240913_360CC to NC_Lot 5 Majestic Dr_OPW IR Response
Figure 2 – Image of the existing channel at the rear of Lot 5 Majestic Dr photo taken by Axis Survey Based on the above parameters and a Manning’s “n” of 0.03, the flow depth for a 1% AEP event is expected to be approximately 0.13m deep at the invert of the channel. At 0.13m deep, and a 1:3 batter, the water is expected to extend 0.39m into the property. The location of the retaining wall is located 1.4m in from the property boundary. As such the proposed retaining wall is not expected to have any impact on the proposed channel flow or the freeboard of the 1% AEP. The civil design for the original subdivision was completed by TOD Consulting and assessed and deemed compliant by Noosa Council. This letter has demonstrated that the proposed retaining wall will not impact the flow of water, and hence will not impact on the original assessment of the channel at the rear of the development. Information Request Item 1, Part 2 – Response: - As demonstrated by the response to information request item 1 part 1, stormwater flows are not impacted by the proposed retaining wall. As such, the proposed batter treatment has been designed by TOD Consulting and assessed and checked for compliance by Noosa Council. It is proposed that no changes to the batter surfaces be made as part of the proposed retaining wall for the land between the base of the retaining wall and the property boundary. Information Request Item 2 - Issue: - Removal of the existing crossover. The submitted plan mentions that the existing crossover is to be removed. Council has some concerns that the removal will impact on the ability to enter
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original