Corporate Plan Key Operational Initiatives Outcomes Responsible Update Status Q3 er.)
Focus Areas Areas/Officers
Submitted grant funding applications for Noosa
Civic and Cooroy Transit Hub Investigations.
Implement the Walking and _| Facilitation of walking and Infrastructure — | Walking and Cycling implementation plan is well | Ontrack | On track
Cycling Strategy cycling for transport, Planning, Design| underway with the design completion of 9 of the
recreation, health and & Delivery, 12 shire wide pathway links/expansions and
tourism Infrastructure | construction completion of six (6) pathways.
Planning,
Design &
Delivery
Manager
Noosa Hinterland recreation | Increased recreational Environmental | Trail S Detailed Audit and negotiations with Ontrack | Ontrack
trails upgrade/implement opportunities and improved | Services, QPWS regarding realignment opportunities have
Noosa Trails Master Plan, multi use trails and linkages | Infrastructure been completed. Initial Environmental and
Audit of the trail network within the trails network Planning, Cultural Heritage Field Assessments completed.
Design & Preparation of tender documents for design and
Delivery. construct contract underway.
Infrastructure | Planning and design work has commenced on
Planning trail head and trail node facilities including an
Design & update of the Noosa Trail Signage Manual.
Seite Cooran Horse Yards upgrade completed June
janager
2022.
Council have approved the Noosa Biosphere Trail
Concept. This is the basis for a series of audits to
identify preferred alignments and the
development of an implementation plan.
Display maps and design work for the Noosa
Biosphere Trail and Trail 5 are currently being
prepared for display at the Pomona Markets along
with draft signage manual & guidelines. The
Noosa Trail Masterplan Stakeholder Group will be
invited to attend the display.
Pathways expansion Improved access and Infrastructure Grant submission for Noosa Parade corridor Ontrack | On track
connectivity within the shire Planning, Design upgrade stage 2 submitted.
& Delivery
Infrastructure Grants submissions for Cooroy Train Station and
Planning Design| Noosaville, Good Shepherd College submitted.
& Delivery : .
Manager Design of the additional shared pathway at Noosa
Drive, Halse Lane to Sunshine Beach Rd has
been awarded and has commenced.
Page 47 of 55See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.