Council archive · source document
Part 11 of 37 Appendix 9 Ecological Assessment Report MCU12/0208
Very large file (123 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Noosa on Weyba
<..r., c:arclnD~
Performance Criteria Acceptable Measures Development Response
Where vegetation clearing is required, disturbance to habitat and
(a)retention of existing native
environmental values will be minimised through staging of the
vegetation;
works over an appropriate timeframe.
(b)maximisation of natural
Substantial rehabilitation and landscaping works will also be
regeneration and recruitment;
undertaken as of the
part proposed development, thereby
(c) promotion of the site’s pre-
promoting establishment of the site’s pre-clearing structural and
European clearing structural and floristic qualities. In turn, rehabilitation works will ensure that
floristic qualities;
natural regeneration and recruitment are maximised.
(d)minimisation of edge effects A site-specific maintenance schedule will be developed so as to
through small edge to area ratios and that rehabilitated and
ensure landscaped areas remain weed-
suitable planting;
free.
(e) prom otion of the weed free
succession of the area with minimal
ongoing management; and
(f) minimisation of disturbance to
habitat and environmental values of
the site through the staging of work
over an appropriate timeframe
19 November 2012
C:\W\01 Projects\51 01-19 Noosa@Weyba DA\wp\EAR\Maroochy Codes 16112012.doc Page 4 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 11 of 37 Appendix 9 Ecological Assessment Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 123 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.