Performance Criteria Acceptable Measures Development Response
plant species so that a locally representative community is provided.
AND
A1.4 Buildings, structures and on-site infrastructure are located
outside the vegetated buffer areas provided in accordance with A 1.1 -
A1.3.
P2 The hydrologic regime of A2.1 The existing hydrologic regime of surface and ground waters to The proposal complies with P2.
wetland areas is maintained or and from a wetland is not altered through channelisation, redirection No Significant Coastal Wetlands, Local Wetland or waterways
enhanced to protect its natural
or interruption of flows, other than where necessary for the natural are mapped within the site in Figure 4-2.1.2.
integrity.
enhancement of the wetland.
Notwithstanding this fact the Noosa on Weyba proposal:
AND
does not propose and modification to existing wetland
A2.2 No interference or modification of channels within a wetland areas; and
occurs, other than where necessary for the natural enhancement of is based on WSUD principles, as detailed in Cardno
the wetland.
(2012a),and as such will preserve the hydrology and water
qualities of adjacent wetland areas.
P3 Stream integrity and in- A3.1 No direct interference or modification of the waterway channel or The proposal complies with P5.
stream habitat are protected or instream habitat occurs other than where necessary for the natural sl
An unmapped and heavily modified 1 order ephemeral
enhanced.
enhancement of the waterway. tributary of Keyser Creek is located within the site. No direct
AND interference or modification of the waterway channel or
instream habitat will occur as a result of the proposed
A3.2 Where enhancement is necessary, the principle of natural
channel is followed. That
development.
design is, hydraulic conveyance
Should enhancement of the waterway be necessary, the
requirements of engineered or affected channels are maintained,
while environmental values are improved. principle of natural channel design will be followed. Specifically,
hydraulic conveyance requirements of engineered or affected
channels will be maintained and while environmental values
improved.
P4 Storm water discharges are A4.1 Water entering vegetated buffers adjacent to waterways and The proposal complies with P4.
treated before entering the wetlands meet the water quality objectives set out in Planning As detailed in Cardno (2012a)the Noosa on Weyba proposal is
waterway or wetland buffer to Scheme Policy 5: Operational Works. based on best practice WSUD and as such incorporates a
prevent adverse impacts on the range of measures to ensure that appropriate water quality
buffer’s integrity and on the objectives are met.
receiving waters. A site-specific Stormwater Management Plan which complies
with the objectives stated in Planning Scheme Policy 5:
19 November 2012
C:\W\01 Projects\51 01-19 Noosa@Weyba DA\wp\EAR\Maroochy Codes 16112012.doc Page 6 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 11 of 37 Appendix 9 Ecological Assessment Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 123 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.