Original source · versioned page text
2016-09-15 Ordinary Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING AGENDA 15 SEPTEMBER 2016 PLANNING & ENVIRONMENT COMMITTEE RECOMMENDATIONS 6 SEPTEMBER 2016 – Crs Joe Jurisevic (Chair), Ingrid Jackson, Brian Stockwell, Tony Wellington Other Councillors in Attendance: Crs. Wilkie, Pardon & Glasgow 1 MCU15/0109 - DEVELOPMENT APPLICATION FOR A MATERIAL CHANGE OF USE FOR MULTIPLE HOUSING - TYPE 4 CONVENTIONAL (44 UNITS) AT RESORT DRIVE, NOOSA HEADS That Council note the report by the Coordinator Planning to the Planning & Environment Committee Meeting dated 6 September 2016 regarding Application No. MCU15/0109 for a Development Permit for a Material Change of Use for Multiple housing Type 4 - Conventional (44 units) situated at Resort Drive, Noosa Heads and: A. Approve the application in accordance with the following conditions contained in the Planning & Environment Committee Agenda dated 6 September 2016 with an amendment to conditions 25, 28 and 49 to read as follows:: 25. The development must be carried out in accordance with section 7.0 of the Bushfire Hazard Assessment and Management Plan (document ref. AA1345BFIRE Rev.3) dated July 2016 prepared by Duke Environmental listed within this Decision Notice. 28. External works, pathways, must be provided in accordance with an Operational Works approval, unless already constructed, and must include in particular: a. A new 2.0 metre wide concrete pathway must be constructed along the full length of the eastern boundary lines for Lot 6 SP178340 (this property) and Lot 3 SP 221524 (the adjoining site) generally within the created pathway reserve and to alignment protects existing trees. b. A new concrete pathway must be constructed within the unformed road reserve south to the site. This pathway shall be constructed at meandering alignment to negotiate the steepness of the terrain and the natural vegetation. This pathway must connect to the pathway along the eastern boundary and connect to the existing cul-de-sac end of Resort Drive, and shall be 2.0m wide and reduced to a minimum width of 1.5 meter where necessary to protect existing vegetation. The pathways must be designed and constructed in accordance with relevant standards and best engineering practice using method/s of construction that minimising impact on natural flora and fauna and maintenance needs also ensuring pedestrian safety. This condition is imposed pursuant to s665 of the Sustainable Planning Act 2009 being non-trunk infrastructure. 49. Where stormwater runoff from the site will enter the Noosa Springs Lake System, Quarterly monitoring is required of stormwaters directed from the development to the Noosa Springs Lake System. Monitoring must be undertaken by a suitably qualified person using NATA accredited methods for the following parameters. Nitrite plus Nitrate as N (NOx) Total Kjeldahl Nitrogen (TKN) Total Nitrogen as N (TKN + NOx) Total Nitrogen as N Total Phosphorus as P Reactive Phosphorus as P (Dissolved) Reactive Phosphorus – Filtered Page 6 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.