Original PDF page 15, section 1. The text section number identifies this passage in the reader.
b. removal of the existing property access and reinstatement of the kerb, footpath and
verge area to match the balance of the site frontage, including the provision of topsoil
and turf where the existing verge is grassed.
Site Access and Driveways
17. A sealed access driveway must be provided from Safari Street and Delorme Street to all
parking and manoeuvring areas of the development. The works must be undertaken
generally in accordance with the conditions of this Decision Notice and RECOR’s Roads &
Drainage Layout Plan (20220130-C40) dated 6 December 2022.
Car Parking
18. The site must be provided with a minimum of 3 car parking. The works must be undertaken
in accordance with the conditions of this Decision Notice be generally in accordance with
Black Wood Architecture & Design’s Ground Floor Plan (202229 – DA2.01) dated 25
November 2022.
Stormwater Drainage
19. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken generally in accordance with the conditions of
this Decision Notice and RECOR’s Roads & Drainage Layout Plan (20220130-C40) dated 6
December 2022.
Services
20. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
21. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Easements
22. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
23. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
24. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
25. All fill and associated batters must be undertaken generally in accordance with the conditions
of this Decision Notice, be generally in accordance with RECOR’s Bulk Earthworks Plan
(20220130-C30) dated 21 October 2022, and contained entirely within the subject site unless
written permission from the respective landowner(s) is provided to Council.
26. All retaining walls must be designed and constructed in accordance with the planning scheme
and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
safety fence.
Page 4 of 19
Document Set ID: 22234003
Version: 3, Version Date: 10/01/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Building Approval.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.