2022-08-18 Ordinary Meeting Minutes

of 55

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

ORDINARY MEETING MINUTES   18 AUGUST 2022




                            Page 47 of 55

ORDINARY MEETING MINUTES                                                                        18 AUGUST 2022

     Corporate Plan Key   Operational Initiatives        Outcomes                     Responsible     Update                                          Status Q3     er.)
     Focus Areas                                                                      Areas/Officers
                                                                                                      Submitted grant funding applications for Noosa
                                                                                                      Civic and Cooroy Transit Hub Investigations.
                          Implement the Walking and _| Facilitation of walking and    Infrastructure — | Walking and Cycling implementation plan is well | Ontrack | On track
                          Cycling Strategy               cycling for transport,       Planning, Design| underway with the design completion of 9 of the
                                                         recreation, health and       & Delivery,     12 shire wide pathway links/expansions and
                                                         tourism                      Infrastructure | construction completion of six (6) pathways.
                                                                                      Planning,
                                                                                      Design &
                                                                                      Delivery
                                                                                      Manager
                          Noosa Hinterland recreation | Increased recreational        Environmental | Trail S Detailed Audit and negotiations with    Ontrack | Ontrack
                          trails upgrade/implement       opportunities and improved | Services,       QPWS regarding realignment opportunities have
                          Noosa Trails Master Plan,      multi use trails and linkages | Infrastructure been completed. Initial Environmental and
                          Audit of the trail network     within the trails network   Planning,        Cultural Heritage Field Assessments completed.
                                                                                      Design &        Preparation of tender documents for design and
                                                                                     Delivery.        construct contract underway.
                                                                                      Infrastructure | Planning and design work has commenced on
                                                                                      Planning        trail head and trail node facilities including an
                                                                                      Design &        update of the Noosa Trail Signage Manual.
                                                                                      Seite           Cooran Horse Yards upgrade completed June
                                                                                       janager
                                                                                                      2022.
                                                                                                      Council have approved the Noosa Biosphere Trail
                                                                                                      Concept. This is the basis for a series of audits to
                                                                                                      identify preferred alignments and the
                                                                                                      development of an implementation plan.
                                                                                                      Display maps and design work for the Noosa
                                                                                                      Biosphere Trail and Trail 5 are currently being
                                                                                                      prepared for display at the Pomona Markets along
                                                                                                      with draft signage manual & guidelines. The
                                                                                                      Noosa Trail Masterplan Stakeholder Group will be
                                                                                                      invited to attend the display.
                          Pathways expansion              Improved access and         Infrastructure  Grant submission for Noosa Parade corridor      Ontrack | On track
                                                         connectivity within the shire Planning, Design upgrade stage 2 submitted.
                                                                                      & Delivery
                                                                                      Infrastructure  Grants submissions for Cooroy Train Station and
                                                                                      Planning Design| Noosaville, Good Shepherd College submitted.
                                                                                      & Delivery          :           .
                                                                                      Manager         Design of the additional shared pathway at Noosa
                                                                                                      Drive, Halse Lane to Sunshine Beach Rd has
                                                                                                      been awarded and has commenced.

                                                                                                  Page 47 of 55
Log in to download the original file

2022-08-18 Ordinary Meeting Minutes(PDF, 10MB).pdf · 10.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.