Council archive · source document
Minor Change Existing Approval - MCU25 0025 01 (As Published) · MCU25/0025.01
Officer: Tess Henare
Direct Telephone: 07 5232 6245
Our Reference: MCU25/0025.01
Your Reference: BA240601
9 September 2026
KL Chadburne
C/- Evolve Building Approvals
Unit 1, 13 Norval Court
MAROOCHYDORE QLD 4558
[email protected]
Dear Sir/Madam,
Decision Notice – Minor Change
Planning Act 2016
I refer to your application received on 6 August 2026, requesting a minor change to an existing
development approval. Council on 2 September 2026 decided your requested changes.
Details of the decision are as follows:
1. APPLICATION DETAILS
Application No: MCU25/0025.01
Street address: 711 Louis Bazzo Dr, Cootharaba Qld 4565
Real property description: Lot 3 SP 100439
Planning Scheme: Noosa Plan 2020 (20 March 2026)
2. DECISION DETAILS
The following type of approval was issued on 8 July 2025:
• Development Permit for a Material Change of Use - Dwelling house (Agricultural Land and
Front Building Setback)
In relation to the request to make a minor change to the existing approval, Council on 2 September
2026, decided to approve the requested changes. The changes are detailed below.
A. Approve the change.
B. Amend condition 3.
3. CURRENCY PERIOD OF APPROVAL
The currency period for this development approval is stated in the conditions below.
ABN 97.969.214.121 PO Box 141
noosa.qld.gov.au Tewantin QLD 4565
[email protected] 07 5329 6500
Page 1 of 11
Document Set ID: 25142963
Version: 3, Version Date: 09/09/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 10 pages
Page 2
4. ASSESSMENT MANAGER CONDITIONS
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to
the use of the building commencing, and then compliance maintained at all times while the
use continues.
Currency Period
2. This development approval lapses if the use has not happened by 8 July 2031, unless an
application to extend the currency period is approved by Council.
Approved Plans
3. Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed in the table below.
Plan No. Rev. Plan/Document Name Date
CHA-001 C Site Plan 06.02.25
Prepared by AM20 Designs
CHA-002 C 06.02.25
Existing Floor Plan
Prepared by AM20 Designs
CHA-005 C 06.02.25
Existing Sub-Floor Plan
Prepared by AM20 Designs
Elevations 06.02.25
CHA-006 C
Prepared by AM20 Designs
CHA-007 C 06.02.25
Elevations
Prepared by AM20 Designs
Nature and Extent of Approved Use
4. The approved development is limited to a Dwelling House, no associated outbuildings or
shed/s form part of this approval.
Building Height
5. The maximum height of the development must not exceed 8 metres above the ground level
including where excavation is undertaken the exposed portion of the external façade of the
building.
External Colours & Finishes
6. External colours and finishes must be of muted environmental tones that blend with the
surrounding vegetation and landscape, with broad expanses of a single colour or reflective
surfaces not permitted.
Car Parking
7. A minimum of two car parking spaces must be provided on site and made available and
accessible at all times for residents. Vehicle manoeuvring areas are provided on site in
accordance with the Australian Standards for Off-street car parking so vehicles enter and
leave the site in a forward gear.
Page 2 of 11
Document Set ID: 25142963
Version: 3, Version Date: 09/09/2026
Page 3
Landscaping Works
8. Existing trees on the site must be retained, except where required to be removed to
accommodate the approved dwelling. In this regard, the removal of vegetation must not
extend beyond 5 metres of the building footprint.
9. Existing vegetation in the road reserve must be retained, unless written authorisation from
Council is granted for the clearing.
10. Trees to be retained must be protected from clearing or construction activities by:
a. clearly marking vegetation to be retained with flagging tape
b. installing protective fencing around the drip line of the vegetation
c. restricting stockpiling, storage and vehicle parking to those areas which are already
cleared
d. using low impact construction techniques around vegetation.
Earthworks
11. All cut and fill must not exceed 1.5 metres in depth relative to natural ground level.
12. All excavation/fill and associated batters must be contained entirely within the subject site
unless written permission from the respective landowner(s) is provided to Council. All
earthworks must be undertaken in accordance with the provisions of Australian Standard
AS3798: Guidelines on Earthworks for Commercial and Residential Developments.
