2022-08-18 Ordinary Meeting Minutes

of 55

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

ORDINARY MEETING MINUTES   18 AUGUST 2022




                            Page 50 of 55

ORDINARY MEETING MINUTES                                                                     18 AUGUST 2022

     Corporate Plan Key  Operational Initiatives        Outcomes                   Responsible     Update                                        Status Q3     fer.
     Focus Areas                                                                   Areas/Officers
                         Asset management renewal | Maintenance of assets to       Asset Planning/ | Delivery of Shire Level 3 Bridge and Structure Ontrack | Completed
                         program                        required standards and     Asset Planning condition assessments currently underway.
                                                        achievement of sustainable | Coordinator | shire reseal program completed for 2021/22.
                                                        outcomes in safety,
                                                        minimising lifecycle and                   Shire Stormwater CCTV Condition Assessment
                                                        project delivery costs                     program underway.

                          Noosa Heads Parade Corridor} Improve community           Infrastructure  Noosa Parade corridor upgrade;                On track    On track
                         storm water drainage upgrade] connectivity and create a   Planning,       Stage 1 works have been completed;
                                                        collective vision. Foster  Design &        Stage 2 - Laguna Dr to Ravenwood Dr has
                                                        successful social networks Delivery/       commenced:
                                                        Sas ha        ee           Infrastructure | stage 3 - Ravenwood Dr to Garth Prowd bridge,
                                                        lene  Wiel                 Seclan a        commences mid July 2022.
                                                                                   hoe Mar         Overall completion forecast 31 Oct 2022 prior to
                                                                                        ry         Triathlon event.

                                                                                               Page 50 of 55
Log in to download the original file

2022-08-18 Ordinary Meeting Minutes(PDF, 10MB).pdf · 10.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.