Council archive · source document
Building Approval · MCU22/0116.01
Original PDF page 25, section 1. The text section number identifies this passage in the reader.
86. On Maintenance management includes:
a. Establishing and maintaining the works in accordance with the intent and requirements
of all approvals.
b. To aesthetically compliment the surrounding local area.
c. Rectification of works failing ‘on ground’ to a solution that still meets approval intents.
d. Replacement of dead or poorly performing plants.
Off Maintenance
87. Prior to requesting an Off Maintenance inspection the following must be provided:
a. Written request of bond release.
*(Refer to Advisory Note)
Building Works (Demolition)
Performance Bond
88. Security in the form of a cash bond or trading bank guarantee to the sum of $5,000 must be
submitted to Council prior to commencing demolition to secure the demolition conditions of
this approval. The cash bond or trading bank guarantee will be returned on performance of
the demolition conditions of this approval less any costs incurred by Council in respect of
enforcing performance of these demolition conditions. Council reserves the right to call upon
the bond or guaranteed sum to effect compliance with conditions.
Works
89. Demolition must be undertaken in a manner that causes no detrimental effect upon the
amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-borne
hazards, atmospheric pollutants (including dust or odours) nuisance or any other emissions
in accordance with the nuisance provisions of the Environmental Protection Act 1994.
Waste management
90. A Waste Management Plan (demolition) must be submitted in accordance with Planning
Scheme Policy PSP10 - Waste Management and approved by Council’s Waste Coordinator
prior to issue of a development permit for Building Works for demolition, removal or
relocation.
The purpose of the Waste Management Plan is to facilitate the segregation of waste for the
effective reuse and recycling of such materials. Segregated wastes attract significantly
reduced disposal fees at the landfill with some items free. Higher gate fees are charged for
mixed waste.
Waste storage areas must provide for adequate separation of all reusable, recyclable and
waste materials. These must be located so that they are convenient and safe to use.
The Plan must contain the following information:
a. The areas for the storage and separation of waste shown on a site plan;
b. A waste management table as indicated below is to be completed showing how waste
material is to be segregated - recycled – reused or disposed; and
c. Table – Waste Management Table
Page 14 of 19
Document Set ID: 22234003
Version: 3, Version Date: 10/01/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Building Approval.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.