13. All retaining walls must be designed and constructed in accordance with the planning scheme
and must be certified by an RPEQ where exceeding 1.0m in height.
14. All earthworks must include the installation and maintenance of appropriate erosion and
sediment control measures. Prescribed Water Contaminants (as defined in Schedule 10 of
Environmental Protection Regulation 2019) must not be released from the site or to waters
within the site, or be likely to be released should rainfall occur, unless all reasonable and
practicable measures are taken to prevent or minimise the release and concentration of
contamination.
15. Earthworks required on site must be carried out in accordance with Council’s Planning
Scheme Policy PSP6 - Engineering Design Standards, so as not to cause the additional
ponding of water on any adjoining lands or concentrate or direct overland flow on to an
adjoining property.
Water Supply
16. The approved dwelling must be serviced with a rainwater tank having a minimum storage
capacity of no less than 45,000 litres.
Waste Water Treatment and Disposal
17. The dwelling must be provided with an on-site wastewater treatment and effluent disposal
system having a capacity sufficient for the use*.
*(Refer to Advisory Note)
Bushfire Management
18. An accessible dam, swimming pool or water tank (in addition to day to day water supply) with
an onsite water volume of not less than 5,000 litres must be available for firefighting
purposes, located within reasonable proximity to building.
19. A water supply outlet pipe 50 millimetres in diameter and fitted with a standard fire brigade
fitting must be connected to the water supply (other than where the water supply is in a
swimming pool or dam).
Page 3 of 11
Document Set ID: 25142963
Version: 3, Version Date: 09/09/2026
Page 4
Environment
20. Sediment or any other material including building materials or waste products must not be
deposited or released into the road reserve, stormwater drain or adjacent properties.
Damage to Services and Assets
21. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
Demolition of Relevant Buildings
Codes of Development
22. Unless specifically conditioned otherwise, all works must comply with the relevant acceptable
solutions as contained in the Waste Management Code and Water Quality and Drainage
Code of the Noosa Plan 2020.
Works
23. Demolition must be undertaken in a manner that causes no detrimental effect upon the
amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-borne
hazards, atmospheric pollutants (including dust or odours) nuisance or any other emissions
in accordance with the nuisance provisions of the Environmental Protection Act 1994.
Waste Management
24. Adequate area must be provided on-site for the collection and separate storage of recyclable,
non-recyclable, vegetative and hazardous materials in their specific waste streams during
removal or demolition works.
25. All waste materials must be removed from the site to avoid causing unhealthy conditions,
with the site left clean, tidy and free from any debris.
26. Where a development permit has not been issued for the future use of the site, hard surfaced
areas including concrete slabs must be removed and disturbed areas must be revegetated
in accordance with PSP2 Landscaping of the Noosa Plan 2020. Alternatively, the site must
be turfed within 20 business days of completing the removal or demolition work.
Water Quality and Drainage
27. Erosion and sediment control is to be undertaken in accordance with the requirements of the
Water Quality and Drainage Code of the Noosa Plan. Measures are to be installed and/or
maintained until soils are stabilised by vegetation or sealed.
NOTE: It is an offence under the Environmental Protection Act 1994 to deposit or potentially
allow litter, waste, soil, or other contaminants to enter a waterway or storm water drainage
system (e.g. roadside gutter).
Health and Safety
28. All building materials containing asbestos, including asbestos cement sheeting or roofing and
lagging, are removed from the building prior to demolition or relocation.
29. Removal of building materials containing asbestos must be undertaken by a licensed
asbestos removalist.
Page 4 of 11
Document Set ID: 25142963
Version: 3, Version Date: 09/09/2026
Page 5
30. Asbestos removal work (Section 466) of the Work Health and Safety Regulation 2011
requires a licensed asbestos removalist to give notice to Workplace Health and Safety
Queensland (WHSQ) of licensed asbestos removal work at least five days before the work
commences. Notification must be made using Form 65: Notification of licensed asbestos
removal work, demolition work or emergency demolition.
31. All building materials containing asbestos products are wrapped and disposed of in
accordance with the Public Health Regulation 2006 and the Environmental Protection
Regulation 2008.
Note: Asbestos is a Regulated Waste. The Department of Environment & Science licenses
businesses that transport asbestos waste, and landfills that accept this waste.
