ORDINARY MEETING MINUTES 18 AUGUST 2022
b. installing protective fencing around the drip line of the vegetation
c. restricting stockpiling, storage and vehicle parking to those areas which
are already cleared
d. using low impact construction techniques around vegetation.
Damage to Services and Assets
22. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the
development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
Flood
23. In response to the potential flood risks, material and surface treatments below the
defined flood event must be resilient to water damage and do not include wall
cavities that are susceptible to the intrusion of water.
24. No habitable rooms are to be located on the ground floor.
Demolition
25. Security to the value of $5,000 must be provided to Council’s Building and
Plumbing Services prior to the issue of the Development Approval for Building
Works – demolition of Unit 17 & 19. The security must be in the form of a cash
bond or bank guarantee, for security against satisfactory completion of works.
26. Any damage to footpaths, street plantings, natural vegetation/trees kerb and
channel, bridges or roadways at the removal site, the new site or between the sites
must be repaired or reinstated to at least pre-existing conditions.
27. All waste materials are removed from site.
28. Litter, erosion and sediment control measures are to be installed and/or maintained
until soils are stabilised by vegetation or sealed. NB: it is an offence under the
Environmental Protection Act 1994 to deposit or potentially allow litter, waste, soil,
or other contaminants to enter a waterway or storm water drainage system (e.g.
roadside gutter).
29. Removal of building materials containing asbestos must be undertaken by a
licensed asbestos removalist.
30. Asbestos removal work (Section 466) of the Work Health and Safety Regulation
2011 requires a licensed asbestos removalist to give notice to Workplace Health
and Safety Queensland (WHSQ) of licensed asbestos removal work at least five
days before the work commences. Notification must be made using Form 65:
Notification of licensed asbestos removal work, demolition work or emergency
demolition.
31. All building materials containing asbestos products are wrapped and disposed of
in accordance with the Public Health Regulation 2006 and the Environmental
Protection Regulation 2008. NB: Asbestos is a Regulated Waste. The Department
of Environment & Science licenses businesses that transport asbestos waste, and
landfills that accept this waste.
32. All building materials containing asbestos, including asbestos cement sheeting or
roofing and lagging are removed from the building prior to demolition/relocation.
Page 12 of 55
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.