Noosa on Weyba
                                                                                                                                                                      <..r., Cardno"
Performance Criteria                       Acceptable Measures                                                                   Development Response

                                           plant species so that a locally representative community is provided.
                                           AND

                                           A1.4    Buildings, structures    and   on-site    infrastructure    are     located
                                           outside the vegetated buffer areas provided in accordance with A 1.1              -




                                           A1.3.

P2 The hydrologic regime of                A2.1 The existing hydrologic regime of surface and ground waters to                   The proposal complies with P2.
wetland areas is maintained or             and from a wetland is not altered through channelisation, redirection                 No Significant Coastal Wetlands, Local Wetland or waterways
enhanced to protect its natural
                                           or   interruption of flows, other than where necessary for the natural                are    mapped within the site in Figure 4-2.1.2.
integrity.
                                           enhancement of the wetland.
                                                                                                                                 Notwithstanding this fact the Noosa on Weyba proposal:
                                           AND
                                                                                                                                        does not propose and modification       to   existing wetland
                                           A2.2 No interference      or   modification of channels within         a   wetland           areas; and
                                           occurs, other than where necessary for the natural enhancement of                            is based on WSUD principles, as detailed in Cardno
                                           the wetland.
                                                                                                                                        (2012a),and as such will preserve the hydrology and water
                                                                                                                                        qualities of adjacent wetland areas.


P3 Stream integrity and in-                A3.1 No direct interference or modification of the waterway channel or                The proposal complies with P5.
stream habitat are protected or            instream habitat occurs other than where necessary for the natural                                                                   sl
                                                                                                                                 An   unmapped and heavily modified 1          order ephemeral
enhanced.
                                           enhancement of the waterway.                                                          tributary of Keyser Creek is located within the site. No direct
                                           AND                                                                                   interference or modification of the waterway channel or
                                                                                                                                 instream habitat will occur as a result of the proposed
                                           A3.2 Where enhancement is necessary, the                  principle    of natural
                                           channel              is   followed.    That
                                                                                                                                 development.
                                                       design                               is,   hydraulic    conveyance
                                                                                                                                 Should    enhancement of the waterway be necessary, the
                                           requirements of engineered        or   affected channels      are     maintained,
                                           while environmental values are improved.                                              principle of natural channel design will be followed. Specifically,
                                                                                                                                 hydraulic conveyance requirements of engineered or affected
                                                                                                                                 channels will be maintained and while environmental values
                                                                                                                                 improved.

P4 Storm water        discharges are       A4.1 Water     entering vegetated buffers adjacent to waterways and                   The proposal complies with P4.

treated      before      entering    the   wetlands meet the water          quality objectives     set out in         Planning   As detailed in Cardno (2012a)the Noosa on Weyba proposal is
waterway      or   wetland     buffer to   Scheme Policy 5: Operational Works.                                                   based     on   best   practice WSUD and as such incorporates a
prevent adverse impacts on the                                                                                                   range of measures to          ensure that appropriate water quality

buffer’s     integrity   and    on   the                                                                                         objectives are met.
receiving waters.                                                                                                                A   site-specific Stormwater Management Plan which complies
                                                                                                                                 with   the objectives stated in Planning Scheme Policy 5:




                                                                                                                                                                                     19 November 2012
C:\W\01 Projects\51 01-19 Noosa@Weyba DA\wp\EAR\Maroochy Codes 16112012.doc                                                                                                                 Page 6 of 7

Used in these records

About this file

File size
123 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 11 of 37 Appendix 9 Ecological Assessment Report MCU12_0208.pdf · 123 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.