2 ONE WAY
SITECHECK VALVE
COVER =47.41%
7 . . .
RISING
330° 43'05"
. . .
TO K & C
MAIN
30.614
. . .
2000
2
C7.0
Legend:
JETSKI
8 5 1 1. Grated Drain across driveway set at a
level higher than RL 2.1 Drain to 2. Outlet
PANEL LIFT DOOR
STORE 9
GATES
1
4.5 x 3.5
TURN AROUND
DRIVEWAY
1 to 2 fitted with Rhinoflex Duckbill check
.0 C7.0 valve to limit backflow.
RL 1.160
3
CANOE RACK
6 2. Atlantis Matrix Drainage cells for
infiltration of storm water into ground.
BASEMENT 11 10 9 8
240° 43'05"
GARDEN
20.117
3. Storage Area (wet area) set above top
CANAL
12.8 x 10.0
3.5 x 2.0 LIFT
RL 0.100 1.5 x 1.5 7
12
6
level of existing revetment wall. Fall to
WITTA CIRCLE
13
14
15
5
4
rear of allotment.
16 3
17 2
STORE ROOM 18 1 4. Fully tanked concrete basement walls
3.5 x 2.2
UP
60° 43'05"
and floor, including driveway ramp and
20.117
FOYER
adjacent retaining walls.
GLASS WALL
2.0 x 1.5
RL 250 WINE CELLAR
2.9 x 1.0
POOL PLANT
10
ROOM
5. Grated drain and oversize drain (to
ABOVE SEAT
3.5 x 1.9 avoid blockage) to 6.
MUD
GLASS WALL WITH FEATURE TIMBERS
ROOM
2.9 x 2.0
6. Baffled pump well (primary and
CUPBOARD
secondary chambers) with a pump for
LINE OF V
each chamber. A grated inlet for the
GLASS WALL
VOID 6165
BATH FG secondary chamber. 2(No.) pumps
2.9 x 2.0 SH
(primary and backup pump). Rising main
GYM SLD WC
SLD
WATER TANK STORE ROOM to 7 via air break above 7.
6.6 x 5.5
3.5 x 5.5
POND
7. Grated pit and gravity drain to back of
GLASS WALL
3.2 x 3.2
0.3m MAX SAUNA
UP
2.9 x 2.5 kerb adaptor.
16 1
15 2
14 3
13 12 4
MIRROR
11 10 9 8 7 6 5 8. Water Level Monitor battery driven from
pump supply batteries.
2000
9. Channel Drain along wall base in slab
30.614
profile. Drain to 5.
150° 43'05"
10. Battery Bank (6hr capacity) and
Basement Waterproofing Methodology 4 Generator backup. Provide wall mounted
instruction panel, detailing the operation
-The basement will be constructed as a tanked (dry) waterproof box. The retaining walls - The pumps are to be served via a battery bank (UPS-uninterrupted power supply) with at and on-going maintenance of the system.
adjacent to the driveway and the driveway ramp will also be tanked integrally with the least 6hr operating capacity but connected to a mains supply recharge. A backup
basement. generator is to be provided to recharge the batteries in the event of an extended power
Minimal volumes of storm water will enter the basement via the driveway ramp into the outage. The generator is to be located in the basement with exhaust fumes extracted to
basement. This will be captured in part via a grated drain running across the driveway roof level. The generator is to have electric start capabilities switched in the event of low
which is set at a level to allow fall into a storm water soakage pit constructed adjacent battery charge and extended power outage DEBUILD T/A
the basement. The outflow point if the drain into the pit will be fitted with a rubber - The rising main from the pump set is to be extended to surface and drained above a level SCG consulting ENGINEERS
STRUCTURAL●CIVIL●GEOTECHNICAL
duckbill non-return. (Check) valve to stop backflow. An additional grated drain will be higher than RL.2.8m into a grated pit to provide an air break (tundish).
ABN 40 098 481 899
constructed across the driveway set at the entrance to the basement. This will drain to a - A water level monitor is to be provided in the garage at the lowest point which is set to
pump well for pumping up to ground level outside the building and allow drainage to the activate the secondary (backup) pump should the water level rise higher than the finished 1/11 PROJECT AVE NOOSAVILLE QLD 4566
street. floor level in the garage or a pre-determined freeboard level. Ph (07) 5455 5604 Fax (07) 5455 5696
- The pumpwell is to be baffled forming a primary and secondary chamber each fitted - The garage floor level and room containing the pump well configuration is to be set lower BASEMENT DRAINAGE &
than the adjacent home theatre to provide freeboard. Title:
with a Davey 0.4kw Dewatering Pump. The secondary pump will be activated following WATERPROOFING
failure of the primary pump or overflow from the primary chamber. The secondary - All roof water will be drained via a totally separate gravity system into the proposed water
Project 47 Witta Circle
chamber will have a grated inlet to capture any excess surface water. (Refer Schematic tank. The water tank is to be separated from the basement construction and is to be set Noosa Heads
Rev. - 30.01.05
Diagram Drawing B3). above the identified high groundwater level to avoid buoyancy issues. Overflow from the Rev.
tank will be via gravity drain to the kerb and channel. Date: Oct 2015 Drg No. 25353 -B2 .
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SCG 25353 Basement Drainage & De-watering - 17.11.15.pdfRelated documentApplication case desk ↗
About this file
- File size
- 581 KB (small file)
- File type
No other editions are linked here.