Clearing of Vegetation
32. This development approval does not authorise the removal/clearing of vegetation from the
site.
33. Existing vegetation on Council controlled land must not be trimmed, pruned or otherwise
impacted without prior written approval from Council.
General
34. Infrastructure including reticulated water, sewerage, stormwater, and electricity must be
protected from damage and made safe to the standard required by the regulatory authority.
35. Any damage to footpaths, street plantings, natural vegetation/trees, kerb and channel,
bridges or roadways at the removal/demolition site must be repaired or reinstated to at least
pre-existing conditions.
Plumbing and Drainage
36. It is a requirement of the ‘Standard Plumbing and Drainage Regulation 2019’ that at
demolition of a building, the existing sanitary drain upstream from the connection point for a
service provider’s sewerage system must be sealed water tight. This work is deemed as
notifiable Work and must be carried out by a suitably licenced plumber who must submit an
As Constructed plan and Form 4 (Notifiable Works Form) to the QBCC (Queensland Building
Construction Commission) within 10 days of completing the work.
5. REFERENCE DOCUMENTS
Not applicable.
6. REFERRAL AGENCIES
The referral agencies applicable to this application are:
Referral Status Referral Agency and Referral Trigger Response
Address
Referral Agency State Assessment Schedule 10, Part 9, The agency provided
Response – Referral Agency Division 4, Subdivision 2, its response on 16
with conditions. (SARA) Table 4, Item 1 June 2025 (Reference
Level 4, Foundation (Planning Regulation No.2505-45930 SRA).
Place 2017) A copy of the response
is attached.
3 South Sea Islander
Way, Maroochydore
QLD 4558.
Page 5 of 11
Document Set ID: 25142963
Version: 3, Version Date: 09/09/2026
Page 6
7. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
Equitable Access and Facilities
1. The plans for the proposed building work have NOT been assessed for compliance with the
requirements of the National Construction Code - Building Code of Australia (Volume 1) as
they relate to people with disabilities. Your attention is also directed to the fact that in addition
to the requirements of the National Construction Code as they relate to people with
disabilities, one or more of the following may impact on the proposed building work:
c. the Disability Discrimination Act 1992 (Commonwealth);
d. the Anti-Discrimination Act 1991 (Queensland); and
e. the Disability (Access to Premises – Buildings) Standards.
Development Compliance Inspection
2. Prior to the commencement of the use, please contact Council's Development Assessment
Branch to arrange a Development Compliance Inspection.
Infrastructure Charges
3. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
made pursuant to the planning legislation and regulations current at the time of issue. For
further information, please refer to: https://www.noosa.qld.gov.au/Planning-and-
Development/Development-tools-and-guidelines/Infrastructure-Charges
Waste Water Treatment and Disposal System
The establishment of a waste water treatment and disposal system for the site requires a
Compliance Permit to be obtained from Council under the Plumbing and Drainage Act 2002.
The system must be designed in accordance with the Queensland Plumbing and Wastewater
Code (Department of State Development and Infrastructure & Planning, 2007) and Australian
Standard AS/NZS1547: 2000 “On-site Domestic Wastewater Management” or an alternative
solution approved through Council’s Building and Plumbing branch. Where a development
exceeds the accommodation or use of 21 or more equivalent persons a copy of an Operator’s
Licence from the relevant State will also be required.
Sustainability
4. Council encourages sustainable and energy efficient building design for all development,
including the use of sustainable building materials, energy efficient fittings, solar hot water,
photovoltaic systems (including the use of inverter/charges), solar panels, water saving
devices and rainwater harvesting.
Potential Conflict with Surrounding Uses
5. This area is zoned rural under the Noosa Plan 2020 and is intended to provide for a wide
range of rural activities including animal husbandry, aquiculture, cropping, horticulture,
roadside stalls, rural industries, forest practices, wholesale nurseries and other primary
production.
The dwelling house may be potentially impacted by emissions from these lawful uses. It is
the property owner’s responsibility to take all measures necessary to ensure the dwelling
house is developed and maintained in such a way as to mitigate potential impacts.
8. PROPERTY NOTES
Not applicable.
Page 6 of 11
Document Set ID: 25142963
Version: 3, Version Date: 09/09/2026
Page 7
9. VARIATION APPROVAL DETAILS
Not applicable.
10. FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit Required Subject of the required Development Permit
Development Permit for Building Works All building work
11. SUBMISSIONS
Not applicable.
12. RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Planning Act 2016 is attached.
13. OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available on line at
www.noosa.qld.gov.au or at Council Offices.
Yours faithfully,
Tess Henare
Development Planner | Development Assessment
Development & Regulation
Enc: Referral Agency Response
Appeal Rights
Approved Plans/Documents
cc. Referral Info – SEQNorthSARA - [email protected]
DECISION NOTICE HISTORY
• Original Decision Notice – 8 July 2025.
• Decision Notice – Minor – 2 September 2026, with an amendment to condition 2.
Page 7 of 11
Document Set ID: 25142963
Version: 3, Version Date: 09/09/2026
Page 8
Referral Agency Response
PLANNING ACT 2016 & PLANNING REGULATION 2017
Page 8 of 11
Document Set ID: 25142963
Version: 3, Version Date: 09/09/2026
Page 9
Page 9 of 11 Document Set ID: 25142963 Version: 3, Version Date: 09/09/2026 [OCR of page images] SARA role: SARA trigger: SARA reference: Assessment manager: Street address: Real property description: Applicant name: Applicant contact details: State-controlled road access permit: Human Rights Act 2019 considerations: Representations 2505-45830 SRA Referral agency Schedule 10, Part 9, Division 4, Subdivision 2, Table 4, Item 1 (Planning Regulation 2017) Development application for a material change of use within 25m of a state-controlled road 2505-45930 SRA Noosa Shire Council 711 Louis Bazzo Drive, Cootharaba Lot 3 on SP100439 AM20 Design C/- Evolve Building Approvals 1/13 Norval Court Maroochydore QLD 4558 [email protected] This referral included an application for a road access location, under section 62A(2) of Transport Infrastructure Act 1994. Below are the details of the decision: + Approved « Reference: TMR25-045784 « Date: 12 June 2025 if you are seeking further information on the road access permit, please contact the Department of Transport and Main Roads at [email protected] A consideration of the 23 fundamental human rights protected under the Human Rights Act 2019 has been undertaken as part of this decision. It has been determined that this decision does not limit human rights. An applicant may make representations to a concurrence agency, at any time before the application is decided, about changing a matter in the referral agency response (s.30 Development Assessment Rules). Copies of the relevant provisions are in Attachment 4. A copy of this response has been sent to the applicant for their information. For further information please contact Rosanna Nobile, Planning Officer, on 07 5352 9777 or via email SEQNorthSARA@d¢sdilgp.qid.gov.au who will be pleased to assist. State Assessment and Referral Agency Document Set ID: 25142963 Version: 3, Version Date: 09/09/2026 Page 2 of 7 Page 9 of 11
Page 10
Page 10 of 11 Document Set ID: 25142963 Version: 3, Version Date: 09/09/2026 [OCR of page images] Document Set ID: 25142963 Version: 3, Version Date: 09/09/2026 Yours sincerely / SHI LUMLY Jamaica Hewston Manager oc AM20 Design C/- Evolve Building Approvals, [email protected] au enc Attachment 1 - Referral agency conditions Attachment 2 - Advice to the applicant Attachment 3 - Reasons for referral agency response Attachment 4 - Representations about a referral agency response provisions Attachment 5 - Documents referenced in conditions State Assessment and Referral Agency 2505-45830 SRA Page 3 of 7 Page 10 of 11
Page 11
Appeal Rights
PLANNING ACT 2016 & PLANNING REGULATION 2017
Chapter 6 Dispute resolution (3) The appellant or, for an appeal to a tribunal, the registrar must,
within the service period, give a copy of the notice of appeal to –
Part 1 Appeal rights
(a) the respondent for the appeal; and
229 Appeals to tribunal or P&E Court
(b) each co-respondent for the appeal; and
(1) Schedule 1 of the Planning Act 2016 states –
(c) for an appeal about a development application under schedule
(a) Matters that may be appealed to –
1, table 1, item 1 – each principal submitter for the
(i) either a tribunal or the P&E Court; or development application; and
(ii) only a tribunal; or (d) for and appeal about a change application under schedule 1,
table 1, item 2 – each principal submitter for the change
(iii) only the P&E Court; and
application; and
(b) The person-
(e) each person who may elect to become a co-respondent for the
(i) who may appeal a matter (the appellant); and appeal, other than an eligible submitter who is not a principal
submitter in an appeal under paragraph (c) or (d); and
(ii) who is a respondent in an appeal of the matter; and
(f) for an appeal to the P&E Court – the chief executive; and
(iii) who is a co-respondent in an appeal of the matter; and
(g) for an appeal to a tribunal under another Act – any other
(iv) who may elect to be a co-respondent in an appeal of the
person who the registrar considers appropriate.
matter.
