upon the bond or guaranteed sum to effect compliance with conditions.
Page 2 of 19
Document Set ID: 22234003
Version: 3, Version Date: 10/01/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Building Approval.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.