Council archive · source document
Part 11 of 37 Appendix 9 Ecological Assessment Report MCU12/0208
Very large file (123 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Noosa on Weyba
<..r., Cardno"
Specific outcomes Probable solutions Assessment of Impacts and Recommendations
Lake Macdonald No solution provided. The proposal complies with 012.
012 Vegetation within 400m of the full The proposed development is located approximately 9 km from Lake
ponded water within Lake Macdonald is
McDonald.
retained.
Steep slopes No solution provided. The proposal complies with 013.
013 Vegetation onsteep slopes is There are no steep slopes within the site.
retained and managed to avoid erosion
and landslide and to protect natural
resources and values.
Engineering and site works 514.1 Works, including roads, driveways, fences, The proposal does/would comply with 014.
014 Development is sited and sewer lines and other infrastructure--
designed The proposed plan of development locates the majority of new
to- a) do not transect areas of vegetation; or
roadways and services (i.e. reticulated water, sewerage etc) within:
a) provide adequate separation distance b) are co-located within a combined utility
areas that are not identified as Remnant Vegetation, Essential
between the vegetation to be corridor; and
Habitat, Koala Bushland Habitat or Environmental Protection Areas;
protected and the development to c) provide for fauna underpasses, speed
avoid disturbing, destabilising and or
reduction devices and associated fencing,
deoxygenating any tree or altering lighting and warning signs, where within existing clearing that traverse the above areas.
the drainage;
appropriate; As detailed in Section 5.6 of the EAR the location and design of
b) avoid traversing or fragmenting AND
roadways has given specific consideration to issues of habitat
vegetation or habitats for significant 514.2 Development within adjacent to areas of
or
flora and fauna species; and fragmentation and safe fauna movement.
vegetation, incorporate fauna friendly fences;
avoid barriers faunal As detailed in Section 5.7 of the EAR, detailed strategies will be
c) creating to
movement. implemented to ensure that vegetation identified for retention is not
AND
adversely impacted by construction activities.
514.3 Vegetation is protected from interference
resulting from clearing or construction activities by-
a) clearly marking vegetation to be retained
with flagging tape;
b) installing protective fencing around the
dripline of the vegetation and avoid filling
and excavation in these fenced areas; and
c) ensuring stock piling, storage and vehicle
parking occur outside the identified
vegetation areas;
AND
14.4 Low impact construction techniques are used
C:\W\01 Projects\51 01-19 Noosa@Weyba DA\wp\EAR\Noosa 16112012.doc Page 6 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 11 of 37 Appendix 9 Ecological Assessment Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 123 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.