(4) The service period is –
(2) An appellant may start an appeal within the appeal period.
(a) if a submitter or advice agency started the appeal in the P&E
(3) The appeal period is –
Court – 2 business days after the appeal has started; or
(a) for an appeal by a building advisory agency – 10 business
(b) otherwise – 10 business days after the appeal is started.
days after a decision notice for the decision is given to the
agency; or (5) A notice of appeal given to a person who may elect to be a co-
respondent must state the effect of subsection (6).
(b) for an appeal against a deemed refusal – at any time after the
deemed refusal happens; or (6) A person elects to be a co-respondent by filing a notice of election,
in the approved form, within 10 business days after the notice of
(c) for an appeal against a decision of the Minister, under chapter
appeal is given to the person.
7, part 4, to register premises or to renew the registration of
premises – 20 business days after a notice us published under 231 Other appeals
section 269(3)(a) or (4); or
(1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
(d) for an appeal against an infrastructure charges notice – 20 the Supreme Court decides a decision or other matter under this
business days after the infrastructure charges notice is given Act is affected by jurisdictional error, the decision or matter is non-
to the person; or appealable.
(e) for an appeal about a deemed approval of a development (2) The Judicial Review Act 1991, part 5 applies to the decision or
application for which a decision notice has not been given – matter to the extent it is affected by jurisdictional error.
30 business days after the applicant gives the deemed
(3) A person who, but for subsection (1) could have made an
approval notice to the assessment manager; or
application under the Judicial Review Act 1991 in relation to the
(f) for any other appeal – 20 business days after a notice of the decision or matter, may apply under part 4 of that Act for a
decision for the matter, including an enforcement notice, is statement of reasons in relation to the decision or matter.
given to the person.
(4) In this section –
Note – decision includes-
See the P&E Court Act for the court’s power to extend the appeal
(a) conduct engaged in for the purpose of making a decision; and
period.
(b) other conduct that relates to the making of a decision; and
(4) Each respondent and co-respondent for an appeal may be heard
in the appeal. (c) the making of a decision or failure to make a decision; and
(5) If an appeal is only about a referral agency’s response, the (d) a purported decision; and
assessment manager may apply to the tribunal or P&E Court to
(e) a deemed refusal.
withdraw from the appeal.
non-appealable, for a decision or matter, means the decision or
(6) To remove any doubt. It is declared that an appeal against an
matter-
infrastructure charges notice must not be about-
(a) is final and conclusive; and
(a) the adopted charge itself; or
(b) may not be challenged, appealed against, reviewed, quashed,
(b) for a decision about an offset or refund-
set aside or called into question in any other way under the
(i) the establishment cost of trunk infrastructure identified in Judicial Review Act 1991 or otherwise, whether by the
a LGIP; or Supreme Court, another court, a tribunal or another entity; and
(ii) the cost of infrastructure decided using the method (c) is not subject to any declaratory, injunctive or other order of
included in the local government’s charges resolution. the Supreme Court, another court, a tribunal or another entity
on any ground.
230 Notice of appeal
232 Rules of the P&E Court
(1) An appellant starts an appeal by lodging, with the registrar of the
tribunal or P&E Court, a notice of appeal that- (1) A person who is appealing to the P&E Court must comply with the
rules of the court that apply to the appeal.
(a) is in the approved form; and
(b) succinctly states the grounds of the appeal. (2) However, the P&E Court may hear and decide an appeal even if
the person has not complied with the rules of the P&E Court
(2) The notice of appeal must be accompanied by the required fee.
Page 11 of 11
Document Set ID: 25142963
Version: 3, Version Date: 09/09/2026
Used in these records
Minor Change Existing Approval - MCU25 0025 01 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 367 KB (small file)
- File type